[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1276250":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1276250,865,1,"单选题","下列不属于质量技术管理措施的是( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","对于材料的采购、贮存、标识等作出明确的规定,保证不合格材料不得用于工程",false,{"key":16,"text":17,"correct":14},"B","施工技术资料管理目标及措施",{"key":19,"text":20,"correct":14},"C","工程施工难点、重点所采取的技术措施、质量保证措施等",{"key":22,"text":23,"correct":24},"D","对下列达到一定规模的危险性较大的分部分项工程编制专项安全施工方案,并附安全验算结果",true,"",{"id":6,"name":27,"category":28,"favorite":29},"土建方向-岗位技能","建筑工程",0]