[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-861-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":591},{"id":5,"name":6,"category":7,"favorite":8},861,"设备方向-岗位技能","建筑工程",0,1,50,385,[13,33,45,57,69,81,93,105,117,126,138,150,162,174,185,197,209,221,231,243,255,267,278,290,302,314,325,337,349,361,373,385,397,406,414,426,434,446,458,468,480,492,504,516,528,540,551,559,571,579],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":26,"analysis":32},1274445,"单选题","给水排水立管留洞位置失准属于( )阶段的控制失效。",[18,22,25,29],{"key":19,"text":20,"correct":21},"A","施工准备阶段的前期",false,{"key":23,"text":24,"correct":21},"B","施工准备阶段的中期",{"key":26,"text":27,"correct":28},"C","施工准备阶段的后期",true,{"key":30,"text":31,"correct":21},"D","施工准备阶段的之前","",{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":26,"analysis":32},1274446,"检查工序活动的结果,一旦发现问题,应采取的措施( )。",[37,39,41,43],{"key":19,"text":38,"correct":21},"继续作业活动,在作业过程中解决问题",{"key":23,"text":40,"correct":21},"无视问题,继续作业活动",{"key":26,"text":42,"correct":28},"停止作业活动进行处理,直到符合要求",{"key":30,"text":44,"correct":21},"停止作业活动进行处理,不做任何处理",{"id":46,"libraryId":5,"type":9,"typeLabel":15,"stem":47,"options":48,"answer":23,"analysis":32},1274448,"ZC—8接地电阻测量仪使用注意事项有:接地极、电位探测针、电流探测针三者成一直线,( )居中,三者等距,均为20m。",[49,51,53,55],{"key":19,"text":50,"correct":21},"接地极",{"key":23,"text":52,"correct":28},"电位探测针",{"key":26,"text":54,"correct":21},"电流探测针",{"key":30,"text":56,"correct":21},"接地极和电流探测针",{"id":58,"libraryId":5,"type":9,"typeLabel":15,"stem":59,"options":60,"answer":23,"analysis":32},1274449,"为了用电安全,正常电源和备用电源不能并联运行,备用电源电压值( )。",[61,63,65,67],{"key":19,"text":62,"correct":21},"大于正常电源电压值",{"key":23,"text":64,"correct":28},"与正常电源电压值保持在相同的水平",{"key":26,"text":66,"correct":21},"小于正常电源电压值。",{"key":30,"text":68,"correct":21},"不做要求",{"id":70,"libraryId":5,"type":9,"typeLabel":15,"stem":71,"options":72,"answer":19,"analysis":32},1274450,"在( )的施工图中大量采用轴测图表示,原因是轴测图立体感强,便于作业人员阅读理解。",[73,75,77,79],{"key":19,"text":74,"correct":28},"给水排水工程和通风与空调工程",{"key":23,"text":76,"correct":21},"建筑电气工程",{"key":26,"text":78,"correct":21},"建筑设计工程",{"key":30,"text":80,"correct":21},"建筑结构图",{"id":82,"libraryId":5,"type":9,"typeLabel":15,"stem":83,"options":84,"answer":26,"analysis":32},1274451,"实测法,实测检查法的手段可归纳为( )。",[85,87,89,91],{"key":19,"text":86,"correct":21},"看、摸、敲、照四个字",{"key":23,"text":88,"correct":21},"目测法、实测法和试验法三种",{"key":26,"text":90,"correct":28},"靠、吊、量、套四个字",{"key":30,"text":92,"correct":21},"计划、实施、检查和改进",{"id":94,"libraryId":5,"type":9,"typeLabel":15,"stem":95,"options":96,"answer":30,"analysis":32},1274452,"现场质量检查的内容不包括( )。",[97,99,101,103],{"key":19,"text":98,"correct":21},"开工前检查",{"key":23,"text":100,"correct":21},"工序交接检查",{"key":26,"text":102,"correct":21},"隐蔽工程检查",{"key":30,"text":104,"correct":28},"审核有关技术文件、",{"id":106,"libraryId":5,"type":9,"typeLabel":15,"stem":107,"options":108,"answer":19,"analysis":32},1274453,"事中质量控制的策略是( )。",[109,111,113,115],{"key":19,"text":110,"correct":28},"全面控制施工过程,重点控制工序质量",{"key":23,"text":112,"correct":21},"做好施工准备工作,且施工准备工作要贯穿施工全过程中",{"key":26,"text":114,"correct":21},"工序交接有对策",{"key":30,"text":116,"correct":21},"质量文件有档案",{"id":118,"libraryId":5,"type":9,"typeLabel":15,"stem":119,"options":120,"answer":23,"analysis":32},1274454,"事前质量控制指在正式施工前的质量控制,其控制重点是( )。",[121,123,124,125],{"key":19,"text":122,"correct":21},"全面控制施工过程,重点工序质量",{"key":23,"text":112,"correct":28},{"key":26,"text":114,"correct":21},{"key":30,"text":116,"correct":21},{"id":127,"libraryId":5,"type":9,"typeLabel":15,"stem":128,"options":129,"answer":26,"analysis":32},1274455,"防排烟系统的主要功能之一的标志( )。",[130,132,134,136],{"key":19,"text":131,"correct":21},"当任何一个排烟口或排烟阀开启时,排烟风机应能手动启动,同时应能立即关闭着火区的通风空调系统",{"key":23,"text":133,"correct":21},"当任何一个排烟口或排烟阀开启时,排烟风机应能自动启动,同时应不能立即关闭着火区的通风空调系统",{"key":26,"text":135,"correct":28},"当任何一个排烟口或排烟阀开启时,排烟风机应能自动启动,同时应能立即关闭着火区的通风空调系统",{"key":30,"text":137,"correct":21},"当任何一个排烟口或排烟阀开启时,排烟风机应能手动启动,同时应不能立即关闭着火区的通风空调系统",{"id":139,"libraryId":5,"type":9,"typeLabel":15,"stem":140,"options":141,"answer":19,"analysis":32},1274456,"电气设施的安全使用从哪方面人手( )。",[142,144,146,148],{"key":19,"text":143,"correct":28},"建造时要依规实施和使用时要依章维护",{"key":23,"text":145,"correct":21},"设计时要依规实施",{"key":26,"text":147,"correct":21},"使用时要依章维护",{"key":30,"text":149,"correct":21},"设计时要依规实施和使用时要依章维护",{"id":151,"libraryId":5,"type":9,"typeLabel":15,"stem":152,"options":153,"answer":23,"analysis":32},1274457,"消防法规有关规定,未经消防验收合格的工程( )。",[154,156,158,160],{"key":19,"text":155,"correct":21},"可以投入使用",{"key":23,"text":157,"correct":28},"不可以投入使用",{"key":26,"text":159,"correct":21},"只要质量满足要求,可以不经消防验收",{"key":30,"text":161,"correct":21},"不可以用于居住楼房,其他公共楼房可以使用",{"id":163,"libraryId":5,"type":9,"typeLabel":15,"stem":164,"options":165,"answer":26,"analysis":32},1274458,"检验批的质量验收记录包括( )。",[166,168,170,172],{"key":19,"text":167,"correct":21},"隐蔽的部位,查阅各专业施工图纸",{"key":23,"text":169,"correct":21},"隐蔽的时间,与施工员沟通作业计划的安排,并如期至作业面查核",{"key":26,"text":171,"correct":28},"检验批的质量检查标准,按相关专业施工质量验收规范规定执行",{"key":30,"text":173,"correct":21},"隐蔽前检查或实验要求,查阅相关专业的施工质量验收规范",{"id":175,"libraryId":5,"type":9,"typeLabel":15,"stem":176,"options":177,"answer":19,"analysis":32},1274459,"隐蔽工程记录包含( )。",[178,179,181,183],{"key":19,"text":167,"correct":28},{"key":23,"text":180,"correct":21},"检验批的质量验收记录包括检验批的划分,按施工组织设计确定的方案进行",{"key":26,"text":182,"correct":21},"检验批完工时间、检查时间安排与施工员沟通,确定实施检查时间",{"key":30,"text":184,"correct":21},"检验批的质量检查标准,按相关专业施工质量规范规定进行",{"id":186,"libraryId":5,"type":9,"typeLabel":15,"stem":187,"options":188,"answer":26,"analysis":32},1274460,"判定准确性的标准是( )。",[189,191,193,195],{"key":19,"text":190,"correct":21},"资料所反映的内容相一致",{"key":23,"text":192,"correct":21},"同一类资料中内容应一致",{"key":26,"text":194,"correct":28},"资料所反映的对象相一致和同一类资料中内容应一致",{"key":30,"text":196,"correct":21},"资料所反映的内容相一致和同一类资料中内容应一致",{"id":198,"libraryId":5,"type":9,"typeLabel":15,"stem":199,"options":200,"answer":19,"analysis":32},1274461,"工程文件中文字材料幅面尺寸规格宜为( )幅面。",[201,203,205,207],{"key":19,"text":202,"correct":28},"A4",{"key":23,"text":204,"correct":21},"A2",{"key":26,"text":206,"correct":21},"A3",{"key":30,"text":208,"correct":21},"A5",{"id":210,"libraryId":5,"type":9,"typeLabel":15,"stem":211,"options":212,"answer":30,"analysis":32},1274462,"质量资料收集的原则( )。",[213,215,217,219],{"key":19,"text":214,"correct":21},"及时参与施工活动",{"key":23,"text":216,"correct":21},"保持与工程进度同步",{"key":26,"text":218,"correct":21},"认真把关",{"key":30,"text":220,"correct":28},"整理中对作业队组提供的资料有疑问不要涂改,应找提供者澄清",{"id":222,"libraryId":5,"type":9,"typeLabel":15,"stem":223,"options":224,"answer":19,"analysis":32},1274463,"质量资料收集的要点( )。",[225,226,228,229],{"key":19,"text":214,"correct":28},{"key":23,"text":227,"correct":21},"整理后要有台账记录",{"key":26,"text":220,"correct":21},{"key":30,"text":230,"correct":21},"要按不同专业、不同种类划分,形成时间先后顺序进行整理组卷",{"id":232,"libraryId":5,"type":9,"typeLabel":15,"stem":233,"options":234,"answer":19,"analysis":32},1274464,"监控室的嵌入式显示屏柜通风不良应采取合理措施是( )。",[235,237,239,241],{"key":19,"text":236,"correct":28},"柜的两侧和背部设置百叶式通风口",{"key":23,"text":238,"correct":21},"用新的显示屏代替",{"key":26,"text":240,"correct":21},"去掉显示屏柜",{"key":30,"text":242,"correct":21},"不做处理,由于通风不良应不影响显示屏的正常工作",{"id":244,"libraryId":5,"type":9,"typeLabel":15,"stem":245,"options":246,"answer":19,"analysis":32},1274465,"监控室的嵌入式显示屏可放入后部密闭且通风不良的柜内会使( )。",[247,249,251,253],{"key":19,"text":248,"correct":28},"工作中产生的热量不易散去",{"key":23,"text":250,"correct":21},"保持柜内的清洁安全",{"key":26,"text":252,"correct":21},"有利于管理",{"key":30,"text":254,"correct":21},"保证嵌入式显示屏不受外部因素的影响",{"id":256,"libraryId":5,"type":9,"typeLabel":15,"stem":257,"options":258,"answer":19,"analysis":32},1274466,"喷淋干管为卡箍式连接,属于柔性连接,柔性连接口是管道振动发生泄漏的薄弱环节,所以每个接口处至少有( )个支架进行刚性固定,以消除或最大限度地减小接口处的振幅,以保运行中的安全。",[259,261,263,265],{"key":19,"text":260,"correct":28},"1",{"key":23,"text":262,"correct":21},"2",{"key":26,"text":264,"correct":21},"3",{"key":30,"text":266,"correct":21},"4",{"id":268,"libraryId":5,"type":9,"typeLabel":15,"stem":269,"options":270,"answer":26,"analysis":32},1274467,"火灾探测器运行时指示灯会闪烁红色表示正常,其朝向( )。",[271,272,274,276],{"key":19,"text":68,"correct":21},{"key":23,"text":273,"correct":21},"背离房间入口",{"key":26,"text":275,"correct":28},"客房的入口处",{"key":30,"text":277,"correct":21},"垂直向下",{"id":279,"libraryId":5,"type":9,"typeLabel":15,"stem":280,"options":281,"answer":26,"analysis":32},1274468,"空调冷冻水或冷却水的镀锌钢管的焊接质量缺陷主要是( )。",[282,284,286,288],{"key":19,"text":283,"correct":21},"镀锌钢管材料不合格",{"key":23,"text":285,"correct":21},"环境因素影响",{"key":26,"text":287,"correct":28},"焊工的技术素质不高",{"key":30,"text":289,"correct":21},"镀锌钢管不配套",{"id":291,"libraryId":5,"type":9,"typeLabel":15,"stem":292,"options":293,"answer":26,"analysis":32},1274469,"怎么解决风管的出风口在走廊、大厅等公共场所要与建筑装修设计和谐协调( )。",[294,296,298,300],{"key":19,"text":295,"correct":21},"只关心气流的组织",{"key":23,"text":297,"correct":21},"先取样作草图,有关各个专业共同评价确认就行",{"key":26,"text":299,"correct":28},"先取样作草图,有关各个专业共同评价确认,然后经业主认同",{"key":30,"text":301,"correct":21},"跟业主商量,经业主认同",{"id":303,"libraryId":5,"type":9,"typeLabel":15,"stem":304,"options":305,"answer":23,"analysis":32},1274470,"因进度之故先链吊曰光灯安装,怎么防止污染( )。",[306,308,310,312],{"key":19,"text":307,"correct":21},"告诉施工,让其小心施工",{"key":23,"text":309,"correct":28},"在土建喷浆前用塑料薄膜等包裹起来遮挡",{"key":26,"text":311,"correct":21},"将其卸下来",{"key":30,"text":313,"correct":21},"无法防止污染",{"id":315,"libraryId":5,"type":9,"typeLabel":15,"stem":316,"options":317,"answer":19,"analysis":32},1274471,"哪些镀锌钢导管有专用工具及配件作接地跨接连接( )。",[318,320,322,324],{"key":19,"text":319,"correct":28},"KBG管和JDG管",{"key":23,"text":321,"correct":21},"KAG管和JAG管",{"key":26,"text":323,"correct":21},"KAG管和JDG管",{"key":30,"text":323,"correct":21},{"id":326,"libraryId":5,"type":9,"typeLabel":15,"stem":327,"options":328,"answer":23,"analysis":32},1274472,"项目部组织结构的设置及人员配备不能适应工程项目施工管理和施工作业的需求是属于哪方面的原因( )。",[329,331,333,335],{"key":19,"text":330,"correct":21},"缺乏质量意识",{"key":23,"text":332,"correct":28},"管理混乱",{"key":26,"text":334,"correct":21},"施工准备不充分",{"key":30,"text":336,"correct":21},"缺少监督机制",{"id":338,"libraryId":5,"type":9,"typeLabel":15,"stem":339,"options":340,"answer":19,"analysis":32},1274473,"质量员属项目部基层质量管理人员,直接负责( ),消除或减少质量缺陷是其应急的职责。",[341,343,345,347],{"key":19,"text":342,"correct":28},"施工作业队组作业质量的指导和监督",{"key":23,"text":344,"correct":21},"积累资料,经分析整理",{"key":26,"text":346,"correct":21},"定期向领导层汇报工程质量问题的发展趋势",{"key":30,"text":348,"correct":21},"不定期向领导层汇报工程质量问题的发展趋势",{"id":350,"libraryId":5,"type":9,"typeLabel":15,"stem":351,"options":352,"answer":26,"analysis":32},1274474,"质量员要备有已公开出版的各个专业( )。",[353,355,357,359],{"key":19,"text":354,"correct":21},"质量检测手册",{"key":23,"text":356,"correct":21},"质量检查手册",{"key":26,"text":358,"correct":28},"质量通病防治手册",{"key":30,"text":360,"correct":21},"质量检测与通病防治手册",{"id":362,"libraryId":5,"type":9,"typeLabel":15,"stem":363,"options":364,"answer":19,"analysis":32},1274475,"对已掌握质量管理基本知识中对质量问题的分类,质量员要明确( )。",[365,367,369,371],{"key":19,"text":366,"correct":28},"质量缺陷和质量事故的根本区别",{"key":23,"text":368,"correct":21},"质量缺陷和质量事故的相互关系",{"key":26,"text":370,"correct":21},"质量缺陷",{"key":30,"text":372,"correct":21},"质量事故",{"id":374,"libraryId":5,"type":9,"typeLabel":15,"stem":375,"options":376,"answer":30,"analysis":32},1274476,"检验试验的方法有观察、测量、仪器检查等,其结果记录正确的是( )。",[377,379,381,383],{"key":19,"text":378,"correct":21},"合格",{"key":23,"text":380,"correct":21},"符合要求",{"key":26,"text":382,"correct":21},"符合规定",{"key":30,"text":384,"correct":28},"××MPa",{"id":386,"libraryId":5,"type":9,"typeLabel":15,"stem":387,"options":388,"answer":30,"analysis":32},1274477,"在工程质量控制材料方面,属于通风与空调工程的是( )。",[389,391,393,395],{"key":19,"text":390,"correct":21},"系统清洗、消毒、灌水、通水、通球实验记录",{"key":23,"text":392,"correct":21},"接地、绝缘电阻测试记录",{"key":26,"text":394,"correct":21},"设备调试记录",{"key":30,"text":396,"correct":28},"通风、空调系统调试记录",{"id":398,"libraryId":5,"type":9,"typeLabel":15,"stem":399,"options":400,"answer":23,"analysis":32},1274478,"在工程质量控制材料方面,属于建筑电气工程的是( )。",[401,402,403,405],{"key":19,"text":390,"correct":21},{"key":23,"text":392,"correct":28},{"key":26,"text":404,"correct":21},"制冷设备运行调试记录",{"key":30,"text":396,"correct":21},{"id":407,"libraryId":5,"type":9,"typeLabel":15,"stem":408,"options":409,"answer":19,"analysis":32},1274479,"在工程质量控制材料方面,属于给水排水与采暖工程的是( )。",[410,411,412,413],{"key":19,"text":390,"correct":28},{"key":23,"text":392,"correct":21},{"key":26,"text":404,"correct":21},{"key":30,"text":396,"correct":21},{"id":415,"libraryId":5,"type":9,"typeLabel":15,"stem":416,"options":417,"answer":26,"analysis":32},1274480,"分部工程质量验收记录由( )填写。",[418,420,422,424],{"key":19,"text":419,"correct":21},"监理工程师或建设单位专业技术负责人",{"key":23,"text":421,"correct":21},"总监理工程师",{"key":26,"text":423,"correct":28},"总监理工程师或建筑单位项目专业负责人",{"key":30,"text":425,"correct":21},"建设单位",{"id":427,"libraryId":5,"type":9,"typeLabel":15,"stem":428,"options":429,"answer":30,"analysis":32},1274481,"单位工程质量验收记录由( )填写。",[430,431,432,433],{"key":19,"text":419,"correct":21},{"key":23,"text":421,"correct":21},{"key":26,"text":423,"correct":21},{"key":30,"text":425,"correct":28},{"id":435,"libraryId":5,"type":9,"typeLabel":15,"stem":436,"options":437,"answer":30,"analysis":32},1274482,"室外工程可根据专业类别和工程规模划分( )。",[438,440,442,444],{"key":19,"text":439,"correct":21},"分部工程",{"key":23,"text":441,"correct":21},"分项工程",{"key":26,"text":443,"correct":21},"总工程",{"key":30,"text":445,"correct":28},"单位工程",{"id":447,"libraryId":5,"type":9,"typeLabel":15,"stem":448,"options":449,"answer":30,"analysis":32},1274483,"分部工程的划分应按( )确定。",[450,452,454,456],{"key":19,"text":451,"correct":21},"专业性质",{"key":23,"text":453,"correct":21},"建筑部位",{"key":26,"text":455,"correct":21},"专业技术和建筑部位",{"key":30,"text":457,"correct":28},"专业性质和建筑部位",{"id":459,"libraryId":5,"type":9,"typeLabel":15,"stem":460,"options":461,"answer":26,"analysis":32},1274484,"风机盘管机组安装前宜进行单机三速试运转及水压检漏实验,试验压力为系统工作压力的( )倍,实验观察时间2min,不渗漏为合格。",[462,463,464,466],{"key":19,"text":260,"correct":21},{"key":23,"text":262,"correct":21},{"key":26,"text":465,"correct":28},"1.5",{"key":30,"text":467,"correct":21},"2.5",{"id":469,"libraryId":5,"type":9,"typeLabel":15,"stem":470,"options":471,"answer":19,"analysis":32},1274485,"暗配线路盒箱内要清洁无尘土灰沙的原因( )。",[472,474,476,478],{"key":19,"text":473,"correct":28},"防止灰沙尘土附着在绝缘体表面,吸收潮湿后,降低导电接点间的绝缘电阻值",{"key":23,"text":475,"correct":21},"防止灰沙尘土附着在绝缘体表面,影响散热",{"key":26,"text":477,"correct":21},"防止灰沙尘土附着在绝缘体表面,吸收潮湿后,破坏绝缘电阻",{"key":30,"text":479,"correct":21},"防止灰沙尘土附着在绝缘体表面,腐蚀表面",{"id":481,"libraryId":5,"type":9,"typeLabel":15,"stem":482,"options":483,"answer":26,"analysis":32},1274486,"控制自动化仪表盘的垂直度误差为了( )。",[484,486,488,490],{"key":19,"text":485,"correct":21},"仅为使盘面上的自动化仪表保持规定的水平度或垂直度",{"key":23,"text":487,"correct":21},"仅为了整齐美观",{"key":26,"text":489,"correct":28},"使盘面上的自动化仪表保持规定的水平度或垂直度和整齐美观",{"key":30,"text":491,"correct":21},"提高仪器的寿命",{"id":493,"libraryId":5,"type":9,"typeLabel":15,"stem":494,"options":495,"answer":19,"analysis":32},1274487,"编制质量检查计划的前提( )。",[496,498,500,502],{"key":19,"text":497,"correct":28},"施工进度计划编制确定后进行",{"key":23,"text":499,"correct":21},"施工进度计划编制确定前进行",{"key":26,"text":501,"correct":21},"施工设计计划编制确定后进行",{"key":30,"text":503,"correct":21},"施工设计计划编制确定前进行",{"id":505,"libraryId":5,"type":9,"typeLabel":15,"stem":506,"options":507,"answer":19,"analysis":32},1274488,"质量员编制关系质量文件时,应从( )方面进行考虑。",[508,510,512,514],{"key":19,"text":509,"correct":28},"人、机、料、法、环",{"key":23,"text":511,"correct":21},"料、法、环",{"key":26,"text":513,"correct":21},"机、料、法、环",{"key":30,"text":515,"correct":21},"法、环",{"id":517,"libraryId":5,"type":9,"typeLabel":15,"stem":518,"options":519,"answer":23,"analysis":32},1274489,"技术交底与质量交底的关系( )。",[520,522,524,526],{"key":19,"text":521,"correct":21},"质量交底包含技术交底",{"key":23,"text":523,"correct":28},"技术交底包含质量交底",{"key":26,"text":525,"correct":21},"质量交底和技术交底对等关系",{"key":30,"text":527,"correct":21},"质量交底和技术交底无联系",{"id":529,"libraryId":5,"type":9,"typeLabel":15,"stem":530,"options":531,"answer":23,"analysis":32},1274490,"实行交底犹如计划的布置,交底的成效如何,就需要进行跟踪检查,这就是( )循环原理的体现,也是管理跟踪旁边的规律。",[532,534,536,538],{"key":19,"text":533,"correct":21},"PDBA",{"key":23,"text":535,"correct":28},"PDCA",{"key":26,"text":537,"correct":21},"PCDA",{"key":30,"text":539,"correct":21},"PBDA",{"id":541,"libraryId":5,"type":9,"typeLabel":15,"stem":542,"options":543,"answer":23,"analysis":32},1274491,"施工准备阶段编制的质量文件( )。",[544,546,548,549],{"key":19,"text":545,"correct":21},"工序质量文件",{"key":23,"text":547,"correct":28},"施工组织设计文件",{"key":26,"text":545,"correct":21},{"key":30,"text":550,"correct":21},"质量检查计划文件",{"id":552,"libraryId":5,"type":9,"typeLabel":15,"stem":553,"options":554,"answer":30,"analysis":32},1274492,"施工进度计划确定后的质量文件( )。",[555,556,557,558],{"key":19,"text":545,"correct":21},{"key":23,"text":547,"correct":21},{"key":26,"text":545,"correct":21},{"key":30,"text":550,"correct":28},{"id":560,"libraryId":5,"type":9,"typeLabel":15,"stem":561,"options":562,"answer":19,"analysis":32},1274493,"重视节能效果,做好设备使用说明的阅读,属于( )阶段的质量预控。",[563,565,567,569],{"key":19,"text":564,"correct":28},"事前阶段质量控制",{"key":23,"text":566,"correct":21},"事中阶段质量控制",{"key":26,"text":568,"correct":21},"事后阶段质量控制",{"key":30,"text":570,"correct":21},"事前阶段管理控制",{"id":572,"libraryId":5,"type":9,"typeLabel":15,"stem":573,"options":574,"answer":19,"analysis":32},1274494,"项目负责人的介绍说明了( )对影响工程质量的因素进行控制。",[575,576,577,578],{"key":19,"text":509,"correct":28},{"key":23,"text":511,"correct":21},{"key":26,"text":513,"correct":21},{"key":30,"text":515,"correct":21},{"id":580,"libraryId":5,"type":9,"typeLabel":15,"stem":581,"options":582,"answer":23,"analysis":32},1274495,"施工工程发生设计变更信息中断而造成的质量问题是发生在( )阶段的质量控制。",[583,585,587,589],{"key":19,"text":584,"correct":21},"事前质量控制失效",{"key":23,"text":586,"correct":28},"事中质量控制失效",{"key":26,"text":588,"correct":21},"事后质量控制失效",{"key":30,"text":590,"correct":21},"事前管理控制失效",[592,595,598,601,604,607],{"id":9,"name":593,"category":7,"favorite":594},"领导干部任职前廉政法规知识测试题",92,{"id":596,"name":597,"category":7,"favorite":9},595,"建筑结构与设备",{"id":599,"name":600,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":602,"name":603,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":605,"name":606,"category":7,"favorite":8},534,"BIM工程师",{"id":608,"name":606,"category":7,"favorite":8},535]