[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1275436":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1275436,863,2,"多选题","分部工程的验收内容包括( )。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","分项工程",true,{"key":16,"text":17,"correct":14},"B","质量控制资料",{"key":19,"text":20,"correct":14},"C","安全和功能检（试）验（检测）报告",{"key":22,"text":23,"correct":14},"D","观感质量验收",{"key":25,"text":26,"correct":27},"E","节能、环保抽样检验结果",false,"ABCD","",{"id":6,"name":31,"category":32,"favorite":33},"市政方向-岗位技能","建筑工程",0]