[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1274725":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1274725,861,2,"多选题","单位（子单位）工程验收合格的规定包含( )。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","单位（子单位）工程所包含分部（子分部）工程的质量均应验收合格",true,{"key":16,"text":17,"correct":14},"B","质量控制资料应完整",{"key":19,"text":20,"correct":14},"C","单位（子单位）工程所含分部工程有关安全和功能的监测资料应完整",{"key":22,"text":23,"correct":14},"D","观感质量验收应符合要求",{"key":25,"text":26,"correct":27},"E","人员资料应完整",false,"ABCD","",{"id":6,"name":31,"category":32,"favorite":33},"设备方向-岗位技能","建筑工程",0]