[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1275906":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1275906,864,2,"多选题","下列关于施工项目目标控制的措施说法错误的是( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","施工项目进度控制的措施主要有组织措施、技术措施、合同措施、经济措施",false,{"key":16,"text":17,"correct":18},"B","经济措施主要是建立健全目标控制组织,完善组织内各部门及人员的职责分工",true,{"key":20,"text":21,"correct":14},"C","技术措施主要是项目目标控制中所用的技术措施有两大类:一类是硬技术,即工艺技术",{"key":23,"text":24,"correct":14},"D","合同措施是指严格执行和完成合同规定的一切内容,阶段性检查合同履行情况,对偏离合同的行为应及时采取纠正措施",{"key":26,"text":27,"correct":18},"E","组织措施是目标控制的基础,制定有关规章制度,保证制度的贯彻与执行,建.立健全控制信息流通的渠道","BE","",{"id":6,"name":31,"category":32,"favorite":33},"市政方向-通用基础","建筑工程",0]