[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1275822":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1275822,864,2,"多选题","计算工程量单价的价格依据包括( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","概算定额",false,{"key":16,"text":17,"correct":18},"B","人工单价",true,{"key":20,"text":21,"correct":18},"C","材料价格",{"key":23,"text":24,"correct":18},"D","材料运杂费",{"key":26,"text":27,"correct":18},"E","机械台班费","BCDE","",{"id":6,"name":31,"category":32,"favorite":33},"市政方向-通用基础","建筑工程",0]