[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-865-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":607},{"id":5,"name":6,"category":7,"favorite":8},865,"土建方向-岗位技能","建筑工程",0,3,50,399,[13,34,46,58,70,82,94,106,118,130,141,153,165,177,189,201,213,225,237,249,261,273,285,297,309,320,332,343,354,365,377,389,399,411,423,432,444,456,468,480,492,504,516,528,540,549,561,571,583,595],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1276196,1,"单选题","Ⅰ类卵石、碎石的含泥量应( )。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","\u003C1.0%",false,{"key":24,"text":25,"correct":22},"B","\u003C0.7%",{"key":27,"text":28,"correct":29},"C","\u003C0.5%",true,{"key":31,"text":32,"correct":22},"D","\u003C0.25%","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1276197,"砂按( )分为粗、中、细三种规格。",[38,40,42,44],{"key":20,"text":39,"correct":22},"大小",{"key":24,"text":41,"correct":29},"细度模数",{"key":27,"text":43,"correct":22},"质量",{"key":31,"text":45,"correct":22},"产源",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1276198,"砂按其技术要求分为Ⅰ类、Ⅱ类、Ⅲ类,( )宜用于强度等级大于C60的混凝土。",[50,52,54,56],{"key":20,"text":51,"correct":29},"Ⅰ类",{"key":24,"text":53,"correct":22},"Ⅱ类",{"key":27,"text":55,"correct":22},"Ⅲ类",{"key":31,"text":57,"correct":22},"Ⅳ类",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1276199,"( )指的是岩石风化后经雨水冲刷或由岩石轧制而成的粒径为0.15～4.75mm的粒料。",[62,64,66,68],{"key":20,"text":63,"correct":29},"砂",{"key":24,"text":65,"correct":22},"碎石",{"key":27,"text":67,"correct":22},"石灰",{"key":31,"text":69,"correct":22},"水泥",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1276200,"水泥按同一生产厂家、同一等级、同一品种、同一批号且连续进场的水泥,袋装不超过( )t为一批,散装不超过500t为一批,每批抽样不少于一次。",[74,76,78,80],{"key":20,"text":75,"correct":22},"50",{"key":24,"text":77,"correct":22},"100",{"key":27,"text":79,"correct":22},"150",{"key":31,"text":81,"correct":29},"200",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1276201,"水泥在使用中,对其质量有怀疑或水泥出厂超过( )个月（快硬硅酸盐水泥超过一个月）时,应进行复验,并按复验结果使用。",[86,88,90,92],{"key":20,"text":87,"correct":22},"1",{"key":24,"text":89,"correct":22},"2",{"key":27,"text":91,"correct":29},"3",{"key":31,"text":93,"correct":22},"4",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1276202,"水泥的( )是指水泥在凝结硬化过程中,体积变化的均匀性。",[98,100,102,104],{"key":20,"text":99,"correct":22},"强度",{"key":24,"text":101,"correct":29},"体积安定性",{"key":27,"text":103,"correct":22},"稳定性",{"key":31,"text":105,"correct":22},"抗渗性",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1276203,"终凝时间是从水泥加水拌合起至( )所需的时间。",[110,112,114,116],{"key":20,"text":111,"correct":22},"水泥浆开始失去可塑性",{"key":24,"text":113,"correct":22},"水泥浆完全失去可塑性",{"key":27,"text":115,"correct":29},"水泥浆完全失去可塑性并开始产生强度",{"key":31,"text":117,"correct":22},"开始产生强度",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1276204,"普通硅酸盐水泥代号为( )。",[122,124,126,128],{"key":20,"text":123,"correct":29},"P.O",{"key":24,"text":125,"correct":22},"P.I",{"key":27,"text":127,"correct":22},"P.P",{"key":31,"text":129,"correct":22},"P.F",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},1276205,"我国建筑工程中常用的是通用硅酸盐水泥,它是以( )和适量的石膏及规定的混合材料制成的水硬性胶凝材料。",[134,136,138,140],{"key":20,"text":135,"correct":22},"硅酸钙",{"key":24,"text":137,"correct":22},"碳酸钙",{"key":27,"text":139,"correct":29},"硅酸盐水泥熟料",{"key":31,"text":67,"correct":22},{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":20,"analysis":33},1276206,"当梁、板跨度大于或等于( )时,梁、板应按设计起拱;当设计无具体要求时,起拱高度宜为跨度的1‰～3‰。",[145,147,149,151],{"key":20,"text":146,"correct":29},"4m",{"key":24,"text":148,"correct":22},"2.5m",{"key":27,"text":150,"correct":22},"5m",{"key":31,"text":152,"correct":22},"3m",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":31,"analysis":33},1276207,"下列不属于钢筋安装工程质量控制点的是( )。",[157,159,161,163],{"key":20,"text":158,"correct":22},"钢筋安装的位置",{"key":24,"text":160,"correct":22},"钢筋保护层的厚度",{"key":27,"text":162,"correct":22},"钢筋绑扎的质量",{"key":31,"text":164,"correct":29},"接头位置的设置",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":24,"analysis":33},1276208,"当采用冷拉方法调直钢筋时,HPB235级钢筋的冷拉率不宜大于( ),HRB33级、HRB400级和RRB400级钢筋的冷拉率不宜大于( )。",[169,171,173,175],{"key":20,"text":170,"correct":22},"3%,1%",{"key":24,"text":172,"correct":29},"4%,1%",{"key":27,"text":174,"correct":22},"5%,2%",{"key":31,"text":176,"correct":22},"2%,1%",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":20,"analysis":33},1276209,"铺贴卷材严禁在雨天、雪天施工;五级风及以上时不得施工;冷粘法施工,气温不宜低于( ),热熔法施工气温不宜低于( )。",[181,183,185,187],{"key":20,"text":182,"correct":29},"5℃,-10℃",{"key":24,"text":184,"correct":22},"5℃,0℃",{"key":27,"text":186,"correct":22},"5℃,-5℃",{"key":31,"text":188,"correct":22},"0℃,-10℃",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":31,"analysis":33},1276210,"以下不是钻孔灌注桩孔壁坍塌控制的原因是( )。",[193,195,197,199],{"key":20,"text":194,"correct":22},"复杂的不良地质情况",{"key":24,"text":196,"correct":22},"泥浆黏度不够、护壁效果不佳",{"key":27,"text":198,"correct":22},"下钢筋笼及升降机具时碰撞孑L壁",{"key":31,"text":200,"correct":29},"钻头振动过大",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":27,"analysis":33},1276211,"钻孔桩钢筋笼宜分段制作,连接时,按照( )的钢筋接头错开焊接,对钢筋笼立焊的质量要特别加强检查控制,确保钢筋接头质量。",[205,207,209,211],{"key":20,"text":206,"correct":22},"25%",{"key":24,"text":208,"correct":22},"100%",{"key":27,"text":210,"correct":29},"50%",{"key":31,"text":212,"correct":22},"75%",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":24,"analysis":33},1276212,"下列关于灰土、砂及砂石地基的质量控制措施表述错误的是( )。",[217,219,221,223],{"key":20,"text":218,"correct":22},"灰土及砂石地基施工前,应按规定对原材料进行进场取样检验,土料、石灰、砂、石等原材料质量、配合比应符合设计要求",{"key":24,"text":220,"correct":29},"灰土配合比应符合设计规定,一般采用石灰与土的体积比2:7或3:8",{"key":27,"text":222,"correct":22},"灰土或砂石各层摊铺后用木耙子或拉线找平,并按对应标高控制桩进行厚度检查",{"key":31,"text":224,"correct":22},"冬期施工时,砂石材料中不得夹有冰块,并应采取措施防止砂石内水分冻结",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":24,"analysis":33},1276213,"水泥土搅拌桩施工结束后,应检查桩体强度,对承重水泥土搅拌桩应取90d后的试样;对支护水泥土搅拌桩应取( )后的试样。",[229,231,233,235],{"key":20,"text":230,"correct":22},"90d",{"key":24,"text":232,"correct":29},"28d",{"key":27,"text":234,"correct":22},"30d",{"key":31,"text":236,"correct":22},"14d",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":31,"analysis":33},1276214,"以下不是水泥土搅拌桩地基的施工质量控制点的是( )。",[241,243,245,247],{"key":20,"text":242,"correct":22},"水泥及外加剂质量",{"key":24,"text":244,"correct":22},"水泥用量",{"key":27,"text":246,"correct":22},"桩体强度",{"key":31,"text":248,"correct":29},"顶面平整度",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":24,"analysis":33},1276215,"下列关于土方开挖过程中的质量控制措施表述错误的是( )。",[253,255,257,259],{"key":20,"text":254,"correct":22},"土方开挖时,要注意保护标准定位桩、轴线桩、标准工程桩",{"key":24,"text":256,"correct":29},"如果采用机械开挖,不需要配合人工清土,由机械直接运走,节省时间",{"key":27,"text":258,"correct":22},"基坑（槽）挖深要注意减少对基土的扰动",{"key":31,"text":260,"correct":22},"雨期、冬期施工的注意事项",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":24,"analysis":33},1276216,"下列属于土方回填工程的施工质量控制点的是( )。",[265,267,269,271],{"key":20,"text":266,"correct":22},"回填深度",{"key":24,"text":268,"correct":29},"压实度",{"key":27,"text":270,"correct":22},"基底土质",{"key":31,"text":272,"correct":22},"基坑尺寸",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":31,"analysis":33},1276217,"回填管沟应通过人工作业方式先将管子周围的填土回填夯实,并应从管道两边同时进行,直到管顶( )以上,方可用机械填土回填夯实。",[277,279,281,283],{"key":20,"text":278,"correct":22},"0.2m",{"key":24,"text":280,"correct":22},"0.3m",{"key":27,"text":282,"correct":22},"0.4m",{"key":31,"text":284,"correct":29},"0.5rn",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":31,"analysis":33},1276218,"如果采用机械开挖,要配合一定程度的人工清土,机械开挖到接近槽底时,用水准仪控制标高,预留( )Cm土层进行人工开挖,以防止超挖。",[289,291,293,295],{"key":20,"text":290,"correct":22},"10～20",{"key":24,"text":292,"correct":22},"30～40",{"key":27,"text":294,"correct":22},"10～30",{"key":31,"text":296,"correct":29},"20～30",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":20,"analysis":33},1276219,"施工单位在对进场材料、试块、试件、钢筋接头等实施见证取样是指在( )现场监督下,承包单位按相关规范的要求,完成材料、试块、试件等的取样过程。",[301,303,305,307],{"key":20,"text":302,"correct":29},"监理工程师",{"key":24,"text":304,"correct":22},"设计人员",{"key":27,"text":306,"correct":22},"项目经理",{"key":31,"text":308,"correct":22},"检测机构",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":20,"analysis":33},1276220,"见证取样的频率,国家或地方主管部门有规定的,执行相关规定;施工承包合同中如有明确规定的,执行施工承包合同的规定。见证取样的频率和数量,包括在承包单位自检范围内,一般所占比例为( )。",[313,315,316,318],{"key":20,"text":314,"correct":29},"30%",{"key":24,"text":210,"correct":22},{"key":27,"text":317,"correct":22},"10%",{"key":31,"text":319,"correct":22},"20%",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":24,"analysis":33},1276221,"贮存期超过( )的过期水泥或受潮、结块的水泥,重新检定其强度等级,并且不允许用于重要工程中。",[324,326,328,330],{"key":20,"text":325,"correct":22},"一年",{"key":24,"text":327,"correct":29},"三个月",{"key":27,"text":329,"correct":22},"半年",{"key":31,"text":331,"correct":22},"两年",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":24,"analysis":33},1276222,"凡运到施工现场的原材料、半成品或构配件,进场前应由施工承包单位按规定要求进行检验的检验或试验报告,经( )审查并确认其质量合格后,方准进场。凡是没有产品出厂合格证明及检验不合格者,不得进场。",[336,338,339,341],{"key":20,"text":337,"correct":22},"项目承包负责人",{"key":24,"text":302,"correct":29},{"key":27,"text":340,"correct":22},"项目技术负责人",{"key":31,"text":342,"correct":22},"总监理工程师",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":27,"analysis":33},1276224,"施工承包单位做好技术交底,是取得好的施工质量的条件之一。为做好技术交底,项目经理部必须由( )编制技术交底书,并经项目总工程师批准。",[347,349,350,352],{"key":20,"text":348,"correct":22},"质量检查员",{"key":24,"text":306,"correct":22},{"key":27,"text":351,"correct":29},"主管技术人员",{"key":31,"text":353,"correct":22},"施工员",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":27,"analysis":33},1276225,"对于关键部位或技术难度大、施工复杂的检验批,在分项工程施工前,承包单位的技术交底书（作业指导书）要报( )审批。",[358,360,362,363],{"key":20,"text":359,"correct":22},"公司技术负责人",{"key":24,"text":361,"correct":22},"项目总工",{"key":27,"text":302,"correct":29},{"key":31,"text":364,"correct":22},"建设单位",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":27,"analysis":33},1276226,"( )是指为了保证作业过程质量而确定的重点控制对象、关键部位或薄弱环节。",[369,371,373,375],{"key":20,"text":370,"correct":22},"安全检查点",{"key":24,"text":372,"correct":22},"施工节点",{"key":27,"text":374,"correct":29},"质量控制点",{"key":31,"text":376,"correct":22},"隐蔽验收点",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":27,"analysis":33},1276227,"( )应对建设单位（或其委托的单位）给定的原始基准点、基准线和标高等测量控制点进行复核,并将复测结果报监理工程师审核,经批准后施工承包单位才能据此进行准确的测量放线。",[381,383,385,387],{"key":20,"text":382,"correct":22},"监理单位",{"key":24,"text":384,"correct":22},"设计单位",{"key":27,"text":386,"correct":29},"施工承包单位",{"key":31,"text":388,"correct":22},"分包单位",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":24,"analysis":33},1276228,"为了保证工程能够顺利地施工,( )督促分包单位按照合同事先划定的范围,占有和使用现场有关部分。",[393,395,396,397],{"key":20,"text":394,"correct":22},"技术员",{"key":24,"text":348,"correct":29},{"key":27,"text":306,"correct":22},{"key":31,"text":398,"correct":22},"监理",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":27,"analysis":33},1276229,"下列不属于审查施工组织设计原则的是( )。",[403,405,407,409],{"key":20,"text":404,"correct":22},"质量管理和技术管理体系、质量保证措施是否健全且切实可行",{"key":24,"text":406,"correct":22},"施工组织设计编制、审查和批准应符合规定的程序",{"key":27,"text":408,"correct":29},"施工组织设计应符合施工合同要求",{"key":31,"text":410,"correct":22},"在满足合同和法规要求的前提下,对施工组织设计的审查,应尊重承包单位的自主技术决策和管理决策",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":27,"analysis":33},1276230,"( )主要是针对每一个单位工程（或单项工程、工程项目）,编制专门规定的质量措施、资源和活动顺序等的文件。",[415,417,419,421],{"key":20,"text":416,"correct":22},"专项施工方案",{"key":24,"text":418,"correct":22},"施工方案",{"key":27,"text":420,"correct":29},"施工组织设计",{"key":31,"text":422,"correct":22},"进度计划",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":27,"analysis":33},1276231,"( )应参加施工单位内部的图纸审查工作,要认真做好审查及图纸核对工作,对于审图过程中发现的问题,及时汇报项目技术负责人并以书面形式报告给建设单位。",[427,429,430,431],{"key":20,"text":428,"correct":22},"工长",{"key":24,"text":306,"correct":22},{"key":27,"text":348,"correct":29},{"key":31,"text":394,"correct":22},{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":20,"analysis":33},1276232,"施工阶段,( )是建立工作的依据。",[436,438,440,442],{"key":20,"text":437,"correct":29},"设计文件",{"key":24,"text":439,"correct":22},"质量计划",{"key":27,"text":441,"correct":22},"质量目标",{"key":31,"text":443,"correct":22},"质量评定记录资料",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":31,"analysis":33},1276233,"以下不是质量检查员参加设计技术交底会应了解的基本内容的是( )。",[448,450,452,454],{"key":20,"text":449,"correct":22},"对主要建筑材料、构配件和设备的要求,所采用的新技术、新工艺、新材料、新设备的要求,以及施工中应特别注意的事项等",{"key":24,"text":451,"correct":22},"对建设单位、承包单位和监理单位提出的对施工图的意见和建议的答复",{"key":27,"text":453,"correct":22},"设计主导思想、建筑艺术构思和要求、采用的设计规范、确定的抗震等级、防火等级,基础、结构、内外装修及机电设备设计（设备造型）等",{"key":31,"text":455,"correct":29},"在设计交底会上确认的设计变更上会签",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":20,"analysis":33},1276234,"施工人员应当树立五大观念,下列不属于五大观念的是( )。",[460,462,464,466],{"key":20,"text":461,"correct":29},"注重环境保护的观念",{"key":24,"text":463,"correct":22},"社会效益、企业效益（质量、成本、工期相结合）综合效益观念",{"key":27,"text":465,"correct":22},"质量第一的观念",{"key":31,"text":467,"correct":22},"预控为主的观念",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":31,"analysis":33},1276235,"下列不属于材料控制要点的是( )。",[472,474,476,478],{"key":20,"text":473,"correct":22},"加强材料的检查验收,严把质量关",{"key":24,"text":475,"correct":22},"抓好材料的现场管理,并做好合理使用",{"key":27,"text":477,"correct":22},"严格按规范、标准的要求组织材料的检验,材料的取样、实验操作均应符合规范要求",{"key":31,"text":479,"correct":29},"加强材料的质量控制,是提高工程质量的重要保证",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":24,"analysis":33},1276236,"工程质量的形成受到所有参加工程项目施工的工程技术干部、操作人员、服务人员共同作用,他们是形成工程质量中( )的因素。",[484,486,488,490],{"key":20,"text":485,"correct":22},"环境",{"key":24,"text":487,"correct":29},"人",{"key":27,"text":489,"correct":22},"材料",{"key":31,"text":491,"correct":22},"方法",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":27,"analysis":33},1276237,"( )的质量决定了分项工程的质量。",[496,498,500,502],{"key":20,"text":497,"correct":22},"单项工程",{"key":24,"text":499,"correct":22},"单位工程",{"key":27,"text":501,"correct":29},"检验批",{"key":31,"text":503,"correct":22},"分部工程",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":31,"analysis":33},1276238,"( )是最基本的控制,它决定了有关检验批的质量。",[508,510,512,514],{"key":20,"text":509,"correct":22},"施工准备质量控制",{"key":24,"text":511,"correct":22},"施工阶段质量控制",{"key":27,"text":513,"correct":22},"竣工验收质量控制",{"key":31,"text":515,"correct":29},"施工作业过程的质量控制",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":31,"analysis":33},1276239,"以下哪项内容不是施工准备阶段质量控制的内容( )。",[520,522,524,526],{"key":20,"text":521,"correct":22},"设计交底和图纸会审",{"key":24,"text":523,"correct":22},"（质量计划）的审查",{"key":27,"text":525,"correct":22},"施工组织设计生产要素配置质量审查",{"key":31,"text":527,"correct":29},"隐蔽工程质量控制",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":24,"analysis":33},1276240,"在( )阶段的质量控制,施工单位要严格按照审批的施工组织设计进行施工;对技术要求高,施工难度大的,或采用新工艺、新材料、新技术的工序和部位,须设置质量控制点。",[532,534,536,538],{"key":20,"text":533,"correct":22},"施工准备",{"key":24,"text":535,"correct":29},"施工",{"key":27,"text":537,"correct":22},"竣工验收",{"key":31,"text":539,"correct":22},"使用",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":24,"analysis":33},1276241,"在工程开工前,总监理工程师应组织专业监理工程师审查承包单位报送的施工组织设计（方案）报审表,提出意见,并经总监理工程师审核、签认后报( )。",[544,545,546,548],{"key":20,"text":382,"correct":22},{"key":24,"text":364,"correct":29},{"key":27,"text":547,"correct":22},"施工单位",{"key":31,"text":384,"correct":22},{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":20,"analysis":33},1276242,"施工单位的项目施工质量计划或施工组织设计文件编成后,应按照工程施工管理程序进行审批,包括( )的审批和项目监理机构的审查。",[553,555,557,559],{"key":20,"text":554,"correct":29},"施工企业内部",{"key":24,"text":556,"correct":22},"施工企业外部",{"key":27,"text":558,"correct":22},"发包人",{"key":31,"text":560,"correct":22},"项目部",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":31,"analysis":33},1276243,"施工单位应按设计文件和规范要求的内容编制施工组织设计,并报送( )审查签认。",[565,566,568,570],{"key":20,"text":306,"correct":22},{"key":24,"text":567,"correct":22},"建设单位负责人",{"key":27,"text":569,"correct":22},"勘察单位负责人",{"key":31,"text":302,"correct":29},{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":20,"analysis":33},1276244,"施工材料的质量保证,保证用于施工的材料质量符合标准,并将产品合格证、( )收集整理。",[575,577,579,581],{"key":20,"text":576,"correct":29},"产品检测报告",{"key":24,"text":578,"correct":22},"产品消耗量",{"key":27,"text":580,"correct":22},"产品规格型号",{"key":31,"text":582,"correct":22},"进场复验报告",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":31,"analysis":33},1276245,"下列不属于钢筋连接工程质量控制要点的是( )。",[587,589,591,593],{"key":20,"text":588,"correct":22},"钢筋连接操作前要逐级进行安全技术交底,并履行签字手续",{"key":24,"text":590,"correct":22},"钢筋机械连接和焊接的操作人员必须持证上岗",{"key":27,"text":592,"correct":22},"钢筋连接所用的焊（条）剂、套筒等材料必须符合技术检验认定的技术要求,并具有相应的出厂合格证",{"key":31,"text":594,"correct":29},"若发现钢筋脆断、焊接性能不良或力学性能显著不正常等现象时,应立即停止使用",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":31,"analysis":33},1276246,"绑扎搭接接头钢筋的横向净距不应小于钢筋直径,且不应小于( )。",[599,601,603,605],{"key":20,"text":600,"correct":22},"18mm",{"key":24,"text":602,"correct":22},"20mm",{"key":27,"text":604,"correct":22},"22mm",{"key":31,"text":606,"correct":29},"25mm",[608,611,614,617,620,623],{"id":15,"name":609,"category":7,"favorite":610},"领导干部任职前廉政法规知识测试题",92,{"id":612,"name":613,"category":7,"favorite":15},595,"建筑结构与设备",{"id":615,"name":616,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":618,"name":619,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":621,"name":622,"category":7,"favorite":8},534,"BIM工程师",{"id":624,"name":622,"category":7,"favorite":8},535]