[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1275463":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1275463,863,2,"多选题","方法控制包括工程项目整个建设周期内所采取的( )等的控制。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","施工技术方案",true,{"key":16,"text":17,"correct":14},"B","工艺流程",{"key":19,"text":20,"correct":14},"C","检测手段",{"key":22,"text":23,"correct":14},"D","施工组织设计",{"key":25,"text":26,"correct":27},"E","施工用料",false,"ABCD","",{"id":6,"name":31,"category":32,"favorite":33},"市政方向-岗位技能","建筑工程",0]