[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1275824":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1275824,864,2,"多选题","下列关于土石方运输计算正确的是( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","推土机的运距按挖填方区的重心之间的直线距离计算",true,{"key":16,"text":17,"correct":18},"B","铲运机运距按循环运距的1\u002F3",false,{"key":20,"text":21,"correct":18},"C","铲运机运距按挖方区至弃土区重心之间的直线距离",{"key":23,"text":24,"correct":14},"D","铲运机运距按挖方区至弃土区重心之间的直线距离,另加转向运距45m",{"key":26,"text":27,"correct":14},"E","自卸汽车运距按循环路线的1\u002F2距离计算","ADE","",{"id":6,"name":31,"category":32,"favorite":33},"市政方向-通用基础","建筑工程",0]