[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1276317":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},1276317,865,2,"多选题","桩基工程检验批质量验收要求为( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","主控项目必须全部符合要求B一主控项目应有80%合格",true,{"key":16,"text":17,"correct":18},"B","一般项目全部符合要求",false,{"key":20,"text":21,"correct":18},"C","一般项目应有80%合格",{"key":23,"text":24,"correct":14},"D","一般项目应有90%合格","AD","",{"id":6,"name":28,"category":29,"favorite":30},"土建方向-岗位技能","建筑工程",0]