[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1276370":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1276370,865,2,"多选题","下列属于分项工程施工准备及资源配置计划的是( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","施工准备",true,{"key":16,"text":17,"correct":14},"B","施工物资准备",{"key":19,"text":20,"correct":21},"C","劳动组织准备",false,{"key":23,"text":24,"correct":14},"D","施工机具准备",{"key":26,"text":27,"correct":14},"E","质量计划编制方法","ABDE","",{"id":6,"name":31,"category":32,"favorite":33},"土建方向-岗位技能","建筑工程",0]