[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1274581":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1274581,861,1,"单选题","质量检验阶段的特点( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","控制生产工程中影响质量的因素",false,{"key":16,"text":17,"correct":14},"B","把单纯的成品质量检验变成了过程管理,使质量管理从“事后”转到“事中”",{"key":19,"text":20,"correct":21},"C","质量管理单纯依靠事后检查、剔除废品",true,{"key":23,"text":24,"correct":14},"D","及时处理施工中发现的材料问题","",{"id":6,"name":27,"category":28,"favorite":29},"设备方向-岗位技能","建筑工程",0]