[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1274492":3},{"question":4,"library":25},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":21,"analysis":24},1274492,861,1,"单选题","施工进度计划确定后的质量文件( )。",[11,15,18,20],{"key":12,"text":13,"correct":14},"A","工序质量文件",false,{"key":16,"text":17,"correct":14},"B","施工组织设计文件",{"key":19,"text":13,"correct":14},"C",{"key":21,"text":22,"correct":23},"D","质量检查计划文件",true,"",{"id":6,"name":26,"category":27,"favorite":28},"设备方向-岗位技能","建筑工程",0]