[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1276432":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1276432,865,3,"判断题","《建筑地基基础工程施工质量验收规范》GB50202-2002中,土方开挖的顺序、方法必须与设计工况相一致,并遵“开槽支撑,先撑后挖,分层开挖,严禁超挖”的原则。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"",{"id":6,"name":21,"category":22,"favorite":23},"土建方向-岗位技能","建筑工程",0]