[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1275002":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1275002,862,1,"单选题","变压器安装就位且高低压开关柜安装完成后,应进行( )的连接,将变压器的高压侧与高压开关柜的出线侧连接,低压侧与低压开关柜的进线侧连接。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","一次线",true,{"key":16,"text":17,"correct":18},"B","二次线",false,{"key":20,"text":21,"correct":18},"C","接地线",{"key":23,"text":24,"correct":18},"D","零线","",{"id":6,"name":27,"category":28,"favorite":29},"设备方向-通用基础","建筑工程",0]