[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1275037":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1275037,862,1,"单选题","( )应对环境因素进行控制,制定应急准备和响应措施,并保证信息畅通,预防可能出现非预期的损害,防止环境二次污染。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","业主",false,{"key":16,"text":17,"correct":18},"B","项目经理部",true,{"key":20,"text":21,"correct":14},"C","项目经理",{"key":23,"text":24,"correct":14},"D","施工单位","",{"id":6,"name":27,"category":28,"favorite":29},"设备方向-通用基础","建筑工程",0]