[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1274570":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1274570,861,1,"单选题","中标后、开工前项目部首先要做的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","制定并实现工程项目的质量目标",false,{"key":16,"text":17,"correct":18},"B","编制实施性的施工组织计划",true,{"key":20,"text":21,"correct":14},"C","使进度、质量、成本和安全的各项指标能实现",{"key":23,"text":24,"correct":14},"D","工程质量目标的实现","",{"id":6,"name":27,"category":28,"favorite":29},"设备方向-岗位技能","建筑工程",0]