[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1276318":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1276318,865,2,"多选题","建设单位在收到工程验收报告后,应由建设单位负责人组织( )等单位（项目）负责人进行单位（子单位）工程验收。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","设计单位",true,{"key":16,"text":17,"correct":14},"B","施工单位",{"key":19,"text":20,"correct":14},"C","监理单位",{"key":22,"text":23,"correct":24},"D","工程质量监督站",false,{"key":26,"text":27,"correct":24},"E","建筑管理处（站）","ABC","",{"id":6,"name":31,"category":32,"favorite":33},"土建方向-岗位技能","建筑工程",0]