[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1274517":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1274517,861,1,"单选题","下列不属于设备安装工程试运行的条件的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","符合试运行中检测工作要求",true,{"key":16,"text":17,"correct":18},"B","试运行范围内的工程已按合同约定全部完工,并经自检静态查质量合格",false,{"key":20,"text":21,"correct":18},"C","试运行所需的电力、供水、供气均接入到位",{"key":23,"text":24,"correct":18},"D","试运行涉及的环境、场地已清理","",{"id":6,"name":27,"category":28,"favorite":29},"设备方向-岗位技能","建筑工程",0]