[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1274703":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1274703,861,2,"多选题","计划部门主要职责( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","各类进度计划的安排要符合工艺技术规律,确保工程质量得到有效控制",true,{"key":16,"text":17,"correct":14},"B","安排好图纸会审、竣工验收、内外沟通、洽谈协商等各类与质量控制有关活动的时间、地点,并做好相关的准备工作",{"key":19,"text":20,"correct":21},"C","组织事前质量控制是技术准备工作",false,{"key":23,"text":24,"correct":21},"D","保持检测用仪器、仪表在使用有效期内",{"key":26,"text":27,"correct":21},"E","组织按计划确定的施工现场质量检查工作","AB","",{"id":6,"name":31,"category":32,"favorite":33},"设备方向-岗位技能","建筑工程",0]