[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1276300":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1276300,865,2,"多选题","分部（子分部）工程质量竣工验收的单位有( )。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","分包单位",true,{"key":16,"text":17,"correct":14},"B","勘察单位",{"key":19,"text":20,"correct":14},"C","施工单位",{"key":22,"text":23,"correct":14},"D","设计单位",{"key":25,"text":26,"correct":27},"E","监理单位",false,"ABCD","",{"id":6,"name":31,"category":32,"favorite":33},"土建方向-岗位技能","建筑工程",0]