[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1275462":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},1275462,863,2,"多选题","施工准备阶段质量控制主要包括( )。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","建立项目质量控制管理体系和质量保证体系,编制项目质量保证计划",true,{"key":16,"text":17,"correct":14},"B","制订施工现场的各种质量管理制度,完善项目计量及质量检测技术和手段",{"key":19,"text":20,"correct":14},"C","组织设计交底和图纸审核,是施工项目质量控制的重要环节",{"key":22,"text":23,"correct":14},"D","编制施工组织设计,将质量保证计划与施工工艺和施工组织进行融合,是施工项目质量控制的至关重要环节",{"key":25,"text":26,"correct":14},"E","对材料供应商和分包商进行评估和审核","ABCDE","",{"id":6,"name":30,"category":31,"favorite":32},"市政方向-岗位技能","建筑工程",0]