[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-863-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":429},{"id":5,"name":6,"category":7,"favorite":8},863,"市政方向-岗位技能","建筑工程",0,4,50,385,[13,38,53,68,82,96,111,126,140,155,169,183,197,207,213,219,225,231,237,243,249,255,261,267,273,279,285,291,297,303,309,315,321,327,333,339,345,351,357,363,369,375,381,387,393,399,405,411,417,423],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1275477,2,"多选题","按使用功能不同,混凝土分( )、水工混凝土、耐热混凝土、耐酸混凝土、大体积混凝土及防辐射混凝土。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","道路混凝土",true,{"key":24,"text":25,"correct":26},"B","桥梁混凝土",false,{"key":28,"text":29,"correct":22},"C","结构用混凝土",{"key":31,"text":32,"correct":26},"D","耐寒混凝土",{"key":34,"text":35,"correct":26},"E","基础结构混凝土","AC","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1275478,"按表观密度不同,混凝土分( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"重混凝土",{"key":24,"text":45,"correct":22},"轻混凝土",{"key":28,"text":47,"correct":26},"密混凝土",{"key":31,"text":49,"correct":22},"普通混凝土",{"key":34,"text":51,"correct":26},"防辐射混凝土","ABD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1275479,"沥青主要以( )三大指标来,评价沥青的质量符合设计或规范要求。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"强度",{"key":24,"text":60,"correct":22},"软化点",{"key":28,"text":62,"correct":22},"针入度",{"key":31,"text":64,"correct":22},"延度",{"key":34,"text":66,"correct":26},"扩展度","BCD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":67,"analysis":37},1275480,"SMA是一种以( )组成的沥青玛玛脂结合料,填充于间断及配的矿料骨架中,所形成的混合料。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"橡胶",{"key":24,"text":75,"correct":22},"沥青",{"key":28,"text":77,"correct":22},"粉",{"key":31,"text":79,"correct":22},"纤维稳定剂",{"key":34,"text":81,"correct":26},"高分子聚合物",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":95,"analysis":37},1275481,"改性沥青混合料是指掺加橡胶、( )、磨细的橡胶粉或其他填料等外掺剂,使沥青或沥青混合料的性能得以改善制成的沥青混合剂。",[86,88,90,92,93],{"key":20,"text":87,"correct":26},"二灰",{"key":24,"text":89,"correct":26},"水泥",{"key":28,"text":91,"correct":22},"树脂",{"key":31,"text":81,"correct":22},{"key":34,"text":94,"correct":26},"有机物","CD",{"id":97,"libraryId":5,"type":15,"typeLabel":16,"stem":98,"options":99,"answer":110,"analysis":37},1275482,"沥青混合料分为( )。",[100,102,104,106,108],{"key":20,"text":101,"correct":22},"粗粒式",{"key":24,"text":103,"correct":22},"中粒式",{"key":28,"text":105,"correct":22},"细粒式",{"key":31,"text":107,"correct":26},"砂粒式",{"key":34,"text":109,"correct":26},"石粒式","ABC",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":125,"analysis":37},1275484,"属于施工项目质量计划编制的方法有( )。",[115,117,119,121,123],{"key":20,"text":116,"correct":22},"收集有关工程资料",{"key":24,"text":118,"correct":22},"确定项目质量目标",{"key":28,"text":120,"correct":22},"设置质量管理体系",{"key":31,"text":122,"correct":22},"制定项目质量控制程序",{"key":34,"text":124,"correct":26},"明确质量监管体系","ABCD",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":110,"analysis":37},1275486,"以下属于质量计划的编制要求的有( )。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"质量目标",{"key":24,"text":133,"correct":22},"管理职责",{"key":28,"text":135,"correct":22},"资源提供",{"key":31,"text":137,"correct":26},"项目改进策划",{"key":34,"text":139,"correct":26},"管理计划",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":154,"analysis":37},1275487,"影响施工质量的因素主要包括五大方面:( )、方法和环境。在施工过程中对这五方面因素严加控制是保证工程质量的关键。",[144,146,148,150,152],{"key":20,"text":145,"correct":22},"人员",{"key":24,"text":147,"correct":26},"设备",{"key":28,"text":149,"correct":22},"机械",{"key":31,"text":151,"correct":22},"材料",{"key":34,"text":153,"correct":26},"规程","ACD",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":67,"analysis":37},1275488,"施工机械设备是指施工过程中使用的各类机具设备,包括运输设备、( )以及施工安全设施等。",[159,161,163,165,167],{"key":20,"text":160,"correct":26},"施工器具",{"key":24,"text":162,"correct":22},"操作工具",{"key":28,"text":164,"correct":22},"测量仪器",{"key":31,"text":166,"correct":22},"计量器具",{"key":34,"text":168,"correct":26},"检测器具",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":52,"analysis":37},1275489,"工程项目建设人力资源组织复杂,有( ),此外还有分包企业人员和劳务人员。",[173,175,177,179,181],{"key":20,"text":174,"correct":22},"企业的管理人员",{"key":24,"text":176,"correct":22},"现场施工专业人员",{"key":28,"text":178,"correct":26},"工程管理人员",{"key":31,"text":180,"correct":22},"作业人员",{"key":34,"text":182,"correct":26},"监管人员",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":67,"analysis":37},1275490,"工程建设项目,特别是市政工程建设项目具有建设规模大、( )等特点。这一特点,决定了质量策划的难度。",[187,189,191,193,195],{"key":20,"text":188,"correct":26},"检测技术不完善",{"key":24,"text":190,"correct":22},"分期建设",{"key":28,"text":192,"correct":22},"多种专业配合",{"key":31,"text":194,"correct":22},"对施工工艺和施工方法的要求高",{"key":34,"text":196,"correct":26},"专业性强",{"id":198,"libraryId":5,"type":199,"typeLabel":200,"stem":201,"options":202,"answer":206,"analysis":37},1275491,3,"判断题","工程完工后施工单位对所有工程资料进行收集整理,编制组卷。",[203,205],{"key":20,"text":204,"correct":26},"正确",{"key":24,"text":206,"correct":22},"错误",{"id":208,"libraryId":5,"type":199,"typeLabel":200,"stem":209,"options":210,"answer":204,"analysis":37},1275492,"分部工程验收记录由施工项目专业质量检查员填写,专业监理工程师组织施工单位项目负责人和有关勘察、设计单位项目负责人等进行验收。",[211,212],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":214,"libraryId":5,"type":199,"typeLabel":200,"stem":215,"options":216,"answer":204,"analysis":37},1275493,"检验（收）批的质量验收包括了质量资料的检查和主控项目、一般项目的检（试）验两方面的内容。",[217,218],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":220,"libraryId":5,"type":199,"typeLabel":200,"stem":221,"options":222,"answer":204,"analysis":37},1275494,"水池应按设计要求进行满水试验和气密性试验,并由试验（检测）单位出具试验（检测）报告。",[223,224],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":226,"libraryId":5,"type":199,"typeLabel":200,"stem":227,"options":228,"answer":204,"analysis":37},1275495,"原材料的质量证明文件、复验报告,工程物资质量必须合格,并有出厂质量证明文件,对列入国家强制商检目录或建设单位有特殊要求的进口物资还应有进口商检证明文件。",[229,230],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":232,"libraryId":5,"type":199,"typeLabel":200,"stem":233,"options":234,"answer":204,"analysis":37},1275496,"市政基础设施工程施工资料分类,应根据工程类别和专业项目进行划分。按照《市政基础设施工程资料管理规程》的要求,施工资料宜分为施工管理资料、施工技术资料、工程物资资料、施工测量监测资料、施工记录、施工试验记录及检测报告、施工质量验收资料和工程竣工验收资料等八类。",[235,236],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":238,"libraryId":5,"type":199,"typeLabel":200,"stem":239,"options":240,"answer":204,"analysis":37},1275497,"工程资料管理应建立岗位责任制,工程资料的收集、整理应由专人负责。",[241,242],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":244,"libraryId":5,"type":199,"typeLabel":200,"stem":245,"options":246,"answer":204,"analysis":37},1275498,"钢尺是薄钢片制成的带状尺,可卷入金属圆盒内,故又称钢卷尺。尺宽约10~15mm,长度有20m、30m和50m等几种。",[247,248],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":250,"libraryId":5,"type":199,"typeLabel":200,"stem":251,"options":252,"answer":204,"analysis":37},1275499,"弯沉仪适用于路面回弹弯沉值测定,以评价路面的整体强度。",[253,254],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":256,"libraryId":5,"type":199,"typeLabel":200,"stem":257,"options":258,"answer":206,"analysis":37},1275500,"坍落度筒适用于坍落度在1一15cm,最大集料粒径不大于50mm的塑性混凝土做坍落试验。",[259,260],{"key":20,"text":204,"correct":26},{"key":24,"text":206,"correct":22},{"id":262,"libraryId":5,"type":199,"typeLabel":200,"stem":263,"options":264,"answer":204,"analysis":37},1275501,"环刀是用来取原状土的是做重度（土体密度）、压缩、剪切和渗透等试验必不可少的一种常见仪器。主要用来测定土体的压实度。",[265,266],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":268,"libraryId":5,"type":199,"typeLabel":200,"stem":269,"options":270,"answer":204,"analysis":37},1275502,"水准仪主要部件有望远镜、管水准器（或补偿器）、垂直轴、基座、脚螺旋。",[271,272],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":274,"libraryId":5,"type":199,"typeLabel":200,"stem":275,"options":276,"answer":204,"analysis":37},1275503,"外观质量对结构的使用要求、使用功能、美观等都有较大影响,必须通过抽样检查来确定能否合格,是否达到合格的工程内容。",[277,278],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":280,"libraryId":5,"type":199,"typeLabel":200,"stem":281,"options":282,"answer":204,"analysis":37},1275504,"隐蔽工程验收通常是结合质量控制中技术复核、质量检查工作来进行,重要部位改变时可摄影以备查考。",[283,284],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":286,"libraryId":5,"type":199,"typeLabel":200,"stem":287,"options":288,"answer":204,"analysis":37},1275505,"分项工程验收由专业监理工程师组织施工项目专业技术负责人等进行。分项工程验收是在检验批验收合格的基础上进行,通常起一个归纳整理的作用,是一个统计表,没有实质性验收内容。",[289,290],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":292,"libraryId":5,"type":199,"typeLabel":200,"stem":293,"options":294,"answer":204,"analysis":37},1275506,"检验批又称验收批,前者指施工单位自检,后者指留卫生人员参加的验收是施工质量控制和专业验收基础项目,通常需要按工程量、施工段、变形缝等进行划分。",[295,296],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":298,"libraryId":5,"type":199,"typeLabel":200,"stem":299,"options":300,"answer":204,"analysis":37},1275507,"隐蔽工程是指那些在施工过程中上一道工序的工作结束,被下一道工序所掩盖,而无法进行复查的部位。",[301,302],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":304,"libraryId":5,"type":199,"typeLabel":200,"stem":305,"options":306,"answer":204,"analysis":37},1275508,"超厚回填是沟槽回填土或路基填方不按规定的虚铺厚度回填,或未按规定的分层厚度回填。",[307,308],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":310,"libraryId":5,"type":199,"typeLabel":200,"stem":311,"options":312,"answer":204,"analysis":37},1275509,"碾压设备选择不当,超厚回填,填土土质不符合要求,带水回填冻块土和在冻槽上回填,不按段落分层夯实,会造成回填土不密实。",[313,314],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":316,"libraryId":5,"type":199,"typeLabel":200,"stem":317,"options":318,"answer":206,"analysis":37},1275510,"检查井井框与路面高差值过大（标准为6mm）形成行驶冲击荷载,致使路基下沉造成检查井周边下沉、破损。",[319,320],{"key":20,"text":204,"correct":26},{"key":24,"text":206,"correct":22},{"id":322,"libraryId":5,"type":199,"typeLabel":200,"stem":323,"options":324,"answer":204,"analysis":37},1275511,"开挖检查井沟槽断面尺寸不符合要求,井室砌筑后,井室槽周围回填工作面窄,夯实机具不到位或根本无法夯实,造成回填密实度达不到规定要求。",[325,326],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":328,"libraryId":5,"type":199,"typeLabel":200,"stem":329,"options":330,"answer":204,"analysis":37},1275512,"当不合格品按修补方式处理后仍无法保证达到设计的使用要求和安全,而又无法返工处理的情况下,不得已时可以做出结构卸荷、减荷以及限制使用的决定。",[331,332],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":334,"libraryId":5,"type":199,"typeLabel":200,"stem":335,"options":336,"answer":204,"analysis":37},1275513,"埋地钢管环氧煤油沥青防腐绝缘层总厚度不够,涂层不均匀,有褶皱、鼓包等质量缺陷,影响整个管道系统的使用寿命。",[337,338],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":340,"libraryId":5,"type":199,"typeLabel":200,"stem":341,"options":342,"answer":204,"analysis":37},1275514,"管道回填土应符合设计要求,且不得有石块、杂物、硬物等,以便避免伤及管道;严禁带水回填作业,管道周围应用中砂或砂性土回填。",[343,344],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":346,"libraryId":5,"type":199,"typeLabel":200,"stem":347,"options":348,"answer":204,"analysis":37},1275515,"所谓烧穿是指在焊缝底部形成穿孔,造成熔化金属往下漏的现象。",[349,350],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":352,"libraryId":5,"type":199,"typeLabel":200,"stem":353,"options":354,"answer":204,"analysis":37},1275516,"在管道焊接中,一般的小管径多采用气焊,大管径则采用电弧焊接。",[355,356],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":358,"libraryId":5,"type":199,"typeLabel":200,"stem":359,"options":360,"answer":204,"analysis":37},1275517,"管道通入介质后,在碳素钢管的焊口处出现潮湿、滴漏现象,这将严重影响管道使用功能和安全,应分析确定成因后进行必要的处理。",[361,362],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":364,"libraryId":5,"type":199,"typeLabel":200,"stem":365,"options":366,"answer":204,"analysis":37},1275518,"焊缝成型不好,出现高低不平、宽窄不匀的现象,产生这种现象的原因主要是焊接工艺参数选择不合理或操作不当,或者是在使用电焊时,选择电流过大,焊条熔化太快,从而不易控制焊缝成型。",[367,368],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":370,"libraryId":5,"type":199,"typeLabel":200,"stem":371,"options":372,"answer":204,"analysis":37},1275519,"顶管过程中,中心线标高的偏差超过允许值,导致顶力增加。",[373,374],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":376,"libraryId":5,"type":199,"typeLabel":200,"stem":377,"options":378,"answer":204,"analysis":37},1275520,"一旦发生管道基础高程错误,如误差在验收规范允许偏差范围内,则一般作微小的调整;超过允许偏差范围只有拆除基础返工重做。",[379,380],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":382,"libraryId":5,"type":199,"typeLabel":200,"stem":383,"options":384,"answer":204,"analysis":37},1275521,"当管道基础铺设后发现基础高度不符合设计要求,特别是重力流管道发生倒坡时,必须返工重做。",[385,386],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":388,"libraryId":5,"type":199,"typeLabel":200,"stem":389,"options":390,"answer":206,"analysis":37},1275522,"管道基础尺寸线形偏差的原因是挖土操作不注意修边,产生上窄下宽的现象,直至沟槽底部宽度不足。",[391,392],{"key":20,"text":204,"correct":26},{"key":24,"text":206,"correct":22},{"id":394,"libraryId":5,"type":199,"typeLabel":200,"stem":395,"options":396,"answer":204,"analysis":37},1275523,"如果槽底土壤被扰动或受水浸泡,应先挖除松软土层,对超挖部分用砂砾石或碎石等稳定性好的材料回填密实。",[397,398],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":400,"libraryId":5,"type":199,"typeLabel":200,"stem":401,"options":402,"answer":204,"analysis":37},1275524,"管道接口渗漏水、闭水试验不合格产生的原因是:基础不均匀下沉,管材及其接口施工质量差、闭水段端头封堵不严密、井体施工质量差等原因均可产生漏水现象。",[403,404],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":406,"libraryId":5,"type":199,"typeLabel":200,"stem":407,"options":408,"answer":204,"analysis":37},1275525,"在浇筑水泥混凝土基础过程中突遇强降水,地面水大量冲入沟槽,使水泥浆流失,水泥混凝土结构损坏。",[409,410],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":412,"libraryId":5,"type":199,"typeLabel":200,"stem":413,"options":414,"answer":204,"analysis":37},1275526,"当槽底土体遇有原暗浜或流砂现象,沟槽降水措施不良或井点失效,处理时间过长,直接造成已浇筑的水泥混凝土基础拱起甚至开裂。",[415,416],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":418,"libraryId":5,"type":199,"typeLabel":200,"stem":419,"options":420,"answer":204,"analysis":37},1275527,"桥头跳车的主要原因为桥头搭板的一端搭在桥台牛腿上,基本无沉降,而另一端则置于路堤上,随路堤的沉降而下沉,使之在搭板的前后端形成较大的沉降坡差,当沉降到达一定数量时,就会引起跳车。",[421,422],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},{"id":424,"libraryId":5,"type":199,"typeLabel":200,"stem":425,"options":426,"answer":204,"analysis":37},1275528,"浇筑桥面混凝土之前必须严格按设计重新布设钢筋网,以保证钢筋网上下保护层。",[427,428],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":26},[430,434,437,440,443,446],{"id":431,"name":432,"category":7,"favorite":433},1,"领导干部任职前廉政法规知识测试题",92,{"id":435,"name":436,"category":7,"favorite":431},595,"建筑结构与设备",{"id":438,"name":439,"category":7,"favorite":431},715,"招标采购专业知识与法律法规",{"id":441,"name":442,"category":7,"favorite":431},848,"市政方向-通用基础",{"id":444,"name":445,"category":7,"favorite":8},534,"BIM工程师",{"id":447,"name":445,"category":7,"favorite":8},535]