[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-860-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":605},{"id":5,"name":6,"category":7,"favorite":8},860,"(装饰质量)专业管理实务 岗位知识","建筑工程",0,7,50,931,[13,34,46,58,70,82,94,106,118,130,142,150,162,174,184,196,208,220,232,244,256,268,280,292,303,315,326,338,350,362,374,386,398,410,418,430,442,454,466,478,490,498,509,521,533,545,557,569,581,593],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1273811,1,"单选题","建筑装饰门窗工程隐蔽项目中不包括（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","预埋件",false,{"key":24,"text":25,"correct":22},"B","锚固件",{"key":27,"text":28,"correct":29},"C","五金配件",true,{"key":31,"text":32,"correct":22},"D","预埋木砖的防腐处理","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1273812,"实木地板质量应符合《实木地板第1部分：技术要求》GB\u002FT15036.1的规定。实木地板的技术要求不包括（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"分等",{"key":24,"text":41,"correct":22},"外观质量",{"key":27,"text":43,"correct":22},"加工精度",{"key":31,"text":45,"correct":29},"施工顺序",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1273813,"下列窗帘盒施工流程，正确的顺序是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"材料准备→安装木基层→窗帘盒安装→定位放线→窗帘轨固定→验收",{"key":24,"text":53,"correct":22},"材料准备→安装木基层→定位放线→窗帘盒安装窗帘轨固定→验收",{"key":27,"text":55,"correct":29},"材料准备→定位放线→安装木基层→窗帘盒安装→窗帘轨固定→验收",{"key":31,"text":57,"correct":22},"材料准备→定位放线→安装木基层→窗帘轨固定→窗帘盒安装→验收",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1273814,"下列关于室内窗台板安装时，泛水做法正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"室内窗台板面层向室外方向略有倾斜，坡度约1％",{"key":24,"text":65,"correct":22},"室内窗台板面层向室外方向略有倾斜，坡度约3%",{"key":27,"text":67,"correct":29},"室内窗台板面层向室内方向略有倾斜，坡度约1%",{"key":31,"text":69,"correct":22},"室内窗台板面层向室内方向略有倾斜，坡度约3％",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1273815,"墙面砖工程质量控制点中不包括（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"墙面砖出现小窄边",{"key":24,"text":77,"correct":22},"墙面出现高低差，平整度",{"key":27,"text":79,"correct":22},"面砖空鼓、断裂",{"key":31,"text":81,"correct":29},"瓷砖报价",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1273816,"下列关于木踢脚板安装技术要点的说法，错误的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"踢脚板背面应刷防腐涂料",{"key":24,"text":89,"correct":29},"木踢脚板接缝处应做平接",{"key":27,"text":91,"correct":22},"转角处应做成45°斜角对接",{"key":31,"text":93,"correct":22},"木踢脚板安装后必须与地板面垂直",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1273817,"某项目进行地面环氧自流平面层的施工，项目部进行施工方案的编制。主要内容包括：施工温度控制在5~35℃，相对湿度不宜高于85％；自流平施工前先进行地面基层的整平工作，平整度不应大于4mm\u002F2；采用石膏基自流平砂浆作为找平层等。监理工程师提出问题，要求修改。根据背景资料，回答下列1~6问题。 环氧树脂自流平地面施工前先进行基层的整平工作，平整度不应大于（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":29},"3mm\u002F2m",{"key":24,"text":101,"correct":22},"4mm\u002F2m",{"key":27,"text":103,"correct":22},"3mm\u002F5m",{"key":31,"text":105,"correct":22},"4mm\u002F5m",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1273818,"墙身返潮和地面渗漏的防治措施错误的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":29},"墙面上设有热水器时，其防水高度为1800mm；淋浴处墙面防水高度不应大于1500mm",{"key":24,"text":113,"correct":22},"墙体根部与地面的转角处找平层应做成钝角",{"key":27,"text":115,"correct":22},"预留洞口、孔洞、埋设的预埋件位置必须正确、可靠.地漏、洞口、预埋件周边必须设有防渗漏的附加层防水措施",{"key":31,"text":117,"correct":22},"防水层施工时，应保持基层干净、干燥，确保涂膜防水与基层粘结牢固",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1273819,"某项目进行地面环氧自流平面层的施工，项目部进行施工方案的编制。主要内容包括：施工温度控制在5~35℃，相对湿度不宜高于85％；自流平施工前先进行地面基层的整平工作，平整度不应大于4mm\u002F2；采用石膏基自流平砂浆作为找平层等。监理工程师提出问题，要求修改。根据背景资料，回答下列1~6问题。 环氧树脂自流平地面施工环境温度宜为（ ）℃。",[122,124,126,128],{"key":20,"text":123,"correct":22},"5~30",{"key":24,"text":125,"correct":22},"5~35",{"key":27,"text":127,"correct":29},"15~25",{"key":31,"text":129,"correct":22},"5~25",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1273820,"壁纸（布）裱糊工程要求混凝土基层的含水不得大于（ ）%。",[134,136,138,140],{"key":20,"text":135,"correct":29},"8",{"key":24,"text":137,"correct":22},"10",{"key":27,"text":139,"correct":22},"12",{"key":31,"text":141,"correct":22},"15",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},1273821,"木花格宜选用硬木或杉木制作，其含水率应低于（ ）%。",[146,147,148,149],{"key":20,"text":135,"correct":22},{"key":24,"text":137,"correct":22},{"key":27,"text":139,"correct":29},{"key":31,"text":141,"correct":22},{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":31,"analysis":33},1273822,"下列关于抹灰空鼓、裂缝防治措施叙述错误的是（。",[154,156,158,160],{"key":20,"text":155,"correct":22},"抹灰前.应将基层表面清扫干净.脚手眼等孔洞填堵严实",{"key":24,"text":157,"correct":22},"混凝土墙表面凸出较大的地方应事先剔平刷净",{"key":27,"text":159,"correct":22},"蜂窝、凹洼、缺棱掉角处.应先刷一道1:4-108胶：水的胶水溶液.再用1:3水泥砂浆分层填补",{"key":31,"text":161,"correct":29},"加气混凝土墙面缺棱掉角和板缝处.宜先刷掺水泥重量10%的108胶的素水泥浆一道.再用1:1:1混合砂浆修补抹平",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":31,"analysis":33},1273823,"下列选项中，不属于吊顶工程施工质量计划编制内容的有（ ）。",[166,168,170,172],{"key":20,"text":167,"correct":22},"质量总目标及其分解目标",{"key":24,"text":169,"correct":22},"施工工艺与操作方法的技术措施与施工组织措施",{"key":27,"text":171,"correct":22},"施工质量检验、检测、试验工作、明确检验批验收标准",{"key":31,"text":173,"correct":29},"安全管理措施",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":24,"analysis":33},1273824,"玻璃护栏施工时，当栏板玻璃最低点离一侧楼地面高度大于（ ）m时，不得使用承受水平荷载的栏板玻璃。",[178,180,182,183],{"key":20,"text":179,"correct":22},"3",{"key":24,"text":181,"correct":29},"5",{"key":27,"text":135,"correct":22},{"key":31,"text":137,"correct":22},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":27,"analysis":33},1273825,"某项目进行地面环氧自流平面层的施工，项目部进行施工方案的编制。主要内容包括：施工温度控制在5~35℃，相对湿度不宜高于85％；自流平施工前先进行地面基层的整平工作，平整度不应大于4mm\u002F2；采用石膏基自流平砂浆作为找平层等。监理工程师提出问题，要求修改。根据背景资料，回答下列1~6问题。 环氧树脂自流平地面施工环境相对湿度不宜高于（ ）％。",[188,190,192,194],{"key":20,"text":189,"correct":22},"60",{"key":24,"text":191,"correct":22},"70",{"key":27,"text":193,"correct":29},"80",{"key":31,"text":195,"correct":22},"90",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":27,"analysis":33},1273826,"下列关于吊顶工程质量通病说法正确的是（ ）。",[200,202,204,206],{"key":20,"text":201,"correct":22},"吊杆、龙骨和饰面材料安装牢固",{"key":24,"text":203,"correct":22},"金属吊杆、龙骨的接缝均匀，角缝不吻合，表面不平整、翘曲、有锤印；木质吊杆、龙骨不顺直、劈裂、变形",{"key":27,"text":205,"correct":29},"吊顶内填充的吸声材料无防散落措施",{"key":31,"text":207,"correct":22},"饰面材料表面干净、色泽不一致，有翘曲、裂纹及缺损",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":31,"analysis":33},1273827,"下列不属于内墙和顶棚涂料涂层颜色不均匀原因分析的是（ ）。",[212,214,216,218],{"key":20,"text":213,"correct":22},"不是同批涂料，颜料掺量有差异",{"key":24,"text":215,"correct":22},"使用涂料时未搅拌匀或任意加水，使涂料本身颜色深浅不同，造成墙面颜色不均勻",{"key":27,"text":217,"correct":22},"基层材料差异，混凝土或砂浆龄期相差悬殊，湿度、碱度有明显差异",{"key":31,"text":219,"correct":29},"喷涂骨架层时，骨料稠度改变；空压机压力变化过大；喷嘴距基层距离、角度变化及喷涂快慢不匀等都会造成花纹大小不一致",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":31,"analysis":33},1273828,"下列不属于离缝或亏纸的原因分析的是（ ）。",[224,226,228,230],{"key":20,"text":225,"correct":22},"裁割壁纸未按照量好的尺寸，裁割尺寸偏小，裱糊后出现亏纸；或丈量尺寸本身偏小，也会造成亏纸",{"key":24,"text":227,"correct":22},"第1张壁纸裱糊后，在裱糊第2张壁纸时，未连接准确就压实；或虽连接准确，但裱糊操作时赶压底层胶液推力过大而使壁纸伸胀，在干燥过程中产生回缩，造成离缝或亏纸现象",{"key":27,"text":229,"correct":22},"搭接裱糊壁纸裁割时，接缝处不是一刀裁割到底，而是变换多次刀刃的方向或钢直尺偏移，使壁纸忽胀忽亏，裱糊后亏损部分就出现离缝",{"key":31,"text":231,"correct":29},"涂料质量不合标准，耐水性能不合格",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":24,"analysis":33},1273829,"建设工程项目竣工验收可以分为三个环节，分别是（ ）。",[236,238,240,242],{"key":20,"text":237,"correct":22},"施工单位验收、监理验收、建设单位验收",{"key":24,"text":239,"correct":29},"验收准备、竣工预验收、正式验收",{"key":27,"text":241,"correct":22},"材料验收、资料验收、施工验收",{"key":31,"text":243,"correct":22},"单元验收、单位验收、单项验收",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":31,"analysis":33},1273830,"木板条隔墙与结构或门架固定不牢原因分析错误的是（ ）。",[248,250,252,254],{"key":20,"text":249,"correct":22},"上下槛和立体结构固定不牢；立筋与横撑没有与上下槛形成整体",{"key":24,"text":251,"correct":22},"龙骨不合设计要求",{"key":27,"text":253,"correct":22},"安装时，施工顺序不正确",{"key":31,"text":255,"correct":29},"门口处上、下槛被断开后未采取加强措施",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":24,"analysis":33},1273831,"装饰抹灰分项工程室外每个检验批每（ ）m2应至少抽查一处，每处不得小于10m2。",[260,262,264,266],{"key":20,"text":261,"correct":22},"50",{"key":24,"text":263,"correct":29},"100",{"key":27,"text":265,"correct":22},"500",{"key":31,"text":267,"correct":22},"1000",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":31,"analysis":33},1273832,"下列不属于陶瓷砖饰面不平整，分格缝不均，砖缝不平直的原因分析的是（ ）。",[272,274,276,278],{"key":20,"text":273,"correct":22},"陶瓷锦砖粘贴时，粘结层砂浆厚度小（3-4mm），对基层处理和抹灰质量要求均很严格",{"key":24,"text":275,"correct":22},"施工前，没有按照设计图纸尺寸核对结构施工实际情况，进行排砖、分格和绘制大样图，抹底子灰时，各部位挂线找规矩不够，造成尺寸不准，引起分格缝不均匀",{"key":27,"text":277,"correct":22},"陶瓷锦砖粘贴揭纸后，没有及时对砖缝进行检查和认真拨正调直",{"key":31,"text":279,"correct":29},"砂浆配合比不准，稠度控制不好，砂子中含泥量过大，在同一施工面上，采用不同的配合比砂浆，引起不同的干缩率而开裂、空鼓",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":20,"analysis":33},1273833,"装饰抹灰分项工程室内每个检验批应至少抽查（ ）并不得少于3间；不足3间时应全数检查。",[284,286,288,290],{"key":20,"text":285,"correct":29},"10%",{"key":24,"text":287,"correct":22},"30%",{"key":27,"text":289,"correct":22},"50%",{"key":31,"text":291,"correct":22},"5%",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":31,"analysis":33},1273834,"下列不属于花饰不对称的原因分析的是（ ）。",[296,298,300,302],{"key":20,"text":297,"correct":22},"裱糊壁纸前没有区分无花饰和有花饰壁纸的特点，盲目裁割壁纸",{"key":24,"text":299,"correct":22},"在同一张纸上印有正花和反花、阴花和阳花饰，裱糊时未仔细区别，造成相邻壁纸花饰相同",{"key":27,"text":301,"correct":22},"对要裱糊壁纸的墙面未进行周密的观察研究，门窗口的两边、室内对称的柱子、两面对称的墙，裱糊壁纸的花饰不对称",{"key":31,"text":249,"correct":29},{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":31,"analysis":33},1273835,"下列不属于室内主要防水部位（ ）。",[307,309,311,313],{"key":20,"text":308,"correct":22},"厕所",{"key":24,"text":310,"correct":22},"浴室",{"key":27,"text":312,"correct":22},"厨房",{"key":31,"text":314,"correct":29},"楼梯间",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":27,"analysis":33},1273836,"某办公楼装修项目施工，地面为有防静电要求的活动地板面层；顶面采用轻钢龙骨安装矿棉板吊顶面层（龙骨可见）；墙面为轻钢龙骨石膏板隔墙涂刷乳胶漆面层；一侧墙面安装有固定壁柜、吊柜等。项目部施工完成后，经自检合格后，报请监理工程师进行根据背景资料，回答下列1~6问题。 轻钢龙骨隔墙表面封纸面石膏板的表面平整度允讠午偏差为（ ）mm。",[319,321,323,324],{"key":20,"text":320,"correct":22},"1",{"key":24,"text":322,"correct":22},"2",{"key":27,"text":179,"correct":29},{"key":31,"text":325,"correct":22},"4",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":27,"analysis":33},1273837,"木板条隔墙与结构或门架固定不牢的防治措施错误的是（ ）。",[330,332,334,336],{"key":20,"text":331,"correct":22},"筋间距应根据进场板条长度考虑．量材使用，但最大间距不得超过500mm",{"key":24,"text":333,"correct":22},"下槛要与主体结构连接牢固，能伸人结构部分应伸入嵌牢",{"key":27,"text":335,"correct":29},"选材符合要求，不得有影响使用的瑕疵，断面不应小于50mm×70mm",{"key":31,"text":337,"correct":22},"正确按施工顺序安装",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":24,"analysis":33},1273838,"下列不属于门窗工程的质量通病的是（ ）。",[342,344,346,348],{"key":20,"text":343,"correct":22},"安装不牢固、开门不灵活",{"key":24,"text":345,"correct":29},"金属吊杆、龙骨的接缝不均匀，角缝不吻合",{"key":27,"text":347,"correct":22},"扇的橡胶密封条或毛毯密封条托槽",{"key":31,"text":349,"correct":22},"划痕、碰伤、漆膜或保护层不连续",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":31,"analysis":33},1273839,"墙体与门窗框交接处抹灰层空鼓、裂缝脱落的原因分析错误的是（ ）",[354,356,358,360],{"key":20,"text":355,"correct":22},"基层处理不当",{"key":24,"text":357,"correct":22},"操作不当：预埋木砖（件）位置不当，数量不足",{"key":27,"text":359,"correct":22},"砂浆品种选择不当",{"key":31,"text":361,"correct":29},"底子灰过分干燥",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":31,"analysis":33},1273840,"大理石墙、柱面饰面接缝不平、板面纹理不顺、色泽不匀的原因分析错误的是（ ）。",[366,368,370,372],{"key":20,"text":367,"correct":22},"基层处理不符合质量要求",{"key":24,"text":369,"correct":22},"对板材质量的检验不严格",{"key":27,"text":371,"correct":22},"镶贴前试拼不认真",{"key":31,"text":373,"correct":29},"施工操作不当，特别是分次灌浆时，灌浆高度过低",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":31,"analysis":33},1273841,"下列各项不属于单位工程质量控制资料检查记录控制内容的是（ ）。",[378,380,382,384],{"key":20,"text":379,"correct":22},"图纸会审记录",{"key":24,"text":381,"correct":22},"隐蔽工程验收记录",{"key":27,"text":383,"correct":22},"施工记录",{"key":31,"text":385,"correct":29},"施工组织设计",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":20,"analysis":33},1273842,"下列分部工程验收过程中，需要设计单位项目负责人参加的是（ ）。",[390,392,394,396],{"key":20,"text":391,"correct":29},"主体结构和建筑节能",{"key":24,"text":393,"correct":22},"装饰装修和电梯",{"key":27,"text":395,"correct":22},"建筑给水排水及供暖和通风与空调",{"key":31,"text":397,"correct":22},"建筑电气和智能建筑",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":31,"analysis":33},1273843,"下列可不参加单位工程质量验收的人员是（ ）。",[402,404,406,408],{"key":20,"text":403,"correct":22},"监理工程师",{"key":24,"text":405,"correct":22},"设计单位项目负责人",{"key":27,"text":407,"correct":22},"施工单位项目负责人",{"key":31,"text":409,"correct":29},"采购单位项目，负责人",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":31,"analysis":33},1273844,"下列不属于室内主要防水部位的是（ ）。",[414,415,416,417],{"key":20,"text":308,"correct":22},{"key":24,"text":310,"correct":22},{"key":27,"text":312,"correct":22},{"key":31,"text":314,"correct":29},{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":20,"analysis":33},1273845,"下列关于观感质量验收的说法，错误的是（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":29},"观感质量的验收应由参加验收的监理人员给出评价结果",{"key":24,"text":425,"correct":22},"观感质量的验收以观察、触摸或简单量测的方式进行，并结合验收人的主观判断",{"key":27,"text":427,"correct":22},"观感质量的验收结论一般以“好”、“一般”、“差”为质量评价结果",{"key":31,"text":429,"correct":22},"观感质量验收时，如质量评价结果为“差”的检查点应进行返修处理",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":27,"analysis":33},1273846,"下列不属于涂饰工程的质量通病的是（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":22},"泛碱、咬色",{"key":24,"text":437,"correct":22},"流坠、疙瘩",{"key":27,"text":439,"correct":29},"空鼓、脱层",{"key":31,"text":441,"correct":22},"透底、起皮",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":20,"analysis":33},1273847,"（ ）是指建筑工程施工质量中不符合规定要求的检验项或检验点，按其程度可分为严重缺陷和一般缺陷。",[446,448,450,452],{"key":20,"text":447,"correct":29},"工程质量缺陷",{"key":24,"text":449,"correct":22},"工程质量通病",{"key":27,"text":451,"correct":22},"工程质量事故",{"key":31,"text":453,"correct":22},"工程质量延误",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":20,"analysis":33},1273848,"单位工程验收时，验收签字人员应由相应单位的（ ）书面授权。",[458,460,462,464],{"key":20,"text":459,"correct":29},"法人代表",{"key":24,"text":461,"correct":22},"项目负责人",{"key":27,"text":463,"correct":22},"项目技术负责人",{"key":31,"text":465,"correct":22},"项目质量负责人",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":20,"analysis":33},1273849,"内墙面起泡、开花或有抹纹的防治措施中，石灰膏熟化时间不少于30d，淋制时用小于3mm×3mm筛子过滤，采用磨细生石灰粉时，最好也提前2～3d化成石灰膏。",[470,472,474,476],{"key":20,"text":471,"correct":29},"30d，2～3d",{"key":24,"text":473,"correct":22},"35d，2～3d",{"key":27,"text":475,"correct":22},"35d，2～5d",{"key":31,"text":477,"correct":22},"30d，2～5d",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":27,"analysis":33},1273850,"下列关于窗帘盒、金属窗帘杆安装叙述错误的是（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":22},"窗帘盒安装不平、不正：主要是找位、划尺寸线不认真，预埋件安装不准，调整不当",{"key":24,"text":485,"correct":22},"窗帘盒两端伸出的长度不一致：主要是窗中心与窗帘盒中心相对准，操作不真所致",{"key":27,"text":487,"correct":29},"窗帘轨道脱落：多数由于盖板太厚或螺丝松动造成",{"key":31,"text":489,"correct":22},"窗帘盒迎面板扭曲：加工时木材干燥不好，入场后存放受潮，安装时应及时刷油漆一遍",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":20,"analysis":33},1273851,"同一品种、类型和规格的特种门每（ ）樘应划分为一个检验批。",[494,495,496,497],{"key":20,"text":261,"correct":29},{"key":24,"text":263,"correct":22},{"key":27,"text":265,"correct":22},{"key":31,"text":267,"correct":22},{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":31,"analysis":33},1273852,"下列关于抹灰空鼓、裂缝防治措施叙述错误的是（ ）。",[502,504,505,507],{"key":20,"text":503,"correct":22},"抹灰前，应将基层表面清扫干净，脚手眼等孔洞填堵严实",{"key":24,"text":157,"correct":22},{"key":27,"text":506,"correct":22},"蜂窝、凹洼、缺棱掉角处，应先刷一道1：4—107胶：水的胶水溶液，再用1：3水泥砂浆分层填补",{"key":31,"text":508,"correct":29},"加气混凝土墙面缺棱掉角和板缝处，宜先刷掺水泥重量10％的108胶的素水泥浆一道，再用1：1：1混合砂浆修补抹平",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":31,"analysis":33},1273853,"下列关于单位工程定义和划分的说法，错误的是（ ）。",[513,515,517,519],{"key":20,"text":514,"correct":22},"单位工程应具有独立的施工条件和能形成独立的使用功能",{"key":24,"text":516,"correct":22},"单位工程可在施工前由建设、监理、施工单位商议确定",{"key":27,"text":518,"correct":22},"一个单位工程往往由多个分部工程组成",{"key":31,"text":520,"correct":29},"一个建设工程施工合同只能涉及一个单位工程",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":24,"analysis":33},1273854,"外墙涂料饰面起鼓、起皮、脱落法制措施错误的是（ ）。",[525,527,529,531],{"key":20,"text":526,"correct":22},"涂刷底釉涂料前，对基层缺陷进行修补平整；刷除表面油污、浮灰",{"key":24,"text":528,"correct":29},"检查基层是否干燥，含水率应小于9％",{"key":27,"text":530,"correct":22},"外墙过干，施涂前可稍加湿润，然后涂抗碱底漆或封闭底漆",{"key":31,"text":532,"correct":22},"当基层表面太光滑时，要适当敲毛，出现小孔、麻点可用107胶水配滑石粉作腻子刮平",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":27,"analysis":33},1273855,"下列不属于纤维板或胶合板吊顶面层变形的原因分析的是（ ）。",[537,539,541,543],{"key":20,"text":538,"correct":22},"维板或胶合板，在使用中要吸收空气中的水分，特别是纤维板不是均质材料，各部分吸湿程度差异大，故易产生凹凸变形",{"key":24,"text":540,"correct":22},"板块较大，装钉时没能使板块与吊顶格栅全部贴紧，又从四角或四周向中心排钉装钉，板块内储存有应力，致使板块凹凸变形",{"key":27,"text":542,"correct":29},"加强技术培训和质量管理",{"key":31,"text":544,"correct":22},"吊顶格栅分格过大．板块易产生挠度变形",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":27,"analysis":33},1273856,"木门窗玻璃装完后松动或不平整的原因分析错误的是（ ）。",[549,551,553,555],{"key":20,"text":550,"correct":22},"裁口内的胶渍、灰砂颗粒、木屑渣等未清除干净",{"key":24,"text":552,"correct":22},"未铺垫底油灰，或底油灰厚薄不均、漏铺；或铺底油灰后，未及时安装玻璃，底油灰已结硬失去作用",{"key":27,"text":554,"correct":29},"玻璃裁制的尺寸偏大，影响钉子（或卡子）钉牢",{"key":31,"text":556,"correct":22},"钉子钉人数量不足或钉子没有贴紧玻璃，出现浮钉，不起作用",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":20,"analysis":33},1273857,"下列属于室内防水工程的质量缺陷的是（ ）。",[561,563,565,567],{"key":20,"text":562,"correct":29},"地面板材安装不牢固",{"key":24,"text":564,"correct":22},"地漏周围渗漏",{"key":27,"text":566,"correct":22},"墙身返潮和地面渗漏",{"key":31,"text":568,"correct":22},"地面汇水倒坡",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":24,"analysis":33},1273858,"铝合金龙骨不顺直的防治措施错误的是（ ）。",[573,575,577,579],{"key":20,"text":574,"correct":22},"凡是受扭折的主龙骨、次龙骨一律不宜采用",{"key":24,"text":576,"correct":29},"挂铅线的钉位，应按龙骨的走向每间距1.2m射二枚钢钉",{"key":27,"text":578,"correct":22},"一定要拉通线，逐条调整龙骨的高低位置和线条平直",{"key":31,"text":580,"correct":22},"四周墙面的水平线应测量正确，中间接平线起拱度1\u002F200～1\u002F300",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":24,"analysis":33},1273859,"下列关于壁柜、吊柜及固定家具安装叙述正确的是（ ）。",[585,587,589,591],{"key":20,"text":586,"correct":22},"抹灰面与框不平，造成贴脸板、压缝条不平：主要是因柜不垂直，面层平度不一致或抹灰面不垂直",{"key":24,"text":588,"correct":29},"柜框安装不牢固：预埋木砖安装时碰活动，固定点少，用钉固定时，要数量够，木砖埋件牢固",{"key":27,"text":590,"correct":22},"合页不平，螺丝松动，螺帽不平正，缺螺丝：合页槽深浅不一，安装时螺丝钉打入太长。操作时螺丝打入长度2\u002F3，拧入深度应2\u002F3，不得倾斜",{"key":31,"text":592,"correct":22},"柜框与洞口尺寸误差过大，造成边框与侧墙、顶与上框间缝隙太小，注意结构施工留洞尺寸，严格检查确保洞口尺寸",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":31,"analysis":33},1273860,"下列楼梯中不属于按楼梯平面形式分类的为（ ）。",[597,599,601,603],{"key":20,"text":598,"correct":22},"双跑平行楼梯",{"key":24,"text":600,"correct":22},"双分平行楼梯",{"key":27,"text":602,"correct":22},"转角楼梯",{"key":31,"text":604,"correct":29},"室内楼梯",[606,609,612,615,618,621],{"id":15,"name":607,"category":7,"favorite":608},"领导干部任职前廉政法规知识测试题",92,{"id":610,"name":611,"category":7,"favorite":15},595,"建筑结构与设备",{"id":613,"name":614,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":616,"name":617,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":619,"name":620,"category":7,"favorite":8},534,"BIM工程师",{"id":622,"name":620,"category":7,"favorite":8},535]