[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-863-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":512},{"id":5,"name":6,"category":7,"favorite":8},863,"市政方向-岗位技能","建筑工程",0,1,50,385,[13,33,45,55,67,79,91,103,114,126,134,143,155,166,174,185,193,202,211,219,229,241,249,257,265,277,287,296,305,316,328,340,348,356,365,373,385,396,404,412,420,429,437,445,453,461,470,482,490,500],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":26,"analysis":32},1275327,"单选题","工程资料案卷不宜过厚,一般不超过( )mm。",[18,22,25,29],{"key":19,"text":20,"correct":21},"A","20",false,{"key":23,"text":24,"correct":21},"B","30",{"key":26,"text":27,"correct":28},"C","40",true,{"key":30,"text":31,"correct":21},"D","50","",{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":26,"analysis":32},1275328,"烧结普通（多孔）砖MU30,其抗压强度平均值要求不小于( )MPa。",[37,39,40,41,43],{"key":19,"text":38,"correct":21},"10",{"key":23,"text":20,"correct":21},{"key":26,"text":24,"correct":28},{"key":30,"text":42,"correct":21},"35",{"key":44,"text":27,"correct":21},"E",{"id":46,"libraryId":5,"type":9,"typeLabel":15,"stem":47,"options":48,"answer":26,"analysis":32},1275329,"单位工程档案总案卷数超过( )卷的,应编制总目录卷。",[49,50,52,53],{"key":19,"text":38,"correct":21},{"key":23,"text":51,"correct":21},"15",{"key":26,"text":20,"correct":28},{"key":30,"text":54,"correct":21},"25",{"id":56,"libraryId":5,"type":9,"typeLabel":15,"stem":57,"options":58,"answer":23,"analysis":32},1275330,"应有沥青拌合厂按同类型、同配比、每批次向施工单位提供的至少一份产品质量合格证。连续生产时,每( )t提供一次。",[59,61,63,65],{"key":19,"text":60,"correct":21},"1000",{"key":23,"text":62,"correct":28},"2000",{"key":26,"text":64,"correct":21},"3000",{"key":30,"text":66,"correct":21},"5000",{"id":68,"libraryId":5,"type":9,"typeLabel":15,"stem":69,"options":70,"answer":26,"analysis":32},1275331,"土的含水率试验中,将烘干后的试样和盒取出,放入干燥器内冷却,冷却后盖好盒盖,称质量,准确至( )g。",[71,73,75,77],{"key":19,"text":72,"correct":21},"1",{"key":23,"text":74,"correct":21},"0.1",{"key":26,"text":76,"correct":28},"0.01",{"key":30,"text":78,"correct":21},"0.001",{"id":80,"libraryId":5,"type":9,"typeLabel":15,"stem":81,"options":82,"answer":26,"analysis":32},1275332,"土的含水率试验中,将试样和盒放入烘箱内,在温度( )℃恒温下烘干。",[83,85,87,89],{"key":19,"text":84,"correct":21},"95~100",{"key":23,"text":86,"correct":21},"100～105",{"key":26,"text":88,"correct":28},"105~110",{"key":30,"text":90,"correct":21},"110~120",{"id":92,"libraryId":5,"type":9,"typeLabel":15,"stem":93,"options":94,"answer":30,"analysis":32},1275333,"土的含水率试验中,取具有代表性试样,细粒土15～30g,砂类土、有机质土为( ),沙砾石为1—2kg。",[95,97,99,101],{"key":19,"text":96,"correct":21},"20g",{"key":23,"text":98,"correct":21},"30g",{"key":26,"text":100,"correct":21},"40g",{"key":30,"text":102,"correct":28},"50g",{"id":104,"libraryId":5,"type":9,"typeLabel":15,"stem":105,"options":106,"answer":23,"analysis":32},1275334,"市政工程允许有偏差项目抽样检查超差点的最大偏差值应在允许偏差值的( )倍的范围内。",[107,108,110,112],{"key":19,"text":72,"correct":21},{"key":23,"text":109,"correct":28},"1.5",{"key":26,"text":111,"correct":21},"2",{"key":30,"text":113,"correct":21},"2.5",{"id":115,"libraryId":5,"type":9,"typeLabel":15,"stem":116,"options":117,"answer":19,"analysis":32},1275335,"建设方或监理工程师在施工单位通知检（试）验后( )h内未能进行检（试）验,则视为建设方和监理检（试）验合格,承包商有权覆盖并进行下一道工序。",[118,120,122,124],{"key":19,"text":119,"correct":28},"12",{"key":23,"text":121,"correct":21},"24",{"key":26,"text":123,"correct":21},"36",{"key":30,"text":125,"correct":21},"48",{"id":127,"libraryId":5,"type":9,"typeLabel":15,"stem":128,"options":129,"answer":30,"analysis":32},1275336,"隐蔽工程的验收应由施工单位做好自检记录,在隐蔽验收日提前( )h通知相关单位验收。",[130,131,132,133],{"key":19,"text":119,"correct":21},{"key":23,"text":121,"correct":21},{"key":26,"text":123,"correct":21},{"key":30,"text":125,"correct":28},{"id":135,"libraryId":5,"type":9,"typeLabel":15,"stem":136,"options":137,"answer":23,"analysis":32},1275337,"当直管采用三角形式堆放或两侧加支撑保护的矩形堆放时,堆放高度不宜超过( )m。",[138,139,140,141],{"key":19,"text":72,"correct":21},{"key":23,"text":109,"correct":28},{"key":26,"text":111,"correct":21},{"key":30,"text":142,"correct":21},"3",{"id":144,"libraryId":5,"type":9,"typeLabel":15,"stem":145,"options":146,"answer":23,"analysis":32},1275338,"人工顶管时发生偏差不超过( )mm时,宜采用超挖的方法进行纠偏。",[147,149,151,153],{"key":19,"text":148,"correct":21},"5～10",{"key":23,"text":150,"correct":28},"10～20",{"key":26,"text":152,"correct":21},"5～15",{"key":30,"text":154,"correct":21},"10～15",{"id":156,"libraryId":5,"type":9,"typeLabel":15,"stem":157,"options":158,"answer":23,"analysis":32},1275339,"施工人员可以在沟槽放样时给规定槽宽留出适当余量,一般两边再加放( )cm,以防止因上宽下窄造成底部基础宽度不够。",[159,161,163,164],{"key":19,"text":160,"correct":21},"1～5",{"key":23,"text":162,"correct":28},"5~10",{"key":26,"text":154,"correct":21},{"key":30,"text":165,"correct":21},"15～20",{"id":167,"libraryId":5,"type":9,"typeLabel":15,"stem":168,"options":169,"answer":26,"analysis":32},1275340,"为预防桥头跳车,分层填筑砂砾（石）,控制最佳含水量和铺筑层厚,最大填筑厚度不超过( )cm,确保压实度符合标准要求。",[170,171,172,173],{"key":19,"text":38,"correct":21},{"key":23,"text":51,"correct":21},{"key":26,"text":20,"correct":28},{"key":30,"text":54,"correct":21},{"id":175,"libraryId":5,"type":9,"typeLabel":15,"stem":176,"options":177,"answer":26,"analysis":32},1275341,"在设计时应保证沥青混凝土铺装层的厚度满足使用要求,对于高等级路（桥）面,厚度应大于( )cm。",[178,180,182,184],{"key":19,"text":179,"correct":21},"7",{"key":23,"text":181,"correct":21},"8",{"key":26,"text":183,"correct":28},"9",{"key":30,"text":38,"correct":21},{"id":186,"libraryId":5,"type":9,"typeLabel":15,"stem":187,"options":188,"answer":26,"analysis":32},1275342,"避免成孔期间过往大型车辆和设备,控制开钻孔距应跳隔1～2根桩基开钻或新孔应在邻桩成桩( )h后开钻。",[189,190,191,192],{"key":19,"text":119,"correct":21},{"key":23,"text":121,"correct":21},{"key":26,"text":123,"correct":28},{"key":30,"text":125,"correct":21},{"id":194,"libraryId":5,"type":9,"typeLabel":15,"stem":195,"options":196,"answer":19,"analysis":32},1275343,"孔内水位必须稳定地高出孔外水位( )m以上,泥浆泵等钻孔配套设备能量应有一定的安全系数,并有备用设备,以应急需。",[197,198,199,200],{"key":19,"text":72,"correct":28},{"key":23,"text":111,"correct":21},{"key":26,"text":142,"correct":21},{"key":30,"text":201,"correct":21},"4",{"id":203,"libraryId":5,"type":9,"typeLabel":15,"stem":204,"options":205,"answer":26,"analysis":32},1275344,"陆上埋设护筒时,在护筒底部夯填( )cm厚黏土,必须夯打密实。放置护筒后,在护筒四周对称均衡地夯填黏土,防止护筒变形或位移,夯填密实不渗水。",[206,207,208,209],{"key":19,"text":24,"correct":21},{"key":23,"text":27,"correct":21},{"key":26,"text":31,"correct":28},{"key":30,"text":210,"correct":21},"60",{"id":212,"libraryId":5,"type":9,"typeLabel":15,"stem":213,"options":214,"answer":26,"analysis":32},1275345,"管道第二次冲洗应在第一次冲洗后,用有效氯离子含量不低于( )mG\u002FL的清洁水浸泡24h后,再用清洁水进行第二次冲洗直至水质检测、管理部门取样化验合格为止。",[215,216,217,218],{"key":19,"text":38,"correct":21},{"key":23,"text":51,"correct":21},{"key":26,"text":20,"correct":28},{"key":30,"text":54,"correct":21},{"id":220,"libraryId":5,"type":9,"typeLabel":15,"stem":221,"options":222,"answer":19,"analysis":32},1275346,"管道第一次冲洗应用清洁水冲洗至出水口水样浊度小于3NTU为止,冲洗流速应大于( )m\u002Fs。",[223,225,226,228],{"key":19,"text":224,"correct":28},"1.0",{"key":23,"text":109,"correct":21},{"key":26,"text":227,"correct":21},"2.0",{"key":30,"text":113,"correct":21},{"id":230,"libraryId":5,"type":9,"typeLabel":15,"stem":231,"options":232,"answer":26,"analysis":32},1275347,"闭气试验时,地下水位应低于管外底( )mm,环境温度为-15~50℃,下雨时不得进行闭气试验。",[233,235,237,239],{"key":19,"text":234,"correct":21},"100",{"key":23,"text":236,"correct":21},"120",{"key":26,"text":238,"correct":28},"150",{"key":30,"text":240,"correct":21},"180",{"id":242,"libraryId":5,"type":9,"typeLabel":15,"stem":243,"options":244,"answer":23,"analysis":32},1275348,"管道闭水试验中,试验段上游设计水头不超过管顶内壁时,试验水头应以试验段上游管顶内壁加( )m计。",[245,246,247,248],{"key":19,"text":72,"correct":21},{"key":23,"text":111,"correct":28},{"key":26,"text":142,"correct":21},{"key":30,"text":201,"correct":21},{"id":250,"libraryId":5,"type":9,"typeLabel":15,"stem":251,"options":252,"answer":30,"analysis":32},1275349,"圆井采用砌筑逐层砌筑收口,偏心收口时每层收进不应大于( )mm。",[253,254,255,256],{"key":19,"text":20,"correct":21},{"key":23,"text":24,"correct":21},{"key":26,"text":27,"correct":21},{"key":30,"text":31,"correct":28},{"id":258,"libraryId":5,"type":9,"typeLabel":15,"stem":259,"options":260,"answer":23,"analysis":32},1275350,"圆井采用砌筑逐层砌筑收口,四周收口时每层收进不应大于( )mm。",[261,262,263,264],{"key":19,"text":20,"correct":21},{"key":23,"text":24,"correct":28},{"key":26,"text":27,"correct":21},{"key":30,"text":31,"correct":21},{"id":266,"libraryId":5,"type":9,"typeLabel":15,"stem":267,"options":268,"answer":30,"analysis":32},1275351,"管内径大于( )mm的柔性管道,回填施工时应在管内设有竖向支撑。",[269,271,273,275],{"key":19,"text":270,"correct":21},"500",{"key":23,"text":272,"correct":21},"600",{"key":26,"text":274,"correct":21},"700",{"key":30,"text":276,"correct":28},"800",{"id":278,"libraryId":5,"type":9,"typeLabel":15,"stem":279,"options":280,"answer":26,"analysis":32},1275352,"管道两侧和管顶以上( )mm范围内的回填材料,应由沟槽两侧对称运入槽内,不得直接回填在管道上;回填其他部位时,应均匀运入槽内,不得集中推人。",[281,283,285,286],{"key":19,"text":282,"correct":21},"300",{"key":23,"text":284,"correct":21},"400",{"key":26,"text":270,"correct":28},{"key":30,"text":272,"correct":21},{"id":288,"libraryId":5,"type":9,"typeLabel":15,"stem":289,"options":290,"answer":19,"analysis":32},1275353,"沟槽回填管道应符合以下规定:压力管道水压试验前,除接口外,管道两侧及管顶以上回填高度不应小于( )m。",[291,293,294,295],{"key":19,"text":292,"correct":28},"0.5",{"key":23,"text":72,"correct":21},{"key":26,"text":109,"correct":21},{"key":30,"text":111,"correct":21},{"id":297,"libraryId":5,"type":9,"typeLabel":15,"stem":298,"options":299,"answer":23,"analysis":32},1275354,"验槽后原状土地基局部超挖或扰动时应按规范的有关规定进行处理;岩石地基局部超挖时,应将基底碎渣全部清理,回填低强度等级混凝土或粒径( )mm的砂石回填夯实。",[300,301,302,303],{"key":19,"text":148,"correct":21},{"key":23,"text":154,"correct":28},{"key":26,"text":165,"correct":21},{"key":30,"text":304,"correct":21},"20～25",{"id":306,"libraryId":5,"type":9,"typeLabel":15,"stem":307,"options":308,"answer":23,"analysis":32},1275355,"悬臂梁梁体表面无孔洞、露筋、蜂窝、麻面和宽度超过( )m的收缩裂缝。",[309,310,312,314],{"key":19,"text":74,"correct":21},{"key":23,"text":311,"correct":28},"0.15",{"key":26,"text":313,"correct":21},"0.2",{"key":30,"text":315,"correct":21},"0.25",{"id":317,"libraryId":5,"type":9,"typeLabel":15,"stem":318,"options":319,"answer":19,"analysis":32},1275356,"构件吊运时混凝土的强度不得低于设计强度的( )。",[320,322,324,326],{"key":19,"text":321,"correct":28},"75%",{"key":23,"text":323,"correct":21},"80%",{"key":26,"text":325,"correct":21},"90%",{"key":30,"text":327,"correct":21},"100%",{"id":329,"libraryId":5,"type":9,"typeLabel":15,"stem":330,"options":331,"answer":26,"analysis":32},1275357,"装配式梁（板）质量控制,构件吊点的位置应符合设计要求,设计无要求时,应经计算确定。构件的吊环应竖直。吊绳与起吊构件的交角小于( )时应设置吊梁。",[332,334,336,338],{"key":19,"text":333,"correct":21},"30度",{"key":23,"text":335,"correct":21},"45度",{"key":26,"text":337,"correct":28},"60度",{"key":30,"text":339,"correct":21},"75度",{"id":341,"libraryId":5,"type":9,"typeLabel":15,"stem":342,"options":343,"answer":23,"analysis":32},1275358,"承台混凝土浇筑后,应检查承台表面无孔洞、露筋、缺棱掉角、蜂窝、麻面和宽度超过( )mm的收缩裂缝。",[344,345,346,347],{"key":19,"text":74,"correct":21},{"key":23,"text":311,"correct":28},{"key":26,"text":313,"correct":21},{"key":30,"text":315,"correct":21},{"id":349,"libraryId":5,"type":9,"typeLabel":15,"stem":350,"options":351,"answer":30,"analysis":32},1275359,"预制桩混凝土强度达到设计强度的( )方可运打。",[352,353,354,355],{"key":19,"text":321,"correct":21},{"key":23,"text":323,"correct":21},{"key":26,"text":325,"correct":21},{"key":30,"text":327,"correct":28},{"id":357,"libraryId":5,"type":9,"typeLabel":15,"stem":358,"options":359,"answer":19,"analysis":32},1275360,"钢筋、砂浆、拉环、筋带的质量均应按设计要求控制。砌体挡土墙采用的砌筑和石料,强度应符合设计要求,按每品种、每检验（收）批( )组查试验报告。",[360,361,362,364],{"key":19,"text":72,"correct":28},{"key":23,"text":142,"correct":21},{"key":26,"text":363,"correct":21},"5",{"key":30,"text":179,"correct":21},{"id":366,"libraryId":5,"type":9,"typeLabel":15,"stem":367,"options":368,"answer":23,"analysis":32},1275361,"挡土墙地基承载力应符合设计要求,每道挡土墙基槽抽检( )点,查触（钎）探检测报告、隐蔽验收记录。",[369,370,371,372],{"key":19,"text":72,"correct":21},{"key":23,"text":142,"correct":28},{"key":26,"text":363,"correct":21},{"key":30,"text":179,"correct":21},{"id":374,"libraryId":5,"type":9,"typeLabel":15,"stem":375,"options":376,"answer":26,"analysis":32},1275362,"水泥稳定土类质量控制要点中,水泥稳定土类材料7d抗压强度,城市快速路、主干路底基层为( )MPa。",[377,379,381,383],{"key":19,"text":378,"correct":21},"1～2",{"key":23,"text":380,"correct":21},"2～3",{"key":26,"text":382,"correct":28},"3～4",{"key":30,"text":384,"correct":21},"4～5",{"id":386,"libraryId":5,"type":9,"typeLabel":15,"stem":387,"options":388,"answer":26,"analysis":32},1275363,"石灰稳定土类质量控制要点中,压实度抽检,城市快速路、主干路底基层不小于( )。",[389,390,392,394],{"key":19,"text":325,"correct":21},{"key":23,"text":391,"correct":21},"93%",{"key":26,"text":393,"correct":28},"95%",{"key":30,"text":395,"correct":21},"98%",{"id":397,"libraryId":5,"type":9,"typeLabel":15,"stem":398,"options":399,"answer":23,"analysis":32},1275364,"应在接近最佳含水量状态下分层填筑,分层压实,每层松铺厚度不宜超过( )㎝。",[400,401,402,403],{"key":19,"text":38,"correct":21},{"key":23,"text":20,"correct":28},{"key":26,"text":24,"correct":21},{"key":30,"text":27,"correct":21},{"id":405,"libraryId":5,"type":9,"typeLabel":15,"stem":406,"options":407,"answer":23,"analysis":32},1275365,"在施工范围内一般应选用渗水性土或砂砾填筑:台背顺路线方向,上部距翼墙尾端不少于台高加( )m。",[408,409,410,411],{"key":19,"text":72,"correct":21},{"key":23,"text":111,"correct":28},{"key":26,"text":142,"correct":21},{"key":30,"text":201,"correct":21},{"id":413,"libraryId":5,"type":9,"typeLabel":15,"stem":414,"options":415,"answer":30,"analysis":32},1275366,"路基压实度的控制,压实应先轻后重、先慢后快、均匀一致,压路机最快速度不宜超过( )km\u002Fh。",[416,417,418,419],{"key":19,"text":72,"correct":21},{"key":23,"text":111,"correct":21},{"key":26,"text":142,"correct":21},{"key":30,"text":201,"correct":28},{"id":421,"libraryId":5,"type":9,"typeLabel":15,"stem":422,"options":423,"answer":26,"analysis":32},1275367,"当在使用中对水泥质量有怀疑或出厂日期逾( )个月时,应进行复检,并按复验结果使用。",[424,425,426,427],{"key":19,"text":72,"correct":21},{"key":23,"text":111,"correct":21},{"key":26,"text":142,"correct":28},{"key":30,"text":428,"correct":21},"6",{"id":430,"libraryId":5,"type":9,"typeLabel":15,"stem":431,"options":432,"answer":23,"analysis":32},1275368,"预应力筋存放在室外时不得直接堆放在地面上,必须垫高、覆盖、防腐蚀、防雨露,时间不宜超过( )个月。",[433,434,435,436],{"key":19,"text":142,"correct":21},{"key":23,"text":428,"correct":28},{"key":26,"text":119,"correct":21},{"key":30,"text":121,"correct":21},{"id":438,"libraryId":5,"type":9,"typeLabel":15,"stem":439,"options":440,"answer":30,"analysis":32},1275369,"弯钩平直部分的长度,有抗震要求的结构不得小于箍筋直径的( )倍。",[441,442,443,444],{"key":19,"text":201,"correct":21},{"key":23,"text":363,"correct":21},{"key":26,"text":181,"correct":21},{"key":30,"text":38,"correct":28},{"id":446,"libraryId":5,"type":9,"typeLabel":15,"stem":447,"options":448,"answer":30,"analysis":32},1275370,"弯钩平直部分的长度,一般结构不宜小于箍筋直径的( )倍。",[449,450,451,452],{"key":19,"text":111,"correct":21},{"key":23,"text":142,"correct":21},{"key":26,"text":201,"correct":21},{"key":30,"text":363,"correct":28},{"id":454,"libraryId":5,"type":9,"typeLabel":15,"stem":455,"options":456,"answer":26,"analysis":32},1275371,"箍筋弯钩的弯曲直径应大于被箍主钢筋的直径,B335钢筋不得小于箍筋直径的( )倍。",[457,458,459,460],{"key":19,"text":111,"correct":21},{"key":23,"text":142,"correct":21},{"key":26,"text":201,"correct":28},{"key":30,"text":363,"correct":21},{"id":462,"libraryId":5,"type":9,"typeLabel":15,"stem":463,"options":464,"answer":23,"analysis":32},1275372,"箍筋弯钩的弯曲直径应大于被箍主钢筋的直径,B300钢筋不得小于钢筋直径的( )倍。",[465,466,467,468],{"key":19,"text":111,"correct":21},{"key":23,"text":113,"correct":28},{"key":26,"text":142,"correct":21},{"key":30,"text":469,"correct":21},"3.5",{"id":471,"libraryId":5,"type":9,"typeLabel":15,"stem":472,"options":473,"answer":19,"analysis":32},1275373,"HRB335级、HRB400级钢筋的冷拉率不宜大于( )。",[474,476,478,480],{"key":19,"text":475,"correct":28},"1%",{"key":23,"text":477,"correct":21},"2%",{"key":26,"text":479,"correct":21},"3%",{"key":30,"text":481,"correct":21},"5%",{"id":483,"libraryId":5,"type":9,"typeLabel":15,"stem":484,"options":485,"answer":23,"analysis":32},1275374,"采用冷拉方法调直钢筋时,HPB300级钢筋的冷拉率不宜大于( )。",[486,487,488,489],{"key":19,"text":475,"correct":21},{"key":23,"text":477,"correct":28},{"key":26,"text":479,"correct":21},{"key":30,"text":481,"correct":21},{"id":491,"libraryId":5,"type":9,"typeLabel":15,"stem":492,"options":493,"answer":23,"analysis":32},1275375,"钢筋调直,可用机械或人工调直。经调直后的钢筋不得有局部弯曲、死弯、小波浪形,其表面伤痕不应使钢筋截面减小( )。",[494,495,496,498],{"key":19,"text":479,"correct":21},{"key":23,"text":481,"correct":28},{"key":26,"text":497,"correct":21},"10%",{"key":30,"text":499,"correct":21},"15%",{"id":501,"libraryId":5,"type":9,"typeLabel":15,"stem":502,"options":503,"answer":26,"analysis":32},1275376,"灌注孔桩时,混凝土面的高程应比设计高程高出( )cm左右,灌注完毕后即可抽掉泥浆,挖除桩顶浮浆,但必须留下20cm左右等混凝土完全凝固后再进行凿除,以保证不扰动桩顶混凝土。",[504,506,508,510],{"key":19,"text":505,"correct":21},"60～80",{"key":23,"text":507,"correct":21},"70～90",{"key":26,"text":509,"correct":28},"80～100",{"key":30,"text":511,"correct":21},"90～110",[513,516,519,522,525,528],{"id":9,"name":514,"category":7,"favorite":515},"领导干部任职前廉政法规知识测试题",92,{"id":517,"name":518,"category":7,"favorite":9},595,"建筑结构与设备",{"id":520,"name":521,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":523,"name":524,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":526,"name":527,"category":7,"favorite":8},534,"BIM工程师",{"id":529,"name":527,"category":7,"favorite":8},535]