[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1274774":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1274774,861,3,"判断题","按照时间阶段划分,设备安装工程的施工试验可分为静态试验和动态考核两类。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"",{"id":6,"name":21,"category":22,"favorite":23},"设备方向-岗位技能","建筑工程",0]