[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-861-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":575},{"id":5,"name":6,"category":7,"favorite":8},861,"设备方向-岗位技能","建筑工程",0,3,50,385,[13,34,46,58,70,78,86,98,110,122,134,146,158,170,182,192,204,216,228,240,248,257,269,277,285,297,309,318,330,338,350,362,374,385,397,409,420,431,443,455,463,475,487,499,508,518,529,541,553,565],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1274547,1,"单选题","质量问题的识别通常有以下( )环节。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","标准测量化,度量,比较,判定",false,{"key":24,"text":25,"correct":26},"B","标准具体化,度量,比较,判定",true,{"key":28,"text":29,"correct":22},"C","标准测量化,度量,校核,判定",{"key":31,"text":32,"correct":22},"D","标准具体化,度量,校核,判定","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1274548,"停止点的概念中,所有的( ),本质上是施工过程中的某一个工序。",[38,40,42,44],{"key":20,"text":39,"correct":22},"开工点、检查点、停止点等点的称谓",{"key":24,"text":41,"correct":26},"控制点、检查点、停止点等点的称谓",{"key":28,"text":43,"correct":22},"控制点、检查点、结束点等点的称谓",{"key":31,"text":45,"correct":22},"控制点、审核点、停止点等点的称谓",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1274549,"建筑安装工程施工工程质量检查实行三检制,是指( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"作业人员的自检和专职质量员的专检、互检相结合的检查制度",{"key":24,"text":53,"correct":26},"作业人员的自检、互检和专职质量员的专检相结合的检查制度",{"key":28,"text":55,"correct":22},"作业人员的互检、专检和专职质量员的自检相结合的检查制度",{"key":31,"text":57,"correct":22},"作业人员的自检、互检和专检相结合的检查制度",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1274550,"每一个质量控制具体方法本身也有一个持续改进的问题,就要用( )循环原理,在实践中使质量控制得到不断提高。",[62,64,66,68],{"key":20,"text":63,"correct":22},"看、摸、敲、照四个字",{"key":24,"text":65,"correct":22},"目测法、实测法和试验法三种",{"key":28,"text":67,"correct":22},"靠、吊、量、套四个字",{"key":31,"text":69,"correct":26},"计划、实施、检查和改进",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1274551,"现场进行质量检查的方法有( )。",[74,75,76,77],{"key":20,"text":63,"correct":22},{"key":24,"text":65,"correct":26},{"key":28,"text":67,"correct":22},{"key":31,"text":69,"correct":22},{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":20,"analysis":33},1274552,"目测法手段可归纳为( )。",[82,83,84,85],{"key":20,"text":63,"correct":26},{"key":24,"text":65,"correct":22},{"key":28,"text":67,"correct":22},{"key":31,"text":69,"correct":22},{"id":87,"libraryId":5,"type":15,"typeLabel":16,"stem":88,"options":89,"answer":31,"analysis":33},1274553,"施工项目质量控制主要的方法不包含( )。",[90,92,94,96],{"key":20,"text":91,"correct":22},"审核有关技术文件和报告",{"key":24,"text":93,"correct":22},"直接进行现场检查",{"key":28,"text":95,"correct":22},"必要的试验",{"key":31,"text":97,"correct":26},"开工前检查",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":20,"analysis":33},1274554,"不属于事中质量控制的具体措施是( )。",[102,104,106,108],{"key":20,"text":103,"correct":26},"控制施工有重点",{"key":24,"text":105,"correct":22},"质量处理有复查",{"key":28,"text":107,"correct":22},"材料代换有制度",{"key":31,"text":109,"correct":22},"设计变更有手续",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":31,"analysis":33},1274555,"不属于施工准备的内容( )。",[114,116,118,120],{"key":20,"text":115,"correct":22},"技术准备",{"key":24,"text":117,"correct":22},"物资准备",{"key":28,"text":119,"correct":22},"组织准备",{"key":31,"text":121,"correct":26},"分项工程施工准备",{"id":123,"libraryId":5,"type":15,"typeLabel":16,"stem":124,"options":125,"answer":20,"analysis":33},1274556,"影响工程质量的环境因素较多,有( )。",[126,128,130,132],{"key":20,"text":127,"correct":26},"工程技术环境、工程管理环境和劳动环境",{"key":24,"text":129,"correct":22},"工程技术环境、工程管理环境和作业环境",{"key":28,"text":131,"correct":22},"工程施工环境、工程管理环境和劳动环境",{"key":31,"text":133,"correct":22},"工程施工技术环境、工程管理环境和作业环境",{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":24,"analysis":33},1274557,"影响工程质量控制的因素主要有( )。",[138,140,142,144],{"key":20,"text":139,"correct":22},"施工人员、施工用机械和施工用材料",{"key":24,"text":141,"correct":26},"施工人员、施工用机械、施工的材料、施工的方法和施工作业环境",{"key":28,"text":143,"correct":22},"施工用机械、施工用材料、施工的方法和施工作业环境",{"key":31,"text":145,"correct":22},"施工人员、施工用机械、施工用材料和施工作业环境",{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":28,"analysis":33},1274558,"监督检查要有重点是( )。",[150,152,154,156],{"key":20,"text":151,"correct":22},"指施工的关键部位、作业的特殊工序、计划方案问题发生几率大的方向",{"key":24,"text":153,"correct":22},"指工程的关键部位、作业的特殊工序、计划方案问题发生几率大的方向",{"key":28,"text":155,"correct":26},"指工程的关键部位、作业的特殊工序、质量问题发生几率大的方向",{"key":31,"text":157,"correct":22},"指施工的关键部位、作业的特殊工序、质量问题发生几率大的方向",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":20,"analysis":33},1274559,"执行计划要职责分工,各负其责。执行前要( )。",[162,164,166,168],{"key":20,"text":163,"correct":26},"宣传、交底、取得共同的理解和认同",{"key":24,"text":165,"correct":22},"宣传、交底、取得共同的认识和认同",{"key":28,"text":167,"correct":22},"宣传、分工、取得共同的理解和认同",{"key":31,"text":169,"correct":22},"宣传、分工、取得共同的认识和认同",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":20,"analysis":33},1274560,"质量计划编制的主要内容,主要的施工方案不包括( )。",[174,176,178,180],{"key":20,"text":175,"correct":26},"主要主项工程施工工艺及工序的确定,样板区的选定",{"key":24,"text":177,"correct":22},"主要的施工机械的选配",{"key":28,"text":179,"correct":22},"季节性施工的步骤和防台防雨措施",{"key":31,"text":181,"correct":22},"构件配件的加工订货或自行制作的选定",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":31,"analysis":33},1274561,"质量计划编制的主要内容,施工准备计划不包括( )。",[186,187,188,190],{"key":20,"text":115,"correct":22},{"key":24,"text":117,"correct":22},{"key":28,"text":189,"correct":22},"劳动组织准备",{"key":31,"text":191,"correct":26},"施工方案准备",{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":28,"analysis":33},1274562,"质量计划编制的主要内容,施工部署不包括( )。",[196,198,200,202],{"key":20,"text":197,"correct":22},"确定施工进度计划、质量和安全目标",{"key":24,"text":199,"correct":22},"确定环境保护和降低施工成本措施",{"key":28,"text":201,"correct":26},"加快事故进度",{"key":31,"text":203,"correct":22},"确定施工顺序和施工组织管理体系",{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":31,"analysis":33},1274563,"质量计划编制的主要内容,确定各项管理体系的流程和措施不包括( )。",[208,210,212,214],{"key":20,"text":209,"correct":22},"员工培训措施",{"key":24,"text":211,"correct":22},"技术措施",{"key":28,"text":213,"correct":22},"组织措施",{"key":31,"text":215,"correct":26},"质量保证措施和安全施工措施",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":31,"analysis":33},1274564,"不属于质量计划编制依据( )。",[220,222,224,226],{"key":20,"text":221,"correct":22},"设备清单及主要材料或大宗材料清单",{"key":24,"text":223,"correct":22},"现场情况调查资料",{"key":28,"text":225,"correct":22},"新材料、新工艺的使用说明或试验资料",{"key":31,"text":227,"correct":26},"施工方案",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":20,"analysis":33},1274565,"施工方案以( )为对象。",[232,234,236,238],{"key":20,"text":233,"correct":26},"技术难度较大、采用新工艺或新材料的分部或分项工程",{"key":24,"text":235,"correct":22},"有多个单位工程组成的项目",{"key":28,"text":237,"correct":22},"单位工程",{"key":31,"text":239,"correct":22},"两个以上五个以下单位工程组成的项目",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":28,"analysis":33},1274566,"施工组织设计以( )为对象。",[244,245,246,247],{"key":20,"text":233,"correct":22},{"key":24,"text":235,"correct":22},{"key":28,"text":237,"correct":26},{"key":31,"text":239,"correct":22},{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":24,"analysis":33},1274567,"施工组织总设计以( )为对象。",[252,254,255,256],{"key":20,"text":253,"correct":22},"技术难度交底、采用新工艺或新材料的分部或分项工程",{"key":24,"text":235,"correct":26},{"key":28,"text":237,"correct":22},{"key":31,"text":239,"correct":22},{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":20,"analysis":33},1274568,"中标后、开工前项目部的关键是( )。",[261,263,265,267],{"key":20,"text":262,"correct":26},"工程质量目标的实现",{"key":24,"text":264,"correct":22},"编制实施性的施工组织计划",{"key":28,"text":266,"correct":22},"使进度、质量、成本和安全的各项指标能实现",{"key":31,"text":268,"correct":22},"制定并实现工程项目的质量目标",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":28,"analysis":33},1274569,"中标后、开工前项目部的核心是( )。",[273,274,275,276],{"key":20,"text":268,"correct":22},{"key":24,"text":264,"correct":22},{"key":28,"text":266,"correct":26},{"key":31,"text":262,"correct":22},{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":24,"analysis":33},1274570,"中标后、开工前项目部首先要做的是( )。",[281,282,283,284],{"key":20,"text":268,"correct":22},{"key":24,"text":264,"correct":26},{"key":28,"text":266,"correct":22},{"key":31,"text":262,"correct":22},{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":28,"analysis":33},1274571,"项目质量体系文件不包括( )。",[289,291,293,295],{"key":20,"text":290,"correct":22},"管理性文件",{"key":24,"text":292,"correct":22},"纲领性文件",{"key":28,"text":294,"correct":26},"施工性文件",{"key":31,"text":296,"correct":22},"执行性文件",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":28,"analysis":33},1274572,"管理性文件是指( )。",[301,303,305,307],{"key":20,"text":302,"correct":22},"处理质量事务工作的文件",{"key":24,"text":304,"correct":22},"做好事前质量控制的物资准备工作的文件",{"key":28,"text":306,"correct":26},"项目依据实际需要制定的文件",{"key":31,"text":308,"correct":22},"企业制定的管理规定和程序文件",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":28,"analysis":33},1274573,"纲领性文件是指( )。",[313,315,316,317],{"key":20,"text":314,"correct":22},"项目依据实际需要定制的文件",{"key":24,"text":302,"correct":22},{"key":28,"text":308,"correct":26},{"key":31,"text":304,"correct":22},{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":28,"analysis":33},1274574,"运作程序是指( )。",[322,324,326,328],{"key":20,"text":323,"correct":22},"建立各岗位人员的责任制,使之按要求运作,确保项目质量目标的实现",{"key":24,"text":325,"correct":22},"处理质量事务工作的方法",{"key":28,"text":327,"correct":26},"处理质量事务工作的每个环节先后次序",{"key":31,"text":329,"correct":22},"处理质量事务工作的方法和处理质量事务工作的每个环节先后次序",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":24,"analysis":33},1274575,"路径程序是指( )。",[334,335,336,337],{"key":20,"text":323,"correct":22},{"key":24,"text":325,"correct":26},{"key":28,"text":327,"correct":22},{"key":31,"text":329,"correct":22},{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":20,"analysis":33},1274576,"不属于ISO\u002FTC176整理并编撰八项质量管理原则( )。",[342,344,346,348],{"key":20,"text":343,"correct":26},"以供方为关注焦点",{"key":24,"text":345,"correct":22},"领导作用",{"key":28,"text":347,"correct":22},"全员参与",{"key":31,"text":349,"correct":22},"工程方法",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":28,"analysis":33},1274577,"现在用的ISO9000是( )版。",[354,356,358,360],{"key":20,"text":355,"correct":22},"2011",{"key":24,"text":357,"correct":22},"2000",{"key":28,"text":359,"correct":26},"2010",{"key":31,"text":361,"correct":22},"2009",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":24,"analysis":33},1274578,"ISO9000族标准的基本要求,质量管理的中心任务是( )。",[366,368,370,372],{"key":20,"text":367,"correct":22},"搞好质量管理的关键在领导",{"key":24,"text":369,"correct":26},"建立并实施文件化的管理体系并持续改进",{"key":28,"text":371,"correct":22},"满足顾客和组织内部双方的需求和利益",{"key":31,"text":373,"correct":22},"定期评价质量管理体系",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":28,"analysis":33},1274579,"不属于ISO9000族标准的基本要求( )。",[378,380,382,384],{"key":20,"text":379,"correct":22},"过程控制的出发点是预防不合格",{"key":24,"text":381,"correct":22},"控制所有过程质量",{"key":28,"text":383,"correct":26},"做好事前质量控制的物资准备工作",{"key":31,"text":373,"correct":22},{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":31,"analysis":33},1274580,"为了解决国际间质量争端,消除和减少技术壁垒,有效地开展国际贸易,加强国际间技术合作国际标准化组织于1987年发布了( )族质量管理与质量保证标准。",[389,391,393,395],{"key":20,"text":390,"correct":22},"ISO8900",{"key":24,"text":392,"correct":22},"ISO9900",{"key":28,"text":394,"correct":22},"ISO9800",{"key":31,"text":396,"correct":26},"ISO9000",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":28,"analysis":33},1274581,"质量检验阶段的特点( )。",[401,403,405,407],{"key":20,"text":402,"correct":22},"控制生产工程中影响质量的因素",{"key":24,"text":404,"correct":22},"把单纯的成品质量检验变成了过程管理,使质量管理从“事后”转到“事中”",{"key":28,"text":406,"correct":26},"质量管理单纯依靠事后检查、剔除废品",{"key":31,"text":408,"correct":22},"及时处理施工中发现的材料问题",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":24,"analysis":33},1274582,"物资部门主要职责不包括( )。",[413,414,416,418],{"key":20,"text":383,"correct":22},{"key":24,"text":415,"correct":26},"对新技术、新工艺、新材料等的应用编制质量控制指导性文件,并参与推广",{"key":28,"text":417,"correct":22},"保持施工机械完好状态",{"key":31,"text":419,"correct":22},"保持检测用仪器、仪表在使用有效期内",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":31,"analysis":33},1274583,"不属于有形产品的是( )。",[424,426,428,429],{"key":20,"text":425,"correct":22},"设备",{"key":24,"text":427,"correct":22},"预制构件",{"key":28,"text":7,"correct":22},{"key":31,"text":430,"correct":26},"维修",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":24,"analysis":33},1274584,"专业术语“质量”一般包括“明确要求的质量”和( )。",[435,437,439,441],{"key":20,"text":436,"correct":22},"未明确要求的质量",{"key":24,"text":438,"correct":26},"隐含要求的质量",{"key":28,"text":440,"correct":22},"特殊要求的质量",{"key":31,"text":442,"correct":22},"专业要求的质量",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":20,"analysis":33},1274585,"自动喷水灭火系统中以自动或手动方式启动的雨淋阀,应在( )。之内启动。",[447,449,451,453],{"key":20,"text":448,"correct":26},"15",{"key":24,"text":450,"correct":22},"20",{"key":28,"text":452,"correct":22},"25",{"key":31,"text":454,"correct":22},"30",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":31,"analysis":33},1274586,"自动喷水灭火系统中以自动或手动方式启动水泵时,消防水泵应在( )。内投入正常运行。",[459,460,461,462],{"key":20,"text":448,"correct":22},{"key":24,"text":450,"correct":22},{"key":28,"text":452,"correct":22},{"key":31,"text":454,"correct":26},{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":20,"analysis":33},1274587,"自动喷水灭火系统中干式报警阀组安装完毕后应向报警阀气室注入高度为( )",[467,469,471,473],{"key":20,"text":468,"correct":26},"50～100",{"key":24,"text":470,"correct":22},"75～125",{"key":28,"text":472,"correct":22},"100～150",{"key":31,"text":474,"correct":22},"125～150",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":24,"analysis":33},1274588,"自动喷水灭火系统中地下消防水泵接合器其进水口与井盖面的距离不大于( )ni,且不小于井盖的半径。",[479,481,483,485],{"key":20,"text":480,"correct":22},"0.3",{"key":24,"text":482,"correct":26},"0.4",{"key":28,"text":484,"correct":22},"0.5",{"key":31,"text":486,"correct":22},"0.6",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":24,"analysis":33},1274589,"现行的《自动喷水灭火系统施工及验收规范》GB50261-2005要求自动喷水灭火系统管网安装完毕后,应对其进行强度试验、严密性试验和( )。",[491,493,495,497],{"key":20,"text":492,"correct":22},"压力试验",{"key":24,"text":494,"correct":26},"冲洗",{"key":28,"text":496,"correct":22},"强度试验",{"key":31,"text":498,"correct":22},"灌水试验",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":24,"analysis":33},1274590,"现行的《自动喷水灭火系统施工及验收规范》GB50261-2005要求闭式喷头应进行( )。",[503,504,506,507],{"key":20,"text":492,"correct":22},{"key":24,"text":505,"correct":26},"密封性试验",{"key":28,"text":496,"correct":22},{"key":31,"text":498,"correct":22},{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":20,"analysis":33},1274591,"按照《通风与空调工程施工质量验收规范》GB50243-2002规定制冷管道系统应做( )、气密性试验和真空试验。",[512,513,515,517],{"key":20,"text":496,"correct":26},{"key":24,"text":514,"correct":22},"刚度试验",{"key":28,"text":516,"correct":22},"充气试验",{"key":31,"text":492,"correct":22},{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":20,"analysis":33},1274592,"按照《通风与空调工程施工质量验收规范》GB50243-2002要对安装完毕的空调水系统管道系统进行( )。",[522,524,526,527],{"key":20,"text":523,"correct":26},"水压试验",{"key":24,"text":525,"correct":22},"满水试验",{"key":28,"text":498,"correct":22},{"key":31,"text":528,"correct":22},"通球试验",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":28,"analysis":33},1274593,"按照《通风与空调工程施工质量验收规范》GB50243-2002对现场组装的除尘器壳体进行漏风量检测,在设计工作压力下,允许漏风率为( )。",[533,535,537,539],{"key":20,"text":534,"correct":22},"3％",{"key":24,"text":536,"correct":22},"4％",{"key":28,"text":538,"correct":26},"5%",{"key":31,"text":540,"correct":22},"6%",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":24,"analysis":33},1274594,"按照《通风与空调工程施工质量验收规范》GB50243-2002对风管进行强度检测时,其强度应能在( )倍工作压力下接缝处无开裂。",[545,547,549,551],{"key":20,"text":546,"correct":22},"1.0",{"key":24,"text":548,"correct":26},"1.5",{"key":28,"text":550,"correct":22},"2.0",{"key":31,"text":552,"correct":22},"2.5",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":31,"analysis":33},1274595,"现行的《通风与空调工程施工质量验收规范》GB50243-2002要求输送空气温度高于( )度的风管,应按设计规定采取防护措施。",[557,559,561,563],{"key":20,"text":558,"correct":22},"50",{"key":24,"text":560,"correct":22},"60",{"key":28,"text":562,"correct":22},"70",{"key":31,"text":564,"correct":26},"80",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":28,"analysis":33},1274596,"现行的《通风与空调工程施工质量验收规范》GB50243-2002要求在风管穿过需要封m防火、防爆的墙体或楼板时,应设预埋管或防护套管,其钢板厚度不小于( )mm。",[569,571,572,574],{"key":20,"text":570,"correct":22},"1.4",{"key":24,"text":548,"correct":22},{"key":28,"text":573,"correct":26},"1.6",{"key":31,"text":550,"correct":22},[576,579,582,585,588,591],{"id":15,"name":577,"category":7,"favorite":578},"领导干部任职前廉政法规知识测试题",92,{"id":580,"name":581,"category":7,"favorite":15},595,"建筑结构与设备",{"id":583,"name":584,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":586,"name":587,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":589,"name":590,"category":7,"favorite":8},534,"BIM工程师",{"id":592,"name":590,"category":7,"favorite":8},535]