[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-861-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":725},{"id":5,"name":6,"category":7,"favorite":8},861,"设备方向-岗位技能","建筑工程",0,5,50,385,[13,38,53,68,83,98,112,126,140,154,169,183,195,209,223,238,251,266,280,294,308,323,338,352,366,380,394,408,422,436,450,462,475,490,505,519,533,547,561,576,590,605,619,633,647,661,675,689,702,714],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1274647,2,"多选题","检验批合格的规定( )。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","主控项目和一般项目的质量经抽检样检验合格",true,{"key":24,"text":25,"correct":22},"B","具有完整的施工操作依据、质量检查记录",{"key":27,"text":28,"correct":29},"C","质量控制质量完整",false,{"key":31,"text":32,"correct":29},"D","单位工程合格",{"key":34,"text":35,"correct":29},"E","照明全负荷实验记录","AB","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1274648,"建筑工程质量验收应划分为( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"分部工程",{"key":24,"text":45,"correct":22},"分项工程",{"key":27,"text":47,"correct":29},"总工程",{"key":31,"text":49,"correct":22},"单位工程",{"key":34,"text":51,"correct":22},"检验批","ABDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1274649,"金属风管的连接形式有哪些( )。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"板材间的咬口连接、焊接",{"key":24,"text":60,"correct":22},"法兰与风管的铆接",{"key":27,"text":62,"correct":22},"法兰加固圈",{"key":31,"text":64,"correct":22},"风管的铆接或焊接连接",{"key":34,"text":66,"correct":29},"板材闾的铆接","ABCD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1274650,"施工员与质量员会同编制的质量交底文件有哪些方面( )。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"设备的外观检查和施工专业的环境条件",{"key":24,"text":75,"correct":22},"盘柜基础型钢制作安装、盘柜的搬运和盘柜的就位",{"key":27,"text":77,"correct":22},"盘柜内二次回电路接线及检查",{"key":31,"text":79,"correct":22},"电气调试和整定",{"key":34,"text":81,"correct":22},"盘柜的受电和送电","ABCDE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1274651,"PP-R热熔管路试压要注意的问题( )。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"系统试压应在最后一个管口连接后降至常温才能试压",{"key":24,"text":90,"correct":22},"实验压力值为告知压力的1.5倍,但不小于0.6MPa",{"key":27,"text":92,"correct":22},"试压时应在实验压力下稳压th,压力降不得超过0.05MPa",{"key":31,"text":94,"correct":29},"在工作压力的1.5倍状态下稳压2h,压力降不得超过0.03MPa",{"key":34,"text":96,"correct":22},"在工作压力的1.15倍状态下稳压2h,压力降不得超过0.03MPa","ABCE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":67,"analysis":37},1274652,"质量交底的形式( )。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"召集作业队组人员会议",{"key":24,"text":105,"correct":22},"交换意见释疑解惑取得对交底内容的认同",{"key":27,"text":107,"correct":22},"书面文件告知方式",{"key":31,"text":109,"correct":22},"进行口头交谈",{"key":34,"text":111,"correct":29},"电话告知",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":82,"analysis":37},1274653,"质量文件的种类( )。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"质量计划和工序质量文件",{"key":24,"text":119,"correct":22},"质量检查计划",{"key":27,"text":121,"correct":22},"质量事故调查报告",{"key":31,"text":123,"correct":22},"质量事故处理报告",{"key":34,"text":125,"correct":22},"数据统计分析质量情况文件",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":82,"analysis":37},1274654,"项目部质量策划应达到哪些( )目的。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"质量策划有效",{"key":24,"text":133,"correct":22},"质量目标有明显的成果",{"key":27,"text":135,"correct":22},"落实责任和编制具有可操控性的质量计划有明显的成果",{"key":31,"text":137,"correct":22},"完善质量管理体系有明显的成果",{"key":34,"text":139,"correct":22},"组织结构有明显的成果",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":36,"analysis":37},1274655,"施工过程发生设计变更信息传递中断而造成质量问题的事件应怎样整改( )。",[144,146,148,150,152],{"key":20,"text":145,"correct":22},"对资料员进行培训,以提高其业务能力和责任心",{"key":24,"text":147,"correct":22},"对项目部质量管理体系文件做评估,补充、修改和完善其不足的部分",{"key":27,"text":149,"correct":29},"调换技术人员",{"key":31,"text":151,"correct":29},"更换应用设备",{"key":34,"text":153,"correct":29},"对施工员进行培训,以提高其业务能力和责任心",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":168,"analysis":37},1274656,"如承重支架抱箍因构造不合理而返工,这样整改的原因是( )因素影响了工程质量。",[158,160,162,164,166],{"key":20,"text":159,"correct":22},"材料或成品",{"key":24,"text":161,"correct":22},"方法",{"key":27,"text":163,"correct":29},"设计",{"key":31,"text":165,"correct":22},"人",{"key":34,"text":167,"correct":29},"技术","ABD",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":182,"analysis":37},1274657,"确定质量控制点的基础( )。",[173,175,177,179,181],{"key":20,"text":174,"correct":22},"按掌握的基础知识,区分各专业的施工工艺流程",{"key":24,"text":176,"correct":22},"熟悉工艺技术规律,熟悉依次作业顺序,能区分可并行工作的作业活动",{"key":27,"text":178,"correct":22},"能进行工序质量控制,明确控制的内容和重点",{"key":31,"text":180,"correct":29},"编制施工组织计划或质量计划",{"key":34,"text":145,"correct":29},"ABC",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":67,"analysis":37},1274658,"施工质量策划的结果是( )。",[187,189,191,193,194],{"key":20,"text":188,"correct":22},"确定质量目标",{"key":24,"text":190,"correct":22},"建立管理组织机构",{"key":27,"text":192,"correct":22},"制定项目部各级部门和人员的职责",{"key":31,"text":180,"correct":22},{"key":34,"text":145,"correct":29},{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":168,"analysis":37},1274659,"风口风量调整的方法有( )。",[199,201,203,205,207],{"key":20,"text":200,"correct":22},"基准风口法",{"key":24,"text":202,"correct":22},"流量等比分配法",{"key":27,"text":204,"correct":29},"流量等量法",{"key":31,"text":206,"correct":22},"逐项分支调整法",{"key":34,"text":208,"correct":29},"开项基准法",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":168,"analysis":37},1274660,"通风机的性能的主要指标包括( )。",[213,215,217,219,221],{"key":20,"text":214,"correct":22},"风压",{"key":24,"text":216,"correct":22},"风量",{"key":27,"text":218,"correct":29},"风速",{"key":31,"text":220,"correct":22},"转速",{"key":34,"text":222,"correct":29},"频率",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":237,"analysis":37},1274661,"施工现场双电源自动切换使用时注意的安全事项( )。一",[227,229,231,233,235],{"key":20,"text":228,"correct":29},"正常电源和备用电源并联运行",{"key":24,"text":230,"correct":22},"正常电源和备用电源电压值保持在相同的水平",{"key":27,"text":232,"correct":22},"两者接人馈电线路时应严格保持相序一致",{"key":31,"text":234,"correct":29},"正常电源和备用电源能并联运行",{"key":34,"text":236,"correct":22},"正常电源和备用电源不能并联运行","BCE",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":36,"analysis":37},1274662,"水力警铃的基本原理( )。",[242,244,246,247,249],{"key":20,"text":243,"correct":22},"一种水力驱动的机械装置",{"key":24,"text":245,"correct":22},"当消防用水的流量不大于一个喷头的流量时,压力水流沿报警支管进入水力警铃驱动叶轮,带动铃锤敲击铃盖,发出报警声响",{"key":27,"text":245,"correct":29},{"key":31,"text":248,"correct":29},"一种电力驱动的机械装置",{"key":34,"text":250,"correct":29},"当消防用水的流量小于一个喷头的流量时,压力水流沿报警支管进入水力警铃驱动叶轮,带动铃锤敲击铃盖,发出报警声响",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":265,"analysis":37},1274663,"湿式报警阀组采取了哪些措施防止误报( )。",[255,257,259,261,263],{"key":20,"text":256,"correct":29},"报警阀内设有平衡管路",{"key":24,"text":258,"correct":22},"在报警阀至警铃的管路上设置延时器",{"key":27,"text":260,"correct":22},"报警阀内没有平衡管路",{"key":31,"text":262,"correct":29},"在报警阀至警铃的管路上设置保护器",{"key":34,"text":264,"correct":29},"主干道管道","BC",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":82,"analysis":37},1274664,"建筑电气工程图的识图步骤( ),",[270,272,274,276,278],{"key":20,"text":271,"correct":22},"阅读施工说明、阅读系统图",{"key":24,"text":273,"correct":22},"阅读平面图",{"key":27,"text":275,"correct":22},"阅读带电气装置的三视图",{"key":31,"text":277,"correct":22},"阅读电路图",{"key":34,"text":279,"correct":22},"阅读接线图和判断施工图的完整性",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":182,"analysis":37},1274665,"建筑电气工程图包含( )。",[284,286,288,290,292],{"key":20,"text":285,"correct":22},"系统图",{"key":24,"text":287,"correct":22},"电路图",{"key":27,"text":289,"correct":22},"平面图",{"key":31,"text":291,"correct":29},"风管系统图",{"key":34,"text":293,"correct":29},"电气图",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":67,"analysis":37},1274666,"给水排水工程图的识读步骤( )。",[298,300,302,304,306],{"key":20,"text":299,"correct":22},"图例符号阅读",{"key":24,"text":301,"correct":22},"轴测图阅读",{"key":27,"text":303,"correct":22},"识读施工图纸的基本方法",{"key":31,"text":305,"correct":22},"用三视图阅读施工图",{"key":34,"text":307,"correct":29},"图纸标志",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":322,"analysis":37},1274667,"防排烟系统包括( )。",[312,314,316,318,320],{"key":20,"text":313,"correct":22},"正压送风系统",{"key":24,"text":315,"correct":29},"正压回风系统",{"key":27,"text":317,"correct":22},"排烟系统",{"key":31,"text":319,"correct":29},"灭火系统",{"key":34,"text":321,"correct":29},"电气系统","AC",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":337,"analysis":37},1274668,"防排烟通风工程调试检测的准备工作包括( )。",[327,329,331,333,335],{"key":20,"text":328,"correct":29},"调试设备准备",{"key":24,"text":330,"correct":22},"调试检测方案准备",{"key":27,"text":332,"correct":22},"人员组织准备",{"key":31,"text":334,"correct":22},"仪器、仪表准备",{"key":34,"text":336,"correct":29},"技术准备","BCD",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":97,"analysis":37},1274669,"综合效果测定中的主要检测项目包括( )。",[342,344,346,348,350],{"key":20,"text":343,"correct":22},"风速分布",{"key":24,"text":345,"correct":22},"温度分布",{"key":27,"text":347,"correct":22},"相对湿度分布",{"key":31,"text":349,"correct":29},"粉尘分布",{"key":34,"text":351,"correct":22},"噪声分布",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":52,"analysis":37},1274670,"ZC-8接地电阻测量仪使用的注意事项( )。",[356,358,360,362,364],{"key":20,"text":357,"correct":22},"接地极、电位探测针、电流探测针三者成一直线,电位探测针居中,三者等距,均为20m",{"key":24,"text":359,"correct":22},"接地极、电位探测针、电流探测针各自引出相同截面的绝缘电线接至仪表上,要一一对应不可错接",{"key":27,"text":361,"correct":29},"ZC-8如测量标度班读数大于1,应仪表放置于水平位置,检查调零",{"key":31,"text":363,"correct":22},"先将倍率标度置于最大倍数,慢转摇把,使零指示器位于中间位置,加快转动速度至120r\u002Fmin",{"key":34,"text":365,"correct":22},"ZC-8如测量标度班读数小于1,应仪表放置于水平位置,检查调零",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":182,"analysis":37},1274671,"接地电阻测定的方法( )。",[370,372,374,376,378],{"key":20,"text":371,"correct":22},"电压电流表法",{"key":24,"text":373,"correct":22},"比率计法",{"key":27,"text":375,"correct":22},"接地电阻测定仪测量法",{"key":31,"text":377,"correct":29},"电压表法",{"key":34,"text":379,"correct":29},"电流表法",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":36,"analysis":37},1274672,"该宿舍楼排水管道工程施工在( )部位做试验检测。",[384,386,388,390,392],{"key":20,"text":385,"correct":22},"雨水排水管道",{"key":24,"text":387,"correct":22},"东西两侧卫生间首层地面下的排水管道",{"key":27,"text":389,"correct":29},"系统内的各支路及主干管的阀门",{"key":31,"text":391,"correct":29},"人口总阀和所有泄水阀门和低处泄水阀门",{"key":34,"text":393,"correct":29},"只需西侧卫生间首层地面下的排水管道",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":82,"analysis":37},1274673,"管道试压的步骤( )。",[398,400,402,404,406],{"key":20,"text":399,"correct":22},"接好试压泵",{"key":24,"text":401,"correct":22},"关闭人口总阀和所有泄水阀门和低处泄水阀门",{"key":27,"text":403,"correct":22},"打开系统内的各支路及主干管的阀门",{"key":31,"text":405,"correct":22},"打开系统内最高处的排气阀门",{"key":34,"text":407,"correct":22},"打开试压用水源阀门,系统充水",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":82,"analysis":37},1274674,"设备安装工程试运行的条件( )。",[412,414,416,418,420],{"key":20,"text":413,"correct":22},"试运行的方案已批准",{"key":24,"text":415,"correct":22},"试运行范围内的工程已按合同约定全部完工,并经自检静态查质量合格",{"key":27,"text":417,"correct":22},"试运行所需的电力、供水、供气均接人到位",{"key":31,"text":419,"correct":22},"试运行涉及的环境、场地已清理",{"key":34,"text":421,"correct":22},"对试运行准备工作进行查检,确认符合方案要求",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":82,"analysis":37},1274675,"按《建筑工程施工质量验收统一标准》GB50300-2001的规定,房屋建筑安装工程的实验以专业可划分为( )。",[426,428,430,432,434],{"key":20,"text":427,"correct":22},"给水与排水工程",{"key":24,"text":429,"correct":22},"建筑电气工程",{"key":27,"text":431,"correct":22},"建筑智能化工程",{"key":31,"text":433,"correct":22},"通风与空调工程",{"key":34,"text":435,"correct":22},"消防工程",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":168,"analysis":37},1274676,"动态考核的特点有( )。",[440,442,444,446,448],{"key":20,"text":441,"correct":22},"动设备受动力驱使而运转",{"key":24,"text":443,"correct":22},"管内有介质按要求而流动",{"key":27,"text":445,"correct":29},"线缆内电流不流通",{"key":31,"text":447,"correct":22},"线缆通电电气装置动作",{"key":34,"text":449,"correct":29},"线缆内电流易于控制",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":265,"analysis":37},1274677,"静态试验的特点有( )。",[454,456,458,459,460],{"key":20,"text":455,"correct":29},"动力设备受动力驱使而运转",{"key":24,"text":457,"correct":22},"管内介质不流动",{"key":27,"text":445,"correct":22},{"key":31,"text":447,"correct":29},{"key":34,"text":461,"correct":29},"动力设备受电力驱使而运转",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":67,"analysis":37},1274678,"从试验状态划分,设备安装工程试验划分为静态试验和动态考核两类,动态考核又分为( )。",[466,468,470,472,474],{"key":20,"text":467,"correct":22},"单机试运转",{"key":24,"text":469,"correct":22},"无负荷试运转",{"key":27,"text":471,"correct":22},"负荷试运转",{"key":31,"text":473,"correct":22},"系统联合试运转",{"key":34,"text":461,"correct":29},{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":489,"analysis":37},1274679,"下列选项符合镀锌钢板外观检查要求的有( )。",[479,481,483,485,487],{"key":20,"text":480,"correct":22},"没有裂纹",{"key":24,"text":482,"correct":29},"必须有水印",{"key":27,"text":484,"correct":29},"有产品出厂证",{"key":31,"text":486,"correct":29},"有质量合格证",{"key":34,"text":488,"correct":22},"没有水印","AE",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":504,"analysis":37},1274680,"下列属于电线进场验收主要内容的有( )。",[494,496,498,500,502],{"key":20,"text":495,"correct":22},"按批查验合格证",{"key":24,"text":497,"correct":29},"紧急情况下,可以不进行电线验收",{"key":27,"text":499,"correct":22},"抽检电线绝缘层完整无损、厚度均匀",{"key":31,"text":501,"correct":22},"按制造标准抽检圆形芯线的线径和绝缘层的厚度",{"key":34,"text":503,"correct":22},"外观检查应包装完好","ACDE",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":67,"analysis":37},1274681,"下列是材料检测报告的必备内容的有( )。",[509,511,513,515,517],{"key":20,"text":510,"correct":22},"报告日期",{"key":24,"text":512,"correct":22},"检测环境条件",{"key":27,"text":514,"correct":22},"依据的技术标准",{"key":31,"text":516,"correct":22},"检测方法标准",{"key":34,"text":518,"correct":29},"检测方法新技术",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":52,"analysis":37},1274682,"材料送检的判定范围( )。",[523,525,527,529,531],{"key":20,"text":524,"correct":22},"国家行政法规规定的涉及结构性安全的材料",{"key":24,"text":526,"correct":22},"技术标准或施工规范的有关条款明确规定的必须送检的材料",{"key":27,"text":528,"correct":29},"监理工程师凭经验判定需送检的材料",{"key":31,"text":530,"correct":22},"验收双方有争议是可有第三方检测机构进行检测",{"key":34,"text":532,"correct":22},"从送检的分类看,可分为强制性检测和争议性检测两种",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":182,"analysis":37},1274683,"设备验收准备的内容包括( )。",[537,539,541,543,545],{"key":20,"text":538,"correct":22},"决定参与验收的人员",{"key":24,"text":540,"correct":22},"收集采购协议或合同、质量标准等技术资料",{"key":27,"text":542,"correct":22},"配备相应的检测和计量工具",{"key":31,"text":544,"correct":29},"准备供货源头资料",{"key":34,"text":546,"correct":29},"项目经理的签字确认",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":36,"analysis":37},1274684,"影响质量因素的4MIE为:人、( )、料、( )、环。",[551,553,555,557,559],{"key":20,"text":552,"correct":22},"机",{"key":24,"text":554,"correct":22},"法",{"key":27,"text":556,"correct":29},"记",{"key":31,"text":558,"correct":29},"思",{"key":34,"text":560,"correct":29},"费用",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":575,"analysis":37},1274685,"室外混凝土排水管道安装的工艺流程为:施工准备、( )、开挖沟槽、铺设基础、( )、管道与检查井等连接、( )、回填土、通水试验。",[565,567,569,571,573],{"key":20,"text":566,"correct":22},"测量放线",{"key":24,"text":568,"correct":22},"管道安装及连接",{"key":27,"text":570,"correct":29},"管道检漏",{"key":31,"text":572,"correct":29},"平整施工现场",{"key":34,"text":574,"correct":22},"灌水试验","ABE",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":489,"analysis":37},1274686,"管理要求编写的目的在于正确执行质量计划,要解决组织、( )、检测、( )等方面的问题。",[580,582,584,586,588],{"key":20,"text":581,"correct":22},"路径",{"key":24,"text":583,"correct":29},"监理",{"key":27,"text":585,"correct":29},"管理",{"key":31,"text":587,"correct":29},"施工",{"key":34,"text":589,"correct":22},"评价",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":604,"analysis":37},1274687,"分项工程质量计划编制步骤有:建立组织、制订计划、( )、按分工进行编写、( )、初审后改进、上级审核批复。",[594,596,598,600,602],{"key":20,"text":595,"correct":29},"确定负责人",{"key":24,"text":597,"correct":29},"跟踪检查",{"key":27,"text":599,"correct":22},"整理资料",{"key":31,"text":601,"correct":22},"编写组内部初审",{"key":34,"text":603,"correct":29},"归纳并分析合同文件","CD",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":182,"analysis":37},1274688,"质量计划的作用( )。",[609,611,613,615,617],{"key":20,"text":610,"correct":22},"对业主作出承诺",{"key":24,"text":612,"correct":22},"组织实施质量计划,并获得预期的效果",{"key":27,"text":614,"correct":22},"审核和评估相关部门或个人的绩效",{"key":31,"text":616,"correct":29},"应对上级的检查",{"key":34,"text":618,"correct":29},"应对监理工程师的检查",{"id":620,"libraryId":5,"type":15,"typeLabel":16,"stem":621,"options":622,"answer":168,"analysis":37},1274689,"质量问题主要形成原因( )。",[623,625,627,629,631],{"key":20,"text":624,"correct":22},"人的意识方面",{"key":24,"text":626,"correct":22},"管理混乱、机制不健全",{"key":27,"text":628,"correct":29},"建筑材料问题",{"key":31,"text":630,"correct":22},"环境条件不符合要求、防护措施不当",{"key":34,"text":632,"correct":29},"技术措施不合理",{"id":634,"libraryId":5,"type":15,"typeLabel":16,"stem":635,"options":636,"answer":82,"analysis":37},1274690,"施工准备的范围包括( )。",[637,639,641,643,645],{"key":20,"text":638,"correct":22},"项目开工后的施工准备",{"key":24,"text":640,"correct":22},"单位工程施工准备",{"key":27,"text":642,"correct":22},"分项工程施工准备",{"key":31,"text":644,"correct":22},"全场性施工准备",{"key":34,"text":646,"correct":22},"项目开工前的施工准备",{"id":648,"libraryId":5,"type":15,"typeLabel":16,"stem":649,"options":650,"answer":337,"analysis":37},1274691,"质量控制包括( )。",[651,653,655,657,659],{"key":20,"text":652,"correct":29},"预算质量控制",{"key":24,"text":654,"correct":22},"事前质量控制",{"key":27,"text":656,"correct":22},"事中质量控制",{"key":31,"text":658,"correct":22},"事后质量控制",{"key":34,"text":660,"correct":29},"计划质量控制",{"id":662,"libraryId":5,"type":15,"typeLabel":16,"stem":663,"options":664,"answer":504,"analysis":37},1274692,"方法控制包含( )。",[665,667,669,671,673],{"key":20,"text":666,"correct":22},"施工组织设计",{"key":24,"text":668,"correct":29},"施工计划",{"key":27,"text":670,"correct":22},"施工工艺",{"key":31,"text":672,"correct":22},"施工技术措施",{"key":34,"text":674,"correct":22},"施工方案",{"id":676,"libraryId":5,"type":15,"typeLabel":16,"stem":677,"options":678,"answer":168,"analysis":37},1274693,"注意计划在执行的修正,修正的起因有( )。",[679,681,683,685,687],{"key":20,"text":680,"correct":22},"工程的变更",{"key":24,"text":682,"correct":22},"承包合同的修订",{"key":27,"text":684,"correct":29},"施工图纸的修改",{"key":31,"text":686,"correct":22},"人员或物资的调整",{"key":34,"text":688,"correct":29},"现场情况调查资料",{"id":690,"libraryId":5,"type":15,"typeLabel":16,"stem":691,"options":692,"answer":67,"analysis":37},1274694,"施工组织设计编制的主要内容有( )。",[693,695,697,699,701],{"key":20,"text":694,"correct":22},"工程概况",{"key":24,"text":696,"correct":22},"施工部署",{"key":27,"text":698,"correct":22},"说明各项技术经济指标",{"key":31,"text":700,"correct":22},"施工准备计划",{"key":34,"text":688,"correct":29},{"id":703,"libraryId":5,"type":15,"typeLabel":16,"stem":704,"options":705,"answer":504,"analysis":37},1274695,"质量计划编制依据是( )。",[706,708,709,711,713],{"key":20,"text":707,"correct":22},"工程施工合同及相关的协议",{"key":24,"text":674,"correct":29},{"key":27,"text":710,"correct":22},"已批准的初步设计及有关的图纸资料",{"key":31,"text":712,"correct":22},"工程概算和主要工程量",{"key":34,"text":688,"correct":22},{"id":715,"libraryId":5,"type":15,"typeLabel":16,"stem":716,"options":717,"answer":168,"analysis":37},1274696,"施工组织计划的类型有( )。",[718,720,721,722,723],{"key":20,"text":719,"correct":22},"施工组织总设计",{"key":24,"text":666,"correct":22},{"key":27,"text":668,"correct":29},{"key":31,"text":674,"correct":22},{"key":34,"text":724,"correct":29},"施工进度方案",[726,730,733,736,739,742],{"id":727,"name":728,"category":7,"favorite":729},1,"领导干部任职前廉政法规知识测试题",92,{"id":731,"name":732,"category":7,"favorite":727},595,"建筑结构与设备",{"id":734,"name":735,"category":7,"favorite":727},715,"招标采购专业知识与法律法规",{"id":737,"name":738,"category":7,"favorite":727},848,"市政方向-通用基础",{"id":740,"name":741,"category":7,"favorite":8},534,"BIM工程师",{"id":743,"name":741,"category":7,"favorite":8},535]