[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1274452":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1274452,861,1,"单选题","现场质量检查的内容不包括( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","开工前检查",false,{"key":16,"text":17,"correct":14},"B","工序交接检查",{"key":19,"text":20,"correct":14},"C","隐蔽工程检查",{"key":22,"text":23,"correct":24},"D","审核有关技术文件、",true,"",{"id":6,"name":27,"category":28,"favorite":29},"设备方向-岗位技能","建筑工程",0]