[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1274692":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1274692,861,2,"多选题","方法控制包含( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","施工组织设计",true,{"key":16,"text":17,"correct":18},"B","施工计划",false,{"key":20,"text":21,"correct":14},"C","施工工艺",{"key":23,"text":24,"correct":14},"D","施工技术措施",{"key":26,"text":27,"correct":14},"E","施工方案","ACDE","",{"id":6,"name":31,"category":32,"favorite":33},"设备方向-岗位技能","建筑工程",0]