[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1276483":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1276483,865,3,"判断题","工程项目建成后,不可能像某些工业产品那样,再拆卸或解体检查内在的质量,或重新更换零件;即使发现质量有问题,也不可能像T业产品那样实行“包换”或“退款”。而工程项目的终检无法进行工程内在质量的检验,发现隐蔽的质量缺陷。这是指建设工程质量管理中质量隐蔽性的特点。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"",{"id":6,"name":21,"category":22,"favorite":23},"土建方向-岗位技能","建筑工程",0]