[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1276274":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1276274,865,1,"单选题","屋面工程验收的文件和记录体现了施工全过程控制,必须做到真实、准确,不得有涂改和伪造,( )签字后方可有效。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目经理",false,{"key":16,"text":17,"correct":18},"B","各级技术负责人",true,{"key":20,"text":21,"correct":14},"C","总监理工程师",{"key":23,"text":24,"correct":14},"D","质量员","",{"id":6,"name":27,"category":28,"favorite":29},"土建方向-岗位技能","建筑工程",0]