[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1275307":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1275307,862,3,"判断题","进度计划的调整是在原进度计划目标已经失去作用或难以实现时方才进行。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"",{"id":6,"name":21,"category":22,"favorite":23},"设备方向-通用基础","建筑工程",0]