[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1274462":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1274462,861,1,"单选题","质量资料收集的原则( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","及时参与施工活动",false,{"key":16,"text":17,"correct":14},"B","保持与工程进度同步",{"key":19,"text":20,"correct":14},"C","认真把关",{"key":22,"text":23,"correct":24},"D","整理中对作业队组提供的资料有疑问不要涂改,应找提供者澄清",true,"",{"id":6,"name":27,"category":28,"favorite":29},"设备方向-岗位技能","建筑工程",0]