[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1276179":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1276179,865,1,"单选题","《建筑桩基技术规范》JGJ94-2008中,压桩过程中当桩身垂直度偏差大于( )时,应找出原因并设法纠正。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","2%",false,{"key":16,"text":17,"correct":14},"B","3%",{"key":19,"text":20,"correct":21},"C","1%",true,{"key":23,"text":24,"correct":14},"D","4%","",{"id":6,"name":27,"category":28,"favorite":29},"土建方向-岗位技能","建筑工程",0]