[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1276222":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1276222,865,1,"单选题","凡运到施工现场的原材料、半成品或构配件,进场前应由施工承包单位按规定要求进行检验的检验或试验报告,经( )审查并确认其质量合格后,方准进场。凡是没有产品出厂合格证明及检验不合格者,不得进场。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目承包负责人",false,{"key":16,"text":17,"correct":18},"B","监理工程师",true,{"key":20,"text":21,"correct":14},"C","项目技术负责人",{"key":23,"text":24,"correct":14},"D","总监理工程师","",{"id":6,"name":27,"category":28,"favorite":29},"土建方向-岗位技能","建筑工程",0]