[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-865-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":709},{"id":5,"name":6,"category":7,"favorite":8},865,"土建方向-岗位技能","建筑工程",0,6,50,399,[13,38,52,67,82,97,112,127,142,157,172,187,201,213,227,241,255,269,283,297,311,324,339,353,367,381,396,411,426,440,454,467,481,495,507,521,534,548,562,576,590,601,615,629,643,658,673,687,697,703],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1276347,2,"多选题","水泥进场时应对其品种、级别、包装或散装仓号、出厂日期等进行检查,并应对其( )进行复验,其质量必须符合《通用硅酸盐水泥》GB175-2007等的规定。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","重量",false,{"key":24,"text":25,"correct":26},"B","强度",true,{"key":28,"text":29,"correct":26},"C","安定性",{"key":31,"text":32,"correct":26},"D","其他必要的性能指标",{"key":34,"text":35,"correct":22},"E","颜色","BCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":51,"analysis":37},1276348,"常用水泥的技术要求主要有( )。",[42,44,46,48,49],{"key":20,"text":43,"correct":26},"凝结时间",{"key":24,"text":45,"correct":26},"体积安定性",{"key":28,"text":47,"correct":22},"膨胀性",{"key":31,"text":25,"correct":26},{"key":34,"text":50,"correct":22},"吸热性","ABD",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":66,"analysis":37},1276349,"水泥按其用途及性能可分( )。",[56,58,60,62,64],{"key":20,"text":57,"correct":26},"通用水泥",{"key":24,"text":59,"correct":26},"专用水泥",{"key":28,"text":61,"correct":26},"特性水泥",{"key":31,"text":63,"correct":22},"硅酸盐水泥",{"key":34,"text":65,"correct":22},"粉煤灰水泥","ABC",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},1276350,"楼地面工程质量控制点包括( )。",[71,73,75,77,79],{"key":20,"text":72,"correct":26},"隔离层的设置",{"key":24,"text":74,"correct":22},"防水材料铺设",{"key":28,"text":76,"correct":22},"基层设置",{"key":31,"text":78,"correct":26},"防水层的质量",{"key":34,"text":80,"correct":22},"垫层的设置","AD",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1276351,"砌体工程质量控制点有( )。",[86,88,90,92,94],{"key":20,"text":87,"correct":26},"砖的规格、性能、强度等级",{"key":24,"text":89,"correct":26},"砂浆的规格、性能、配合比及强度等级",{"key":28,"text":91,"correct":22},"砂浆的用量",{"key":31,"text":93,"correct":26},"砌体转角和交接处的质量",{"key":34,"text":95,"correct":26},"轴线位置、垂直度偏差","ABDE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1276352,"卷材外观质量、品种规格应符合现行国家标准或行业标准;卷材及其胶粘剂应具有良好的( )。",[101,103,105,107,109],{"key":20,"text":102,"correct":26},"耐水性",{"key":24,"text":104,"correct":26},"耐久性",{"key":28,"text":106,"correct":26},"耐刺穿性",{"key":31,"text":108,"correct":26},"耐腐蚀性",{"key":34,"text":110,"correct":22},"耐磨性","ABCD",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1276353,"大体积混凝土防止因干缩、温差等原因产生裂缝,应采取以下措施( )。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"采用高热或中热水泥",{"key":24,"text":119,"correct":26},"掺人减水剂、缓凝剂、膨胀剂等外加剂",{"key":28,"text":121,"correct":26},"在炎热季节施工时,应采取降低原材料温度、减少混凝土运输时吸收外界热量等降温措施",{"key":31,"text":123,"correct":26},"混凝土内部预埋管道,进行冷水散热",{"key":34,"text":125,"correct":26},"应采取保温保湿养护","BCDE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1276354,"预制桩工程质量控制施工质量控制点有( )。",[131,133,135,137,139],{"key":20,"text":132,"correct":26},"桩体质量",{"key":24,"text":134,"correct":22},"地质条件",{"key":28,"text":136,"correct":26},"承载力",{"key":31,"text":138,"correct":26},"桩顶标高",{"key":34,"text":140,"correct":26},"停锤标准","ACDE",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},1276355,"土方开挖工程的施工质量控制点有( )。",[146,148,150,152,154],{"key":20,"text":147,"correct":26},"基底标高",{"key":24,"text":149,"correct":26},"基坑边坡",{"key":28,"text":151,"correct":22},"顶面标高",{"key":31,"text":153,"correct":22},"地下水位",{"key":34,"text":155,"correct":26},"基底土质","ABE",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":171,"analysis":37},1276356,"质量记录资料是施工承包单位进行工程施工或安装期间,实施质量控制活动的记录,主要包括( )。",[161,163,165,167,169],{"key":20,"text":162,"correct":26},"施工现场质量管理检查记录资料",{"key":24,"text":164,"correct":22},"施工过程中需注意的问题",{"key":28,"text":166,"correct":26},"工程材料质量记录",{"key":31,"text":168,"correct":26},"施工过程作业活动质量记录资料",{"key":34,"text":170,"correct":22},"施工方法、质量要求和验收标准","ACD",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":186,"analysis":37},1276357,"施工单位的自检体系表现在( )。",[176,178,180,182,184],{"key":20,"text":177,"correct":26},"作业活动的作业者在作业结束后必须自检",{"key":24,"text":179,"correct":22},"施工过程中需注意的问题相互监督提醒",{"key":28,"text":181,"correct":22},"可能出现意外的措施及应急方案铭记于心",{"key":31,"text":183,"correct":26},"施工单位专职质检员的互检",{"key":34,"text":185,"correct":26},"不同工序交接、转换必须由相关人员交接检查","ADE",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":66,"analysis":37},1276358,"劳动组织涉及从事作业活动的( )。",[191,193,195,197,199],{"key":20,"text":192,"correct":26},"操作人员",{"key":24,"text":194,"correct":26},"管理人员",{"key":28,"text":196,"correct":26},"相关制度要健全",{"key":31,"text":198,"correct":22},"施工人员",{"key":34,"text":200,"correct":22},"投资方",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":66,"analysis":37},1276359,"技术交底的内容包括( )。",[205,206,207,209,211],{"key":20,"text":170,"correct":26},{"key":24,"text":164,"correct":26},{"key":28,"text":208,"correct":26},"可能出现意外的措施及应急方案",{"key":31,"text":210,"correct":22},"安全方面的技术保障措施",{"key":34,"text":212,"correct":22},"质量保证措施",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":111,"analysis":37},1276360,"质量控制点选择的一般原则( )。",[217,219,221,223,225],{"key":20,"text":218,"correct":26},"施工中的薄弱环节,或质量不稳定的工序、部位或对象",{"key":24,"text":220,"correct":26},"施工过程中的关键工序或环节以及隐蔽工程",{"key":28,"text":222,"correct":26},"采用新技术、新工艺、新材料的部位或环节",{"key":31,"text":224,"correct":26},"施工上无足够把握的、施工条件困难的或技术难度大的工序或环节",{"key":34,"text":226,"correct":22},"工程量大的分项工程",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":96,"analysis":37},1276361,"下列属于审查施工组织设计的四个基本要求的是( )。",[231,233,235,237,239],{"key":20,"text":232,"correct":26},"施工组织设计应有单位负责人签字",{"key":24,"text":234,"correct":26},"施工组织设计应符合施工合同要求",{"key":28,"text":236,"correct":22},"质量第一、安全第一",{"key":31,"text":238,"correct":26},"施工组织设计应由专业监理工程师审核后,经总监理工程师签字",{"key":34,"text":240,"correct":26},"现施工组织设计中存在问题应提出修改意见,由承包单位修改后重新报审",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":156,"analysis":37},1276362,"影响材料质量的因素主要是材料的( )等。",[245,247,249,251,253],{"key":20,"text":246,"correct":26},"成分",{"key":24,"text":248,"correct":26},"物理性质",{"key":28,"text":250,"correct":22},"密度",{"key":31,"text":252,"correct":22},"取材地点",{"key":34,"text":254,"correct":26},"化学性能",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":171,"analysis":37},1276363,"对于施工机械设备的选择,应注意( )。",[259,261,263,265,267],{"key":20,"text":260,"correct":26},"设备形式应与施工对象的特点及施工质量要求相适应",{"key":24,"text":262,"correct":22},"以经济性为原则",{"key":28,"text":264,"correct":26},"考虑施工机械的技术性能、工作效率",{"key":31,"text":266,"correct":26},"考虑其数量配置对施工质量的影响与保证条件",{"key":34,"text":268,"correct":22},"加强对施工机械的维修、保养、管理。",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":111,"analysis":37},1276364,"影响质量控制的因素主要有( )等方面。",[273,275,277,279,281],{"key":20,"text":274,"correct":26},"环境",{"key":24,"text":276,"correct":26},"人",{"key":28,"text":278,"correct":26},"材料",{"key":31,"text":280,"correct":26},"方法",{"key":34,"text":282,"correct":22},"标准和规范",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":111,"analysis":37},1276365,"施工阶段进行质量控制的依据有( )。",[287,289,291,293,295],{"key":20,"text":288,"correct":26},"工程施工承包合同和相关合同",{"key":24,"text":290,"correct":26},"技术规范、规程和标准",{"key":28,"text":292,"correct":26},"设计文件",{"key":31,"text":294,"correct":26},"国家及政府有关部门颁布的有关质量管理方面的法律、法规性文件",{"key":34,"text":296,"correct":22},"国外先进规范标准",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":66,"analysis":37},1276366,"按工程施工过程的阶段划分,施工质量控制可分为( )。",[301,303,305,307,309],{"key":20,"text":302,"correct":26},"施工准备质量控制（事前控制）",{"key":24,"text":304,"correct":26},"施工阶段质量控制（事中控制）",{"key":28,"text":306,"correct":26},"竣工验收质量控制（事后控制）",{"key":31,"text":308,"correct":22},"施工作业过程的质量控制",{"key":34,"text":310,"correct":22},"中间产品质量控制",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":141,"analysis":37},1276367,"以下属于施工过程阶段质量控制的内容是( )。",[315,317,319,320,322],{"key":20,"text":316,"correct":26},"作业技术交底",{"key":24,"text":318,"correct":22},"施工组织设计（质量计划）的审查",{"key":28,"text":310,"correct":26},{"key":31,"text":321,"correct":26},"分部、分项工程质量验收",{"key":34,"text":323,"correct":26},"工程变更的审查",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":338,"analysis":37},1276368,"分项工程质量保证首先应建立健全( ),在认真组织进行施工图会审和技术交底的基础上,进一步强化对关键部位和影响工程全局的技术工作的复核。",[328,330,332,334,336],{"key":20,"text":329,"correct":22},"新规范",{"key":24,"text":331,"correct":26},"技术复核制度",{"key":28,"text":333,"correct":26},"技术交底制度",{"key":31,"text":335,"correct":22},"新制度",{"key":34,"text":337,"correct":22},"新设备","BC",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":96,"analysis":37},1276369,"( )需要坚持全过程的质量控制。",[343,345,347,349,351],{"key":20,"text":344,"correct":26},"执行质量三级检验制度",{"key":24,"text":346,"correct":26},"技术支持",{"key":28,"text":348,"correct":22},"施工人员培训",{"key":31,"text":350,"correct":26},"开展班前活动",{"key":34,"text":352,"correct":26},"质量技术交底",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":96,"analysis":37},1276370,"下列属于分项工程施工准备及资源配置计划的是( )。",[357,359,361,363,365],{"key":20,"text":358,"correct":26},"施工准备",{"key":24,"text":360,"correct":26},"施工物资准备",{"key":28,"text":362,"correct":22},"劳动组织准备",{"key":31,"text":364,"correct":26},"施工机具准备",{"key":34,"text":366,"correct":26},"质量计划编制方法",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":96,"analysis":37},1276371,"质量计划施工准备包括( )。",[371,373,375,377,379],{"key":20,"text":372,"correct":26},"施工技术准备",{"key":24,"text":374,"correct":26},"编制工程纠正预防措施",{"key":28,"text":376,"correct":22},"编制工程应急预案",{"key":31,"text":378,"correct":26},"编制工程质量控制预案",{"key":34,"text":380,"correct":26},"编制工程防护措施",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":395,"analysis":37},1276372,"项目经理部应根据( ),建立由项目经理领导,有项目工程师策划、组织实施,现场施工员、质量员、安全员和材料员等项目管理中层的中间控制,区域和专业责任工程师检查监督的管理系统,形成项目经理部、各专业承包商、专业化公司和施工作业队组成的质量管理网络。",[385,387,389,391,393],{"key":20,"text":386,"correct":26},"工程规划",{"key":24,"text":388,"correct":26},"项目特点",{"key":28,"text":390,"correct":26},"施工组织",{"key":31,"text":392,"correct":26},"工程总进度计划",{"key":34,"text":394,"correct":26},"已建立的项目质量目标","ABCDE",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":410,"analysis":37},1276373,"( )是实现质量目标的重要保障,项目班子以及各级管理人员建立起明确、严格的质量责任制,做到人人有责任是实现质量目标的前提。",[400,402,404,406,408],{"key":20,"text":401,"correct":22},"文化建设",{"key":24,"text":403,"correct":26},"组织建设",{"key":28,"text":405,"correct":22},"政治建设",{"key":31,"text":407,"correct":26},"制度建设",{"key":34,"text":409,"correct":22},"思想道德建设","BD",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":425,"analysis":37},1276374,"下列属于工程项目实现过程策划规定的是( )。",[415,417,419,421,423],{"key":20,"text":416,"correct":26},"规定施工组织设计或专项项目质量的编制要点及接口关系",{"key":24,"text":418,"correct":26},"规定重要施工过程的技术交底和质量策划要求",{"key":28,"text":420,"correct":26},"规定新技术、新材料、新结构、新设备的策划要求",{"key":31,"text":422,"correct":22},"规定项目经理部管理人员及操作工人的岗位任职标准及考核认定方法",{"key":34,"text":424,"correct":26},"规定重要过程验收的准则或技艺评定方法","ABCE",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":96,"analysis":37},1276375,"质量管理通常包括( )。",[430,432,434,436,438],{"key":20,"text":431,"correct":26},"质量策划",{"key":24,"text":433,"correct":26},"质量保证",{"key":28,"text":435,"correct":22},"质量检验",{"key":31,"text":437,"correct":26},"质量控制",{"key":34,"text":439,"correct":26},"质量改进",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":425,"analysis":37},1276376,"质量管理体系的优越性体现在( )。",[444,446,448,450,452],{"key":20,"text":445,"correct":26},"提高了内部管理的严肃性和有效性",{"key":24,"text":447,"correct":26},"有助于项目部加强现场监控、控制工程成本",{"key":28,"text":449,"correct":26},"提供有利的施工环境",{"key":31,"text":451,"correct":22},"有利于提高企业自身的技术水平和管理水平,增强企业的竞争力",{"key":34,"text":453,"correct":26},"为索赔工作提供最有力的支持",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":425,"analysis":37},1276377,"建筑工程质量管理中实施GB\u002FT19000-IS09000族标准的意义主要体现在( )。",[458,460,462,463,465],{"key":20,"text":459,"correct":26},"为建筑施工企业站稳国内、走向国际建筑市场奠定基础",{"key":24,"text":461,"correct":26},"有利于提高建筑产品的质量、降低成本",{"key":28,"text":451,"correct":26},{"key":31,"text":464,"correct":22},"有利于承接更多的项目",{"key":34,"text":466,"correct":26},"有利于保证用户的利益",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":96,"analysis":37},1276378,"一般建立实施质量管理体系包括( )。",[471,473,475,477,479],{"key":20,"text":472,"correct":26},"确定防止不合格产品并消除其产生原因的措施",{"key":24,"text":474,"correct":26},"建立和应用持续改进质量管理体系的过程",{"key":28,"text":476,"correct":22},"质量管理体建立在数据和信息分析的基础上,数据和信息分析是事实的高度提炼",{"key":31,"text":478,"correct":26},"实施测量确定过程的有效性",{"key":34,"text":480,"correct":26},"确定实现目标的过程和职责",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":66,"analysis":37},1276379,"不同企业应根据自己的特点,建立( )等方面的关联关系,并加以控制。",[485,487,489,491,493],{"key":20,"text":486,"correct":26},"资源管理",{"key":24,"text":488,"correct":26},"过程实现",{"key":28,"text":490,"correct":26},"测量分析改进",{"key":31,"text":492,"correct":22},"持续改进",{"key":34,"text":494,"correct":22},"基于数据的决策方法",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":111,"analysis":37},1276380,"质量管理的八项原则有( )。",[499,501,503,505,506],{"key":20,"text":500,"correct":26},"以顾客为关注焦点",{"key":24,"text":502,"correct":26},"领导作用",{"key":28,"text":504,"correct":26},"全员参与",{"key":31,"text":492,"correct":26},{"key":34,"text":494,"correct":22},{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":141,"analysis":37},1276381,"以下属于有关特性术语的是( )。",[511,513,515,517,519],{"key":20,"text":512,"correct":26},"特性",{"key":24,"text":514,"correct":22},"等级",{"key":28,"text":516,"correct":26},"质量特性",{"key":31,"text":518,"correct":26},"可信性",{"key":34,"text":520,"correct":26},"可追溯性",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":126,"analysis":37},1276382,"以下属于有关质量术语的是( )。",[525,527,528,530,532],{"key":20,"text":526,"correct":22},"质量管理体系",{"key":24,"text":514,"correct":26},{"key":28,"text":529,"correct":26},"质量要求",{"key":31,"text":531,"correct":26},"顾客满意",{"key":34,"text":533,"correct":26},"要求",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":126,"analysis":37},1276383,"建筑工程质量管理的特点有( )。",[538,540,542,544,546],{"key":20,"text":539,"correct":22},"影响质量的因素小",{"key":24,"text":541,"correct":26},"质量波动大",{"key":28,"text":543,"correct":26},"质量的隐蔽性",{"key":31,"text":545,"correct":26},"终检的局限性",{"key":34,"text":547,"correct":26},"评价方法的特殊性",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":111,"analysis":37},1276384,"广义的工程质量管理,泛指建设全过程的质量管理。其管理的范围贯穿于工程建设的( )全过程。",[552,554,556,558,560],{"key":20,"text":553,"correct":26},"决策",{"key":24,"text":555,"correct":26},"勘察",{"key":28,"text":557,"correct":26},"设计",{"key":31,"text":559,"correct":26},"施工",{"key":34,"text":561,"correct":22},"运行",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":111,"analysis":37},1276385,"当砌体工程质量不符合要求时,应按下列( )规定进行处理。",[566,568,570,572,574],{"key":20,"text":567,"correct":26},"经返工重做或更换器具、设备的检验批,应重新进行验收",{"key":24,"text":569,"correct":26},"经有资质的检测单位检测鉴定能够达到设计要求的检验批,应予以验收",{"key":28,"text":571,"correct":26},"经有资质的检测单位检测鉴定达不到设计要求,但经原设计单位核算认可能够满足结构安全和使用功能的验收批,可予以验收",{"key":31,"text":573,"correct":26},"经返修或加固处理的分项、分部工程,虽然改变外形尺寸仍能满足安全使用要求,按处理技术方案和协商文件进行二次验收",{"key":34,"text":575,"correct":22},"经返修或加固处理的分项、分部工程,虽然改变外形尺寸仍能满足安全使用要求,不予以验收",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":156,"analysis":37},1276386,"混凝土结构实体检验的内容应包括( )。",[580,582,584,586,588],{"key":20,"text":581,"correct":26},"混凝土强度",{"key":24,"text":583,"correct":26},"钢筋保护层厚度",{"key":28,"text":585,"correct":22},"密封防水处理部位",{"key":31,"text":587,"correct":22},"表面平整度",{"key":34,"text":589,"correct":26},"工程约定的项目",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":66,"analysis":37},1276387,"建设单位收到工程验收报告后,应由建设单位（项目）负责人组织( )等单位（项目）负责人进行单位（子单位）工程验收。",[594,595,596,598,600],{"key":20,"text":559,"correct":26},{"key":24,"text":557,"correct":26},{"key":28,"text":597,"correct":26},"监理",{"key":31,"text":599,"correct":22},"检测",{"key":34,"text":555,"correct":22},{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":111,"analysis":37},1276388,"分部（子分部）工程质量验收合格应符合( )规定。",[605,607,609,611,613],{"key":20,"text":606,"correct":26},"分部（子分部）工程所含分项工程的质量均应验收合格",{"key":24,"text":608,"correct":26},"质量控制资料应完整",{"key":28,"text":610,"correct":26},"地基与基础、主体结构和设备安装等分部工程有关安全及功能的检验和抽样检测结果应符合有关规定",{"key":31,"text":612,"correct":26},"观感质量验收应符合要求",{"key":34,"text":614,"correct":22},"主要功能项目的抽查结果应符合相关专业质量验收规范的规定",{"id":616,"libraryId":5,"type":15,"typeLabel":16,"stem":617,"options":618,"answer":410,"analysis":37},1276389,"检验批的质量应按( )验收。",[619,621,623,625,627],{"key":20,"text":620,"correct":22},"主要项目",{"key":24,"text":622,"correct":26},"主控项目",{"key":28,"text":624,"correct":22},"特殊项目",{"key":31,"text":626,"correct":26},"一般项目",{"key":34,"text":628,"correct":22},"合格项目",{"id":630,"libraryId":5,"type":15,"typeLabel":16,"stem":631,"options":632,"answer":111,"analysis":37},1276390,"建筑工程质量验收应划分为( )。",[633,635,637,639,641],{"key":20,"text":634,"correct":26},"单位（子单位）工程",{"key":24,"text":636,"correct":26},"分部（子分部）工程",{"key":28,"text":638,"correct":26},"分项工程",{"key":31,"text":640,"correct":26},"检验批",{"key":34,"text":642,"correct":22},"主体工程",{"id":644,"libraryId":5,"type":15,"typeLabel":16,"stem":645,"options":646,"answer":657,"analysis":37},1276391,"施工人员对涉及结构安全的试块、试件以及有关材料,应当在( )监督下现场取样,并送具有相应资质等级的质量检测单位进行检测。",[647,649,651,653,655],{"key":20,"text":648,"correct":22},"设计单位",{"key":24,"text":650,"correct":26},"建设单位",{"key":28,"text":652,"correct":22},"勘察单位",{"key":31,"text":654,"correct":22},"施工单位",{"key":34,"text":656,"correct":26},"监理单位","BE",{"id":659,"libraryId":5,"type":15,"typeLabel":16,"stem":660,"options":661,"answer":672,"analysis":37},1276392,"建筑工程采用的主要材料、半成品、成品、建筑构配件、器具和设备应进行现场验收,凡涉及安全、功能的有关产品,应按各专业工程质量验收规范规定进行复验,并应经( )检查认可。",[662,664,666,668,670],{"key":20,"text":663,"correct":26},"监理工程师",{"key":24,"text":665,"correct":26},"建设单位技术负责人",{"key":28,"text":667,"correct":22},"总监理工程师",{"key":31,"text":669,"correct":22},"施工单位技术负责人",{"key":34,"text":671,"correct":22},"项目经理","AB",{"id":674,"libraryId":5,"type":15,"typeLabel":16,"stem":675,"options":676,"answer":171,"analysis":37},1276393,"建设丁程承包单位在向建设单位提交工程竣工验收报告时,应当向建设单位出具质量保修书。质量保修书中应当明确建设工程的( )等。",[677,679,681,683,685],{"key":20,"text":678,"correct":26},"保修范围",{"key":24,"text":680,"correct":22},"保修经费",{"key":28,"text":682,"correct":26},"保修期限",{"key":31,"text":684,"correct":26},"保修责任",{"key":34,"text":686,"correct":22},"保修负责人",{"id":688,"libraryId":5,"type":689,"typeLabel":690,"stem":691,"options":692,"answer":694,"analysis":37},1276394,3,"判断题","钢结构工程设计图内容一般包括:设计说明、结构布置图、构件图、节点图和钢材订货表等。",[693,695],{"key":20,"text":694,"correct":26},"正确",{"key":24,"text":696,"correct":22},"错误",{"id":698,"libraryId":5,"type":689,"typeLabel":690,"stem":699,"options":700,"answer":694,"analysis":37},1276395,"在建筑钢结构工程设计中,通常将结构施工图的设计分为设计图设计和施工详图设计两个阶段。",[701,702],{"key":20,"text":694,"correct":26},{"key":24,"text":696,"correct":22},{"id":704,"libraryId":5,"type":689,"typeLabel":690,"stem":705,"options":706,"answer":696,"analysis":37},1276396,"凡基础截面形状、尺寸不同时,即基础宽度、墙体厚度、大放脚、基底标高及管沟做法不同,均标有不同编号的断面剖切符号,表示画有不同的基础平面图。",[707,708],{"key":20,"text":694,"correct":22},{"key":24,"text":696,"correct":26},[710,714,717,720,723,726],{"id":711,"name":712,"category":7,"favorite":713},1,"领导干部任职前廉政法规知识测试题",92,{"id":715,"name":716,"category":7,"favorite":711},595,"建筑结构与设备",{"id":718,"name":719,"category":7,"favorite":711},715,"招标采购专业知识与法律法规",{"id":721,"name":722,"category":7,"favorite":711},848,"市政方向-通用基础",{"id":724,"name":725,"category":7,"favorite":8},534,"BIM工程师",{"id":727,"name":725,"category":7,"favorite":8},535]