[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-864-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":615},{"id":5,"name":6,"category":7,"favorite":8},864,"市政方向-通用基础","建筑工程",0,5,50,378,[13,38,53,67,82,97,111,126,141,155,170,185,200,215,230,244,258,273,286,301,315,330,344,358,373,387,402,417,432,446,460,474,487,501,515,525,531,537,543,549,555,561,567,573,579,585,591,597,603,609],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1275917,2,"多选题","下列关于沟槽开挖施工要点的说法中,错误的是( )。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","当管径小、土方量少、施工现场狭窄、地下障碍物多或无法采用机械挖土时采用人工开挖",true,{"key":24,"text":25,"correct":22},"B","相邻沟槽开挖时,应遵循先深后浅的施工顺序",{"key":27,"text":28,"correct":29},"C","采用机械挖土时,应使槽底留50cm左右厚度土层,由人工清槽底",false,{"key":31,"text":32,"correct":29},"D","已有地下管线与沟槽交叉或邻近建筑物、电杆、测量标志时,应采取避开措施",{"key":34,"text":35,"correct":22},"E","穿越道路时,架设施工临时便桥,设置明显标志,做好交通导行措施","ABE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1275918,"板式橡胶支座包括( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"滑板式支座",{"key":24,"text":45,"correct":29},"螺旋锚固板式橡胶支座",{"key":27,"text":47,"correct":22},"四氟板支座",{"key":31,"text":49,"correct":22},"坡型板式橡胶支座",{"key":34,"text":51,"correct":29},"球形板支座","ACD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":36,"analysis":37},1275919,"下列各项中,桥梁下部结构施工说法正确的是( )。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"石砌墩台应分段分层砌筑,两相邻工作段的砌筑高差不超过1.2m",{"key":24,"text":60,"correct":22},"石砌墩台上层石块应在下层石块上铺满砂浆后砌筑",{"key":27,"text":62,"correct":29},"钢筋混凝土墩台混凝土宜水平分层浇筑,逐层振捣密实,控制混凝土下落高度,防止混凝土拌合料离析",{"key":31,"text":64,"correct":29},"大体积墩台混凝土应合理分块进行浇筑,每块面积不宜小于100平方米,高度不宜超过5m",{"key":34,"text":66,"correct":22},"墩台帽（盖梁）支架一般采用满堂式扣件钢管支架",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},1275920,"下列关于砂石铺筑垫层施工说法错误的是( )。",[71,73,75,77,79],{"key":20,"text":72,"correct":22},"砂石铺筑分层、分段进行,每层厚度,一般为15—20cm,最大不超过50cm",{"key":24,"text":74,"correct":29},"分段施工时,接搓处应做成斜坡,每层接搓处的水平距离应错开0.5—1.0M,并应充分压（夯）实",{"key":27,"text":76,"correct":22},"采用压路机往复碾压,一般碾压不少于2遍,其轮距搭接不少于50cm",{"key":31,"text":78,"correct":29},"边缘和转角处应用人工或蛙式打夯机补夯密实",{"key":34,"text":80,"correct":29},"石灰稳定粒料类垫层与水泥稳定粒料类垫层都适用于城市道路温度和湿度状况不良的环境下","AC",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1275921,"路堑土质路基开挖中纵挖法分为( )。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"分层纵挖法",{"key":24,"text":89,"correct":22},"通道纵挖法",{"key":27,"text":91,"correct":22},"混合式开挖法",{"key":31,"text":93,"correct":22},"分段纵挖法",{"key":34,"text":95,"correct":29},"整体纵挖法","ABCD",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":52,"analysis":37},1275922,"下列关于土钉支护基坑施工的说法中,表述正确的是( )。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"一般采用施工机械,根据分层厚度和作业顺序开挖,一般每层开挖深度控制在100～150cm",{"key":24,"text":104,"correct":29},"土钉全长设施金属或塑料定位支架,间距5m,保证钢筋处于钻孔的中心部位",{"key":27,"text":106,"correct":22},"喷射混凝土粗骨料最大粒径不宜大于12mm,水胶比不宜大于0.45,并掺加速凝剂",{"key":31,"text":108,"correct":22},"喷射混凝土终凝后2h,应根据当地条件采取连续喷水养护5—7d或喷涂养护剂",{"key":34,"text":110,"correct":29},"冬期进行喷射混凝土,作业温度不得低于0℃,混合料进入喷射机的温度和水温不得低于0℃;在结冰的面层上不得喷射混凝土",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":125,"analysis":37},1275923,"下列关于说法中,表述正确的是( )。",[115,117,119,121,123],{"key":20,"text":116,"correct":29},"挖土机沿挖方边缘移动时,机械距离边坡上缘的宽度不得小于沟槽或管沟的深度",{"key":24,"text":118,"correct":22},"深度大于1.5m时,根据土质变化情况,应做好沟槽的支撑准备,以防塌陷",{"key":27,"text":120,"correct":22},"在开挖槽边弃土时,应保证边坡和直立帮的稳定",{"key":31,"text":122,"correct":22},"暴露的溶洞,应用浆砌片石或混凝土填满堵满",{"key":34,"text":124,"correct":22},"淤泥、淤泥质土和垃圾土按要求进行挖除,清理干净,回填砂砾材料或碎石,分层整平夯实到基底标高","BCDE",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},1275924,"下列关于深层搅拌法的说法中,表述正确的是( )。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"固化剂宜选用强度等级为42.5级及以上的水泥",{"key":24,"text":133,"correct":22},"单、双轴深层搅拌桩水泥掺量可取13%一15%",{"key":27,"text":135,"correct":29},"三轴深层搅拌桩水泥掺量可取18度—20度。",{"key":31,"text":137,"correct":22},"水泥浆水胶比应保证施工时的可喷性,宜取0.45~0.70",{"key":34,"text":139,"correct":29},"施工流程为:搅拌机械就位一预搅下沉一搅拌提升一关闭搅拌机械","ABD",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":140,"analysis":37},1275925,"下列换填法施工要点正确的是( )。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"不得直接使用泥炭、淤泥、淤泥质土和有机质土进行换填",{"key":24,"text":148,"correct":22},"分段施工时,不得在基础、墙角下接缝",{"key":27,"text":150,"correct":29},"高炉干渣垫层大面积施工宜采用平碾、振动碾或羊足碾分层碾压,每层松铺厚度宜不大于350mm",{"key":31,"text":152,"correct":22},"压实度一般采用环刀法、灌砂法等方法检验",{"key":34,"text":154,"correct":29},"对砂石、高炉干渣等的压实度试验一般采用环刀法、灌砂法",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":169,"analysis":37},1275926,"下列堆载预压法施工要点说法正确的是( )。",[159,161,163,165,167],{"key":20,"text":160,"correct":29},"袋装砂井和塑料排水带施工所用钢管内径略小于两者尺寸",{"key":24,"text":162,"correct":29},"砂袋或塑料排水带应高出砂垫层不少于80mm",{"key":27,"text":164,"correct":29},"预压区中心部位的砂垫层底标高应低于周边的砂垫层底标高,以利于排水",{"key":31,"text":166,"correct":22},"堆载预压施工,应根据设计要求分级逐渐加载",{"key":34,"text":168,"correct":22},"竖向变形量每天不宜超过10—15mm,水平位移连每天不宜超过4—7mm","DE",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":184,"analysis":37},1275927,"下列关于桥梁侧剖面图的绘制步骤与方法的说法中,正确的是( )。",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"侧剖面图是由两个不同位置剖面组合构成的图样,反映桥台及桥墩两个不同剖面位置",{"key":24,"text":177,"correct":29},"用中实线绘制未上主梁及桥台未回填土情况下的桥台、盖梁平面图,并标注相关尺寸",{"key":27,"text":179,"correct":29},"左半部分图样反映桥墩位置横剖面,右半部分反映桥台位置横剖面",{"key":31,"text":181,"correct":22},"左半部分图示出桥台立面图样、尺寸构造等",{"key":34,"text":183,"correct":22},"右半部分图示出桥墩及桩柱立面图样、尺寸构造","ADE",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":199,"analysis":37},1275928,"市政管道工程施工图包括( )。",[189,191,193,195,197],{"key":20,"text":190,"correct":22},"平面图",{"key":24,"text":192,"correct":29},"基础图",{"key":27,"text":194,"correct":22},"横断面图",{"key":31,"text":196,"correct":22},"关键节点大样图",{"key":34,"text":198,"correct":22},"井室结构图","ACDE",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":214,"analysis":37},1275929,"钢筋末端的标准弯钩可设置成( )。",[204,206,208,210,212],{"key":20,"text":205,"correct":29},"45度",{"key":24,"text":207,"correct":29},"60度",{"key":27,"text":209,"correct":22},"90度",{"key":31,"text":211,"correct":22},"135度",{"key":34,"text":213,"correct":22},"180度","CDE",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":229,"analysis":37},1275931,"下列关于道路纵断面图的说法中错误的是( )。",[219,221,223,225,227],{"key":20,"text":220,"correct":22},"图样部分中,水平方向表示路线长度,垂直方向表示宽度",{"key":24,"text":222,"correct":29},"图样中不规则的细折线表示道路路面中心线的设计高程",{"key":27,"text":224,"correct":22},"图上常用比较规则的直线与曲线相间粗实线图示出设计线,",{"key":31,"text":226,"correct":29},"在设计线上标注沿线设置的水准点所在的里程",{"key":34,"text":228,"correct":22},"在设计线的上方或下方标注其编号及与路线的相对位置","ACE",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":81,"analysis":37},1275932,"下列说法中正确的是( )。",[234,236,238,240,242],{"key":20,"text":235,"correct":22},"地形图样中用箭头表示其方位",{"key":24,"text":237,"correct":29},"细点画线表示道路各条车道及分隔带",{"key":27,"text":239,"correct":22},"地形情况一般用等高线或地形线表示",{"key":31,"text":241,"correct":29},"3K+100,即距离道路起点3001m",{"key":34,"text":243,"correct":29},"YH为“缓圆”交点",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":184,"analysis":37},1275933,"下列对于立体交叉口工程图的组成及作用说法正确的是( )。",[248,250,252,254,256],{"key":20,"text":249,"correct":22},"立体交叉口工程图主要包括:平面设计图、立体交叉纵断面设计图、连接部位的设计图",{"key":24,"text":251,"correct":29},"平面设计图内容只包括立体交叉口的平面设计形式",{"key":27,"text":253,"correct":29},"平面设计图的作用是表示立体交叉的方式",{"key":31,"text":255,"correct":22},"立体交叉纵断面图作用是表达立体交叉的复杂情况,同时清晰明朗地表达道路横向与纵向的对应关系",{"key":34,"text":257,"correct":22},"连接部位的设计图包括连接位置图、连接部位大样图、分隔带断面图和标高数据图",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":272,"analysis":37},1275934,"道路横断面图是沿道路中心线垂直方向的断面图,其包括( )。",[262,264,266,268,270],{"key":20,"text":263,"correct":29},"道路路面结构图",{"key":24,"text":265,"correct":22},"路线标准横断面图",{"key":27,"text":267,"correct":29},"竖向设计图",{"key":31,"text":269,"correct":22},"路基一般设计图",{"key":34,"text":271,"correct":22},"特殊路基设计图","BDE",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":96,"analysis":37},1275935,"城镇道路工程施工图主要包括( )。",[277,279,280,282,284],{"key":20,"text":278,"correct":22},"道路工程图",{"key":24,"text":263,"correct":22},{"key":27,"text":281,"correct":22},"道路交叉工程图",{"key":31,"text":283,"correct":22},"灯光照明与绿化工程图",{"key":34,"text":285,"correct":29},"道路基础结构图",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":300,"analysis":37},1275936,"下列关于防水卷材的相关说法中,正确的是( )。",[290,292,294,296,298],{"key":20,"text":291,"correct":29},"评价沥青混合料高温稳定性的方法通常采用三轴试验",{"key":24,"text":293,"correct":22},"工程实际中常根据试件的低温劈裂试验来间接评定沥青混合料的抗低温能力",{"key":27,"text":295,"correct":22},"我国现行标准采用孔隙率、饱和度和残留稳定度等指标来表征沥青混合料的耐久性",{"key":31,"text":297,"correct":29},"荷载重复作用的次数越多它能承受的应力或应变值就越大",{"key":34,"text":299,"correct":29},"影响沥青混合料施工和易性的因素主要是含蜡量","BC",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":229,"analysis":37},1275937,"下列关于说法中,正确的是( )。",[305,307,309,311,313],{"key":20,"text":306,"correct":22},"矿粉在沥青混合料中起填充与改善沥青性能的作用",{"key":24,"text":308,"correct":29},"矿粉原石料中的泥土质量分数要小于2%",{"key":27,"text":310,"correct":22},"当采用水泥、石灰、粉煤灰作填料时,其用量不宜超过矿料总量的2%",{"key":31,"text":312,"correct":29},"粉煤灰烧失量小于10%",{"key":34,"text":314,"correct":22},"矿粉宜采用石灰岩或岩浆岩中的强基性岩石经磨细得到的矿粉",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":329,"analysis":37},1275938,"下列关于沥青混合料分类相关说法中,正确的是( )。",[319,321,323,325,327],{"key":20,"text":320,"correct":29},"特粗式沥青碎石混合料:集料最大粒径为35.5mm",{"key":24,"text":322,"correct":22},"粗粒式沥青混合料:集料最大粒径为26.5mrn或31.5mm的沥青混合料",{"key":27,"text":324,"correct":29},"中粒式沥青混合料:集料最大粒径为16mm或21mm的沥青混合料",{"key":31,"text":326,"correct":22},"细粒式沥青混合料:集料最大粒径为95mm或13.2mm的沥青混合料",{"key":34,"text":328,"correct":29},"砂粒式沥青混合料:集料最大粒径为475mm或7.75mm的沥青混合料","BD",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":36,"analysis":37},1275939,"下列关于砌筑用石材的分类及应用的相关说法中,正确的是( )。",[334,336,338,340,342],{"key":20,"text":335,"correct":22},"装饰用石材主要为板材",{"key":24,"text":337,"correct":22},"细料石通过细加工、外形规则,叠砌面凹人深度不应大于10mm,截面的宽度、高度不应小于200mm,且不应小于长度的1\u002F4",{"key":27,"text":339,"correct":29},"毛料石外形大致方正,一般不加工或稍加修整,高度不应小于200mm,叠砌面凹入深度不应大于20mm",{"key":31,"text":341,"correct":29},"毛石指形状不规则,中部厚度不小于300mm的石材",{"key":34,"text":343,"correct":22},"装饰用石材主要用于公共建筑或装饰等级要求较高的室内外装饰工程",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":52,"analysis":37},1275940,"混凝土缓凝剂主要用于( )的施工。",[348,350,352,354,356],{"key":20,"text":349,"correct":22},"高温季节施工的混凝土",{"key":24,"text":351,"correct":29},"蒸养混凝土",{"key":27,"text":353,"correct":22},"大体积混凝土",{"key":31,"text":355,"correct":22},"滑模施工混凝土",{"key":34,"text":357,"correct":29},"商品混凝土",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":372,"analysis":37},1275941,"通用水泥的主要技术性质包括( )。",[362,364,366,368,370],{"key":20,"text":363,"correct":22},"细度",{"key":24,"text":365,"correct":22},"标准稠度及其用水量",{"key":27,"text":367,"correct":29},"黏滞性",{"key":31,"text":369,"correct":22},"体积安定性",{"key":34,"text":371,"correct":22},"强度","ABDE",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":81,"analysis":37},1275942,"下列关于通用水泥的主要技术性质指标的基本规定中,表述错误的是( )。",[377,379,381,383,385],{"key":20,"text":378,"correct":22},"硅酸盐水泥的细度用密闭式比表面仪测定",{"key":24,"text":380,"correct":29},"硅酸盐水泥初凝时间不得早于45min,终凝时间不得迟于6.5h",{"key":27,"text":382,"correct":22},"水泥熟料中游离氧化镁含量不得超过5.0%,三氧化硫含量不得超过3.5%。体积安定性不合格的水泥可用于次要工程中",{"key":31,"text":384,"correct":29},"水泥强度是表征水泥力学性能的重要指标,它与水泥的矿物组成、水泥细度、水胶比大小、水化龄期和环境温度等密切相关",{"key":34,"text":386,"correct":29},"熟料矿物中铝酸三钙和硅酸三钙的含量愈高,颗粒愈细,则水化热愈大",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":401,"analysis":37},1275943,"下列关于通用水泥的特性及应用的基本规定中,表述正确的是( )。",[391,393,395,397,399],{"key":20,"text":392,"correct":29},"复合硅酸盐水泥适用于早期强度要求高的工程及冬期施工的工程",{"key":24,"text":394,"correct":22},"矿渣硅酸盐水泥适用于大体积混凝土工程",{"key":27,"text":396,"correct":29},"粉煤灰硅酸盐水泥适用于有抗渗要求的工程",{"key":31,"text":398,"correct":29},"火山灰质硅酸盐水泥适用于抗裂性要求较高的构件",{"key":34,"text":400,"correct":22},"硅酸盐水泥适用于严寒地区遭受反复冻融作用的混凝土工程","BE",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":416,"analysis":37},1275944,"根据《安全生产管理条例》,以下分部分项工程需要编制专项施工方案( )。",[406,408,410,412,414],{"key":20,"text":407,"correct":22},"基坑支护与降水工程",{"key":24,"text":409,"correct":22},"拆除、爆破工程",{"key":27,"text":411,"correct":22},"土方开挖工程",{"key":31,"text":413,"correct":29},"屋面工程",{"key":34,"text":415,"correct":29},"砌筑工程","ABC",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":431,"analysis":37},1275945,"下列措施中,属于生产经营单位安全生产保障措施中经济保障措施的是( )。",[421,423,425,427,429],{"key":20,"text":422,"correct":22},"保证劳动防护用品、安全生产培训所需要的资金",{"key":24,"text":424,"correct":22},"保证安全设施所需要的资金",{"key":27,"text":426,"correct":22},"保证安全生产所必需要的资金",{"key":31,"text":428,"correct":29},"保证员工食宿设备所需要的资金",{"key":34,"text":430,"correct":22},"保证工伤社会保险所需的资金","ABCE",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":140,"analysis":37},1275946,"在进行生产安全事故报告和调查处理时,必须坚持“四不放过”的原则,包括( )。",[436,438,440,442,444],{"key":20,"text":437,"correct":22},"事故原因分析不清楚不放过",{"key":24,"text":439,"correct":22},"事故责任者和群众没有受到教育不放过",{"key":27,"text":441,"correct":29},"事故单位未处理不放过",{"key":31,"text":443,"correct":22},"事故责任者没有处理不放过",{"key":34,"text":445,"correct":29},"没有制定防范措施不放过",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":416,"analysis":37},1275947,"以下各类市政公用工程的施工中,二级企业可以承揽的有( )。",[450,452,454,456,458],{"key":20,"text":451,"correct":22},"各类城市道路;单跨跨度45m及以下的城市桥梁",{"key":24,"text":453,"correct":22},"各类城市生活垃圾处理工程",{"key":27,"text":455,"correct":22},"各类城市广场、地面停车场硬质铺装",{"key":31,"text":457,"correct":29},"单项合同额4500丙元及以下的市政综合工程",{"key":34,"text":459,"correct":29},"供热面积200万m2的热力工程",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":169,"analysis":37},1275948,"以下关于市政公用工程施工总承包企业承包工程范围的说法,错误的是( )。",[464,466,468,470,472],{"key":20,"text":465,"correct":29},"一级企业可承担各类市政公用工程的施工",{"key":24,"text":467,"correct":29},"三级企业可承担单项合同额2500万元及以下的城市生活垃圾处理工程",{"key":27,"text":469,"correct":29},"二级企业可承担单项合同额4000万元及以下的市政综合工程",{"key":31,"text":471,"correct":22},"三级企业可承担单项合同额3000万元及以下的市政综合工程",{"key":34,"text":473,"correct":22},"二级企业可承担断面30平方米及以下隧道工程和地下交通工程",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":199,"analysis":37},1275949,"以下专业承包企业资质等级分为一、二、三级的是( )。",[478,480,482,483,485],{"key":20,"text":479,"correct":22},"地基与基础工程",{"key":24,"text":481,"correct":29},"预拌混凝土",{"key":27,"text":7,"correct":22},{"key":31,"text":484,"correct":22},"子与智能化工程",{"key":34,"text":486,"correct":22},"城市及道路照明工程",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":199,"analysis":37},1275950,"建设活动中的行政管理关系,是国家及其建设行政主管部门同( )及建设监理等中介服务单位之间的管理与被管理关系。",[491,493,495,497,499],{"key":20,"text":492,"correct":22},"建设单位",{"key":24,"text":494,"correct":29},"劳务分包单位",{"key":27,"text":496,"correct":22},"施工单位",{"key":31,"text":498,"correct":22},"筑材料和设备的生产供应单位",{"key":34,"text":500,"correct":22},"设计单位",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":140,"analysis":37},1275951,"建设法规的调整对象,即发生在各种建设活动中的社会关系,包括( )。",[505,507,509,511,513],{"key":20,"text":506,"correct":22},"建设活动中的行政管理关系",{"key":24,"text":508,"correct":22},"建设活动中的经济协作关系",{"key":27,"text":510,"correct":29},"设活动中的财产人身关系",{"key":31,"text":512,"correct":22},"建设活动中相关的民事关系",{"key":34,"text":514,"correct":29},"建设活动中的人身关系",{"id":516,"libraryId":5,"type":517,"typeLabel":518,"stem":519,"options":520,"answer":522,"analysis":37},1275952,3,"判断题","安全管理的对象是生产中一切人、物、环境、管理状态,安全管理是一种动态管理。",[521,523],{"key":20,"text":522,"correct":22},"正确",{"key":24,"text":524,"correct":29},"错误",{"id":526,"libraryId":5,"type":517,"typeLabel":518,"stem":527,"options":528,"answer":524,"analysis":37},1275953,"项目质量控制贯穿于项目施工的全过程。",[529,530],{"key":20,"text":522,"correct":29},{"key":24,"text":524,"correct":22},{"id":532,"libraryId":5,"type":517,"typeLabel":518,"stem":533,"options":534,"answer":524,"analysis":37},1275954,"施工项目的生产要素主要包括劳动力、材料、技术和资金。",[535,536],{"key":20,"text":522,"correct":29},{"key":24,"text":524,"correct":22},{"id":538,"libraryId":5,"type":517,"typeLabel":518,"stem":539,"options":540,"answer":522,"analysis":37},1275955,"冲击韧性指标是通过标准试件的弯曲冲击韧性试验确定的。",[541,542],{"key":20,"text":522,"correct":22},{"key":24,"text":524,"correct":29},{"id":544,"libraryId":5,"type":517,"typeLabel":518,"stem":545,"options":546,"answer":524,"analysis":37},1275956,"低碳钢拉伸时,从受拉至拉断,经历的四个阶段为:弹性阶段,强化阶段,屈服阶段和颈缩阶段。",[547,548],{"key":20,"text":522,"correct":29},{"key":24,"text":524,"correct":22},{"id":550,"libraryId":5,"type":517,"typeLabel":518,"stem":551,"options":552,"answer":522,"analysis":37},1275957,"混凝土外加剂按照其主要功能分为高性能减水剂、高效减水剂、普通减水剂、引气减水剂、泵送剂、早强剂、缓凝剂和引气剂共八类。",[553,554],{"key":20,"text":522,"correct":22},{"key":24,"text":524,"correct":29},{"id":556,"libraryId":5,"type":517,"typeLabel":518,"stem":557,"options":558,"answer":522,"analysis":37},1275958,"我国目前采用劈裂试验方法测定混凝土的抗拉强度。劈裂试验方法是采用边长为150mm的立方体标准试件,按规定的劈裂拉伸试验方法测定的混凝土的劈裂抗拉强度。",[559,560],{"key":20,"text":522,"correct":22},{"key":24,"text":524,"correct":29},{"id":562,"libraryId":5,"type":517,"typeLabel":518,"stem":563,"options":564,"answer":524,"analysis":37},1275959,"气硬性胶凝材料只能在空气中凝结、硬化、保持和发展强度,一般只适用于干燥环境,不宜用于潮湿环境与水中;那么水硬性胶凝材料则只能适用于潮湿环境与水中。",[565,566],{"key":20,"text":522,"correct":29},{"key":24,"text":524,"correct":22},{"id":568,"libraryId":5,"type":517,"typeLabel":518,"stem":569,"options":570,"answer":522,"analysis":37},1275960,"施工单位应当在施工现场入口处、施工起重机械、临时用电设施、脚手架等危险部位,设置明显的安全警示标志。",[571,572],{"key":20,"text":522,"correct":22},{"key":24,"text":524,"correct":29},{"id":574,"libraryId":5,"type":517,"typeLabel":518,"stem":575,"options":576,"answer":524,"analysis":37},1275961,"施工技术交底的目的是使现场施工人员对安全生产有所了解,最大限度避免安全事故的发生。",[577,578],{"key":20,"text":522,"correct":29},{"key":24,"text":524,"correct":22},{"id":580,"libraryId":5,"type":517,"typeLabel":518,"stem":581,"options":582,"answer":524,"analysis":37},1275962,"某实行施工总承包的建设工程的分包单位所承担的分包工程发生生产安全事故,分包单位负责人应当立即如实报告给当地建设行政主管部门。",[583,584],{"key":20,"text":522,"correct":29},{"key":24,"text":524,"correct":22},{"id":586,"libraryId":5,"type":517,"typeLabel":518,"stem":587,"options":588,"answer":524,"analysis":37},1275963,"生产经营单位发生生产安全事故后,事故现场相关人员应当立即报告施工项目经理。",[589,590],{"key":20,"text":522,"correct":29},{"key":24,"text":524,"correct":22},{"id":592,"libraryId":5,"type":517,"typeLabel":518,"stem":593,"options":594,"answer":524,"analysis":37},1275964,"生产经营单位的特种作业人员必须按照国家有关规定经生产经营单位组织的安全作业培训,方可上岗作业。",[595,596],{"key":20,"text":522,"correct":29},{"key":24,"text":524,"correct":22},{"id":598,"libraryId":5,"type":517,"typeLabel":518,"stem":599,"options":600,"answer":524,"analysis":37},1275965,"由一个国家现行的各个部门法构成的有机联系的统一整体通常称为法律部门。",[601,602],{"key":20,"text":522,"correct":29},{"key":24,"text":524,"correct":22},{"id":604,"libraryId":5,"type":517,"typeLabel":518,"stem":605,"options":606,"answer":524,"analysis":37},1275966,"《劳动法》规定,试用期最长不超过3个月。",[607,608],{"key":20,"text":522,"correct":29},{"key":24,"text":524,"correct":22},{"id":610,"libraryId":5,"type":517,"typeLabel":518,"stem":611,"options":612,"answer":522,"analysis":37},1275967,"国务院建设行政主管部门对全国建设工程安全生产工作实施综合监督管理。",[613,614],{"key":20,"text":522,"correct":22},{"key":24,"text":524,"correct":29},[616,620,623,626,628,631],{"id":617,"name":618,"category":7,"favorite":619},1,"领导干部任职前廉政法规知识测试题",92,{"id":621,"name":622,"category":7,"favorite":617},595,"建筑结构与设备",{"id":624,"name":625,"category":7,"favorite":617},715,"招标采购专业知识与法律法规",{"id":627,"name":6,"category":7,"favorite":617},848,{"id":629,"name":630,"category":7,"favorite":8},534,"BIM工程师",{"id":632,"name":630,"category":7,"favorite":8},535]