[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-861-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":609},{"id":5,"name":6,"category":7,"favorite":8},861,"设备方向-岗位技能","建筑工程",0,4,50,385,[13,34,42,54,66,78,90,105,117,128,137,149,158,170,184,196,207,219,231,243,254,264,276,287,299,311,319,327,337,349,359,367,375,383,391,399,407,419,431,448,463,478,493,508,523,537,551,566,580,595],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1274597,1,"单选题","现行的《通风与空调工程施工质量验收规范》GB50243-2002要求防排烟系统柔性短管的制作材料必须为( )。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","可燃材料",false,{"key":24,"text":25,"correct":26},"B","不燃材料",true,{"key":28,"text":29,"correct":22},"C","非易燃材料",{"key":31,"text":32,"correct":22},"D","耐热材料","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1274598,"现行的《通风与空调工程施工质量验收规范》GB50243-2002要求防火风管、框架与固定材料、密封垫料必须为( )。",[38,39,40,41],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":22},{"key":31,"text":32,"correct":22},{"id":43,"libraryId":5,"type":15,"typeLabel":16,"stem":44,"options":45,"answer":20,"analysis":33},1274599,"现行的《建筑电气工程施工质量验收规范》GB50303-2002要求当钢管做（吊灯）灯杆时,钢管内径不小于( )mm,管壁厚度不小于( )mm。",[46,48,50,52],{"key":20,"text":47,"correct":26},"10,1.5",{"key":24,"text":49,"correct":22},"10,2",{"key":28,"text":51,"correct":22},"20,1.5",{"key":31,"text":53,"correct":22},"20,2",{"id":55,"libraryId":5,"type":15,"typeLabel":16,"stem":56,"options":57,"answer":20,"analysis":33},1274600,"现行的《建筑电气工程施工质量验收规范》GB50303-2002要求对低压0.4kV及以下线路的绝缘测定包含绝缘电阻测定和( )。",[58,60,62,64],{"key":20,"text":59,"correct":26},"耐压试验",{"key":24,"text":61,"correct":22},"耐高温实验",{"key":28,"text":63,"correct":22},"燃烧实验",{"key":31,"text":65,"correct":22},"通电实验",{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":31,"analysis":33},1274601,"现行的《建筑电气工程施工质量验收规范》GB50303-2002要求对民用住宅的照明通电试运行时间为( )h。",[70,72,74,76],{"key":20,"text":71,"correct":22},"5",{"key":24,"text":73,"correct":22},"6",{"key":28,"text":75,"correct":22},"7",{"key":31,"text":77,"correct":26},"8",{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":24,"analysis":33},1274602,"现行的《建筑电气工程施工质量验收规范》GB50303-2002要求对公用建筑的照明通电试运行时间为( )h,",[82,84,86,88],{"key":20,"text":83,"correct":22},"12",{"key":24,"text":85,"correct":26},"24",{"key":28,"text":87,"correct":22},"36",{"key":31,"text":89,"correct":22},"72",{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":28,"analysis":33},1274603,"现行的《建筑电气工程施工质量验收规范》GB50303-2002要求建筑物景观照明灯具应符合的条件中不包含的是( )。",[94,96,98,100,102],{"key":20,"text":95,"correct":22},"每套灯具的导电部分对地绝缘电阻大于2MΩ",{"key":24,"text":97,"correct":22},"在人行道等人员往来密集场所安装的落地式灯具,无围栏防护,安装高度距地面",{"key":28,"text":99,"correct":26},"5m以上",{"key":31,"text":101,"correct":22},"建筑物景观照明灯具间隔不小于1m",{"key":103,"text":104,"correct":22},"E","金属构架和灯具的可接近裸露导体及金属软管的接地(PE)或接零(PEN)可靠,且有标识",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":28,"analysis":33},1274604,"现行的《建筑电气工程施工质量验收规范》GB50303-2002要求当灯具距地面高度小于( )m时,灯具的可接近裸露导体必须接地(PE)或接零(PEN)可靠,并应有专用接地螺栓,且有标识。",[109,111,113,115],{"key":20,"text":110,"correct":22},"2.2",{"key":24,"text":112,"correct":22},"2.3",{"key":28,"text":114,"correct":26},"2.4",{"key":31,"text":116,"correct":22},"2.5",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":20,"analysis":33},1274605,"现行的《建筑电气工程施工质量验收规范》GB50303-2002要求镀锌和壁厚不大于( )mm的钢导管不得套管熔焊连接。",[121,123,125,127],{"key":20,"text":122,"correct":26},"2",{"key":24,"text":124,"correct":22},"3",{"key":28,"text":126,"correct":22},"4",{"key":31,"text":71,"correct":22},{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":24,"analysis":33},1274606,"现行的《建筑电气工程施工质量验收规范》GB50303-2002要求金属电缆桥架及其支架全长应不少于( )处与接地(PE)或接零(PEN)干线相连接。",[132,134,135,136],{"key":20,"text":133,"correct":22},"1",{"key":24,"text":122,"correct":26},{"key":28,"text":124,"correct":22},{"key":31,"text":126,"correct":22},{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":28,"analysis":33},1274607,"建筑给水排水及采暖工程施工质量检测要求地漏水封高度不小于( )mm。",[141,143,145,147],{"key":20,"text":142,"correct":22},"30",{"key":24,"text":144,"correct":22},"40",{"key":28,"text":146,"correct":26},"50",{"key":31,"text":148,"correct":22},"55",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":24,"analysis":33},1274608,"建筑给水排水及采暖工程施工质量检测要求排水塑料管的伸缩节间距如设计未做规定,应为( )m。",[153,154,155,156],{"key":20,"text":124,"correct":22},{"key":24,"text":126,"correct":26},{"key":28,"text":71,"correct":22},{"key":31,"text":157,"correct":22},"5.5",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":24,"analysis":33},1274609,"建筑给水排水及采暖工程施工质量检测项目中应做排水立管及水平干管的( )。",[162,164,166,168],{"key":20,"text":163,"correct":22},"通水试验",{"key":24,"text":165,"correct":26},"通球试验",{"key":28,"text":167,"correct":22},"满水试验",{"key":31,"text":169,"correct":22},"灌水实验",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":20,"analysis":33},1274610,"建筑给水排水及采暖工程施工质量检测中应检测管道滑动支架,滑托与滑槽两侧",[174,176,178,180,182],{"key":20,"text":175,"correct":26},"留有____mm的间隙。",{"key":24,"text":177,"correct":22},"3～5",{"key":28,"text":179,"correct":22},"4～6",{"key":31,"text":181,"correct":22},"5～7",{"key":103,"text":183,"correct":22},"3～6",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":24,"analysis":33},1274611,"现行的《建筑给水排水及采暖工程施工质量验收规范》GB50242-2002中要求各种承压管道系统和设备应做( ),非承压管道系统和设备应做( )。",[188,190,192,194],{"key":20,"text":189,"correct":22},"水压实验,满水实验",{"key":24,"text":191,"correct":26},"水压实验,灌水实验",{"key":28,"text":193,"correct":22},"满水实验,灌水实验",{"key":31,"text":195,"correct":22},"灌水实验,满水实验",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":28,"analysis":33},1274612,"现行的《建筑给水排水及采暖工程施工质量验收规范》GB50242-2002中要求盘管隐蔽前必须进行( )。",[200,202,203,205],{"key":20,"text":201,"correct":22},"满水实验",{"key":24,"text":169,"correct":22},{"key":28,"text":204,"correct":26},"水压实验",{"key":31,"text":206,"correct":22},"注水实验",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":20,"analysis":33},1274613,"现行的《建筑给水排水及采暖工程施工质量验收规范》GB50242-2002中要求地下室或地下构筑物外墙有管道穿过的,应采取防水措施。对有严格防水要求的建筑物,( )。",[211,213,215,217],{"key":20,"text":212,"correct":26},"必须采用柔性防水套管",{"key":24,"text":214,"correct":22},"必须采用刚性防水套管",{"key":28,"text":216,"correct":22},"刚性、柔性防水套管均可使用",{"key":31,"text":218,"correct":22},"可以不使用套管",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":24,"analysis":33},1274614,"建设工程施工质量验收统一标准是统一建筑工程质量的验收方法、程序和( )。",[223,225,227,229],{"key":20,"text":224,"correct":22},"技术指标",{"key":24,"text":226,"correct":26},"质量指标",{"key":28,"text":228,"correct":22},"检验指标",{"key":31,"text":230,"correct":22},"施工指标",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":28,"analysis":33},1274615,"计量器具的专业人员的职责是正确应用法定计量单位和( )。",[235,237,239,241],{"key":20,"text":236,"correct":22},"正确保管计量器具",{"key":24,"text":238,"correct":22},"检验校核计量器具",{"key":28,"text":240,"correct":26},"确保各类计量器具在有效期内使用",{"key":31,"text":242,"correct":22},"维修计量器具",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":24,"analysis":33},1274616,"计量检定必须按照国家计量检定系统表进行即按照《计量法》第( )条。",[247,249,251,253],{"key":20,"text":248,"correct":22},"9",{"key":24,"text":250,"correct":26},"10",{"key":28,"text":252,"correct":22},"11",{"key":31,"text":83,"correct":22},{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":28,"analysis":33},1274617,"长度的单位中1海里约为( )km。",[258,260,262,263],{"key":20,"text":259,"correct":22},"1.5",{"key":24,"text":261,"correct":22},"1.852",{"key":28,"text":122,"correct":26},{"key":31,"text":116,"correct":22},{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":28,"analysis":33},1274618,"功率的单位中1马力约为( )W。",[268,270,272,274],{"key":20,"text":269,"correct":22},"366",{"key":24,"text":271,"correct":22},"500",{"key":28,"text":273,"correct":26},"736",{"key":31,"text":275,"correct":22},"800",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":20,"analysis":33},1274619,"国际单位制中电流的单位为( )。",[280,281,283,285],{"key":20,"text":20,"correct":26},{"key":24,"text":282,"correct":22},"kA",{"key":28,"text":284,"correct":22},"mA",{"key":31,"text":286,"correct":22},"uA",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":24,"analysis":33},1274620,"国际单位制中时间的单位为( )。",[291,293,295,297],{"key":20,"text":292,"correct":22},"min",{"key":24,"text":294,"correct":26},"s",{"key":28,"text":296,"correct":22},"h",{"key":31,"text":298,"correct":22},"d",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":24,"analysis":33},1274621,"速度单位中1马赫近似为( )m\u002Fs。",[303,305,307,309],{"key":20,"text":304,"correct":22},"240",{"key":24,"text":306,"correct":26},"340",{"key":28,"text":308,"correct":22},"540",{"key":31,"text":310,"correct":22},"600",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":28,"analysis":33},1274622,"消防工程中对于按照国家工程建设消防技术标准进行的消防设计,建设单位应当自依法取得施工许可之日起( )个工作日内,将消防设计文件报公安机关消防机构备案。",[315,316,317,318],{"key":20,"text":124,"correct":22},{"key":24,"text":71,"correct":22},{"key":28,"text":75,"correct":26},{"key":31,"text":250,"correct":22},{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":28,"analysis":33},1274623,"特种设备监督检验合格后,监督检验单位应按规定的期限出具监督检验报告,监督检验报告应包含( )项监督检验报告的内容和结论。",[323,324,325,326],{"key":20,"text":133,"correct":22},{"key":24,"text":122,"correct":22},{"key":28,"text":124,"correct":26},{"key":31,"text":126,"correct":22},{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":31,"analysis":33},1274624,"特种设备经过安装、改造、维修竣工后,安装、改造,维修的施工单位应当在验收后( )日内将有关技术资料移交使用单位,高耗能特种设备还应按照安全技术规范的要求提交能效测试报告。",[331,332,334,336],{"key":20,"text":250,"correct":22},{"key":24,"text":333,"correct":22},"15",{"key":28,"text":335,"correct":22},"20",{"key":31,"text":142,"correct":26},{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":20,"analysis":33},1274625,"特种设备中的压力容器的压力范围是最高工作压力不小于( )Mpa。",[341,343,345,347],{"key":20,"text":342,"correct":26},"0.1",{"key":24,"text":344,"correct":22},"0.3",{"key":28,"text":346,"correct":22},"0.5",{"key":31,"text":348,"correct":22},"0.7",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":20,"analysis":33},1274626,"特种设备中升降机的最大额定起重量为( )t。",[353,354,356,357],{"key":20,"text":346,"correct":26},{"key":24,"text":355,"correct":22},"1.0",{"key":28,"text":259,"correct":22},{"key":31,"text":358,"correct":22},"2.0",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":20,"analysis":33},1274627,"特种设备中的压力管道的压力范围是最高工作压力不大于( )Mpa。",[363,364,365,366],{"key":20,"text":342,"correct":26},{"key":24,"text":344,"correct":22},{"key":28,"text":346,"correct":22},{"key":31,"text":348,"correct":22},{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":24,"analysis":33},1274628,"在正常使用情况下,装修工程的最低保修期限为( )年。",[371,372,373,374],{"key":20,"text":133,"correct":22},{"key":24,"text":122,"correct":26},{"key":28,"text":71,"correct":22},{"key":31,"text":75,"correct":22},{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":24,"analysis":33},1274629,"在正常使用情况下,电气管线、给水排水管道、设备安装的最低保修期限为( )年。",[379,380,381,382],{"key":20,"text":133,"correct":22},{"key":24,"text":122,"correct":26},{"key":28,"text":71,"correct":22},{"key":31,"text":75,"correct":22},{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":24,"analysis":33},1274630,"在正常使用情况下,屋面防水工程,有防水要求的卫生间、房间和外墙面的防渗漏的最低保修期限为( )年。",[387,388,389,390],{"key":20,"text":133,"correct":22},{"key":24,"text":71,"correct":26},{"key":28,"text":75,"correct":22},{"key":31,"text":250,"correct":22},{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":20,"analysis":33},1274631,"工程质量监督机构应在工程竣工验收之日起( )日内,向备案机关提交工程质量监督报告。",[395,396,397,398],{"key":20,"text":71,"correct":26},{"key":24,"text":250,"correct":22},{"key":28,"text":333,"correct":22},{"key":31,"text":335,"correct":22},{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":28,"analysis":33},1274632,"备案机关发现建设单位在竣工验收过程中有违反国家有关建设工程质量管理规定行为的,应在收讫竣工验收备案文件( )日内,责令停止使用,重新组织竣工验收。",[403,404,405,406],{"key":20,"text":71,"correct":22},{"key":24,"text":250,"correct":22},{"key":28,"text":333,"correct":26},{"key":31,"text":335,"correct":22},{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":28,"analysis":33},1274633,"施工单位违反工程建设强制标准,责令改正,处工程合同款( )以上( )以下的罚款。",[411,413,415,417],{"key":20,"text":412,"correct":22},"3％,5％",{"key":24,"text":414,"correct":22},"1％,4%",{"key":28,"text":416,"correct":26},"2%,4％",{"key":31,"text":418,"correct":22},"2%,5%",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":24,"analysis":33},1274634,"工程建设中拟采用的“四新”包括新技术、新工艺、新材料和( )。",[423,425,427,429],{"key":20,"text":424,"correct":22},"新标准",{"key":24,"text":426,"correct":26},"新设备",{"key":28,"text":428,"correct":22},"新定义",{"key":31,"text":430,"correct":22},"新含义",{"id":432,"libraryId":5,"type":433,"typeLabel":434,"stem":435,"options":436,"answer":447,"analysis":33},1274635,2,"多选题","查检穿过封闭防火墙体风管套管封堵材料的不燃性能的原因( )。",[437,439,441,443,445],{"key":20,"text":438,"correct":26},"强制性条文规定的内容",{"key":24,"text":440,"correct":26},"可预漏电引发触电事故",{"key":28,"text":442,"correct":22},"可起防火隔堵作用",{"key":31,"text":444,"correct":22},"防止运行中或检修时发生人身安全事故",{"key":103,"text":446,"correct":26},"施工方进一步承诺承担质量责任","ABE",{"id":449,"libraryId":5,"type":433,"typeLabel":434,"stem":450,"options":451,"answer":462,"analysis":33},1274636,"对形成的资料进行鉴别是档案管理工作的重要内容之一,鉴别工作内容主要有( )。",[452,454,456,458,460],{"key":20,"text":453,"correct":26},"资料的完整性",{"key":24,"text":455,"correct":26},"资料的准确性",{"key":28,"text":457,"correct":26},"资料的属性",{"key":31,"text":459,"correct":22},"资料的准备情况",{"key":103,"text":461,"correct":26},"保管期限","ABCE",{"id":464,"libraryId":5,"type":433,"typeLabel":434,"stem":465,"options":466,"answer":477,"analysis":33},1274637,"质量资料的基本要求包括( )。",[467,469,471,473,475],{"key":20,"text":468,"correct":26},"符合性要求",{"key":24,"text":470,"correct":26},"真实性要求",{"key":28,"text":472,"correct":26},"准确性要求",{"key":31,"text":474,"correct":26},"及时性要求",{"key":103,"text":476,"correct":26},"规范化要求","ABCDE",{"id":479,"libraryId":5,"type":433,"typeLabel":434,"stem":480,"options":481,"answer":492,"analysis":33},1274638,"喷淋干管为卡箍式连接,属于柔性连接,柔性连接口是管道振动发生泄漏的薄弱环节,所以每个接口处至少有1个支架进行刚性固定,其目的( )。",[482,484,486,488,490],{"key":20,"text":483,"correct":26},"最大限度地减小接口处的振幅",{"key":24,"text":485,"correct":26},"保护运行中的安全",{"key":28,"text":487,"correct":22},"减少管道的泄漏",{"key":31,"text":489,"correct":22},"平衡管道受力",{"key":103,"text":491,"correct":22},"避免管道振动","AB",{"id":494,"libraryId":5,"type":433,"typeLabel":434,"stem":495,"options":496,"answer":507,"analysis":33},1274639,"风管的出风口在走廊、大厅等公共场所要与建筑装修设计和谐协调。为什么( )。",[497,499,501,503,505],{"key":20,"text":498,"correct":26},"风口必须与建筑装修的效果向协调",{"key":24,"text":500,"correct":22},"要与其他专业装在一起的部件相互协调",{"key":28,"text":502,"correct":26},"风口依靠其他设备工作",{"key":31,"text":504,"correct":22},"有利于风口的装饰效果",{"key":103,"text":506,"correct":26},"有利于总体的装饰效果","ACE",{"id":509,"libraryId":5,"type":433,"typeLabel":434,"stem":510,"options":511,"answer":522,"analysis":33},1274640,"链吊日光灯发生污染的原因是( )。",[512,514,516,518,520],{"key":20,"text":513,"correct":26},"施工程序安排失当",{"key":24,"text":515,"correct":22},"链吊日光灯质量差",{"key":28,"text":517,"correct":26},"成品保护意识不强",{"key":31,"text":519,"correct":22},"土建材料质量太差",{"key":103,"text":521,"correct":22},"使用不规范","AC",{"id":524,"libraryId":5,"type":433,"typeLabel":434,"stem":525,"options":526,"answer":477,"analysis":33},1274641,"质量事故调查处理程序是( )。",[527,529,531,533,535],{"key":20,"text":528,"correct":26},"事故报告",{"key":24,"text":530,"correct":26},"现场保护",{"key":28,"text":532,"correct":26},"事故调查",{"key":31,"text":534,"correct":26},"形成事故处理报告",{"key":103,"text":536,"correct":26},"编写事故调查报告",{"id":538,"libraryId":5,"type":433,"typeLabel":434,"stem":539,"options":540,"answer":477,"analysis":33},1274642,"质量员要基本掌握( )的施工质量验收规范的主要条款,尤其要掌握其中的强制条款。",[541,543,545,547,549],{"key":20,"text":542,"correct":26},"给水排水工程",{"key":24,"text":544,"correct":26},"建筑电气工程",{"key":28,"text":546,"correct":26},"建筑智能化工程",{"key":31,"text":548,"correct":26},"自动喷水灭火工程",{"key":103,"text":550,"correct":26},"通风与空调工程",{"id":552,"libraryId":5,"type":433,"typeLabel":434,"stem":553,"options":554,"answer":565,"analysis":33},1274643,"在管理方面,造成质量问题的主要原因( )。",[555,557,559,561,563],{"key":20,"text":556,"correct":26},"缺乏质量意识",{"key":24,"text":558,"correct":26},"管理混乱",{"key":28,"text":560,"correct":26},"施工准备不充分",{"key":31,"text":562,"correct":26},"缺少监督机制",{"key":103,"text":564,"correct":22},"环境因素","ABCD",{"id":567,"libraryId":5,"type":433,"typeLabel":434,"stem":568,"options":569,"answer":565,"analysis":33},1274644,"工程资料记录的基本要求是( )。",[570,572,574,576,578],{"key":20,"text":571,"correct":26},"真实、准确、完整、齐全、有可追溯性",{"key":24,"text":573,"correct":26},"能反映工程实体的面貌,要求及时形成,与工程进度同步填写",{"key":28,"text":575,"correct":26},"可以回忆记录",{"key":31,"text":577,"correct":26},"签字人员应是实际作业或管理人员,不能代签",{"key":103,"text":579,"correct":22},"必需由项目部经理签字",{"id":581,"libraryId":5,"type":433,"typeLabel":434,"stem":582,"options":583,"answer":594,"analysis":33},1274645,"在安全和功能检验记录方面,给水排水与采暖工程包括( )。",[584,586,588,590,592],{"key":20,"text":585,"correct":26},"给水管道通水试验记录",{"key":24,"text":587,"correct":26},"卫生器具满水试验记录",{"key":28,"text":589,"correct":22},"照明全负荷试验记录",{"key":31,"text":591,"correct":26},"排水干管通球试验记录",{"key":103,"text":593,"correct":22},"系统及电源检查报告","ABD",{"id":596,"libraryId":5,"type":433,"typeLabel":434,"stem":597,"options":598,"answer":608,"analysis":33},1274646,"在观感制冷检查要点方面,建筑智能化工程包括( )。",[599,601,602,604,606],{"key":20,"text":600,"correct":22},"系统试运行记录",{"key":24,"text":593,"correct":22},{"key":28,"text":603,"correct":26},"机房设备安装及布局",{"key":31,"text":605,"correct":26},"现场设备安装",{"key":103,"text":607,"correct":22},"照明全负荷实验记录","CD",[610,613,616,619,622,625],{"id":15,"name":611,"category":7,"favorite":612},"领导干部任职前廉政法规知识测试题",92,{"id":614,"name":615,"category":7,"favorite":15},595,"建筑结构与设备",{"id":617,"name":618,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":620,"name":621,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":623,"name":624,"category":7,"favorite":8},534,"BIM工程师",{"id":626,"name":624,"category":7,"favorite":8},535]