[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1274472":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1274472,861,1,"单选题","项目部组织结构的设置及人员配备不能适应工程项目施工管理和施工作业的需求是属于哪方面的原因( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","缺乏质量意识",false,{"key":16,"text":17,"correct":18},"B","管理混乱",true,{"key":20,"text":21,"correct":14},"C","施工准备不充分",{"key":23,"text":24,"correct":14},"D","缺少监督机制","",{"id":6,"name":27,"category":28,"favorite":29},"设备方向-岗位技能","建筑工程",0]