[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1275405":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1275405,863,1,"单选题","质量策划重点应放在( )的策划,策划过程应与施工方案、施工部署紧密结合。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工程项目实现过程",true,{"key":16,"text":17,"correct":18},"B","工程项目设计",false,{"key":20,"text":21,"correct":18},"C","工程项目控制过程",{"key":23,"text":24,"correct":18},"D","工程筹划过程","",{"id":6,"name":27,"category":28,"favorite":29},"市政方向-岗位技能","建筑工程",0]