[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1275295":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1275295,862,3,"判断题","室内排水系统安装的工艺流程是:孔洞预留、埋件→预制加工→支管安装。立管安装一千管安装→灌水、通球试验→通水试验。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"",{"id":6,"name":21,"category":22,"favorite":23},"设备方向-通用基础","建筑工程",0]