[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1275176":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},1275176,862,2,"多选题","下列选项属于施工方项目管理的任务的是( )。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","施工项目成本控制",true,{"key":16,"text":17,"correct":14},"B","施工项目进度控制",{"key":19,"text":20,"correct":14},"C","施工项目质量控制",{"key":22,"text":23,"correct":14},"D","施工项目合同管理",{"key":25,"text":26,"correct":14},"E","施工项目信息管理","ABCDE","",{"id":6,"name":30,"category":31,"favorite":32},"设备方向-通用基础","建筑工程",0]