[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1276238":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1276238,865,1,"单选题","( )是最基本的控制,它决定了有关检验批的质量。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","施工准备质量控制",false,{"key":16,"text":17,"correct":14},"B","施工阶段质量控制",{"key":19,"text":20,"correct":14},"C","竣工验收质量控制",{"key":22,"text":23,"correct":24},"D","施工作业过程的质量控制",true,"",{"id":6,"name":27,"category":28,"favorite":29},"土建方向-岗位技能","建筑工程",0]