[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1274520":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1274520,861,1,"单选题","设备安装工程的施工试验分类从时间阶段划分( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工准备阶段的施工试验",true,{"key":16,"text":17,"correct":18},"B","静态试验和施工准备阶段的施工试验",false,{"key":20,"text":21,"correct":18},"C","动态考核和施工准备阶段的施工试验",{"key":23,"text":24,"correct":18},"D","静态试验和动态考核","",{"id":6,"name":27,"category":28,"favorite":29},"设备方向-岗位技能","建筑工程",0]