[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-860-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":600},{"id":5,"name":6,"category":7,"favorite":8},860,"(装饰质量)专业管理实务 岗位知识","建筑工程",0,6,50,931,[13,34,46,58,70,82,94,106,118,130,142,154,166,175,187,198,210,222,234,246,258,269,281,293,305,315,327,339,351,363,375,387,399,411,423,435,447,459,471,483,491,502,510,522,534,546,556,564,576,588],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1273760,1,"单选题","石灰膏在陈伏期间，表面应覆盖有一层水，以隔绝空气，避免与空气中的（ ）发生碳化反应。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","氧气",false,{"key":24,"text":25,"correct":26},"B","二氧化碳",true,{"key":28,"text":29,"correct":22},"C","一氧化碳",{"key":31,"text":32,"correct":22},"D","甲烷","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1273761,"下列说法不正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"超薄石材蜂窝板用于幕墙时，总厚度不宜小于20mm",{"key":24,"text":41,"correct":22},"石材面板宜进行防护处理",{"key":28,"text":43,"correct":22},"地面用超薄石材蜂窝板面板厚度不宜小于5mm",{"key":31,"text":45,"correct":26},"吊顶用超薄石材蜂窝板面板厚度不宜大于5mm",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1273762,"下列说法错误的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"胶合板质量应符合《胶合板》GB\u002FT9846的要求",{"key":24,"text":53,"correct":26},"中密度纤维板是在装饰工程中广泛应用的纤维板品种，分为普通型、家具型和承重型，质量应符合《中密度纤维板》GB\u002FT11718的要求",{"key":28,"text":55,"correct":22},"刨花板质量应符合《刨花板》GB\u002FT4897的要求",{"key":31,"text":57,"correct":22},"细木工板质量应符合《细木工板》GB\u002FT5849的要求",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1273763,"对水泥，下列说法错误的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"同一生产厂家、同一等级、同一品种、同一批号且连续进场的水泥，袋装不超过200t为一批，散装不超过500t为一批，不足时也按一批计",{"key":24,"text":65,"correct":22},"存放期超过3个月必须进行复检",{"key":28,"text":67,"correct":22},"复验项目：水泥的凝结时间、安定性和抗压强度",{"key":31,"text":69,"correct":26},"进入施工现场每一批水泥应标识品种、规格、数量、生产厂家、日期、检验状态和使用部位，分散摆放。",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1273764,"低温季节水化过程慢，泌水现象普通时，适当考虑加入（ ）以加快硬化速度。",[74,76,78,80],{"key":20,"text":75,"correct":22},"保水剂",{"key":24,"text":77,"correct":22},"缓凝剂",{"key":28,"text":79,"correct":26},"促凝剂",{"key":31,"text":81,"correct":22},"防冻剂",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1273765,"下列不属于水基型胶粘剂的是（。",[86,88,90,92],{"key":20,"text":87,"correct":22},"聚乙酸乙烯酯乳液胶粘剂",{"key":24,"text":89,"correct":22},"水溶性聚乙烯醇建筑胶粘剂",{"key":28,"text":91,"correct":26},"橡胶胶粘剂",{"key":31,"text":93,"correct":22},"其他水基型胶粘剂",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1273767,"相同材料、工艺和施工条件的室外抹灰工程每（ ）m2应划为一个检验批。",[98,100,102,104],{"key":20,"text":99,"correct":26},"500～1000",{"key":24,"text":101,"correct":22},"800",{"key":28,"text":103,"correct":22},"600～1000",{"key":31,"text":105,"correct":22},"1000",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},1273768,"高级室内卫生间门门扇与地面间留缝限值为（ ）mm。",[110,112,114,116],{"key":20,"text":111,"correct":22},"3~5",{"key":24,"text":113,"correct":22},"5~8",{"key":28,"text":115,"correct":26},"8~10",{"key":31,"text":117,"correct":22},"10~20",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1273769,"下列关于检验批抽样样本要求的说法错误的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"随机抽取",{"key":24,"text":125,"correct":22},"分布均匀",{"key":28,"text":127,"correct":22},"具有代表性",{"key":31,"text":129,"correct":26},"全面检查",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},1273770,"相同材料、工艺和施工条件的室内抹灰工程每（ ）个自然间应划分为一个检验批。",[134,136,138,140],{"key":20,"text":135,"correct":22},"20",{"key":24,"text":137,"correct":22},"30",{"key":28,"text":139,"correct":26},"50",{"key":31,"text":141,"correct":22},"100",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},1273771,"有防水要求的建筑地面子分部工程的分项工程施工质量每检验批抽查数量应按其房间总数随机检验不应少于（ ）间。",[146,148,150,152],{"key":20,"text":147,"correct":22},"1",{"key":24,"text":149,"correct":22},"2",{"key":28,"text":151,"correct":22},"3",{"key":31,"text":153,"correct":26},"4",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},1273772,"相同材料、工艺和施工条件的室外抹灰工程每（ ）㎡应划分为一个检验批。",[158,160,162,164],{"key":20,"text":159,"correct":22},"100~200",{"key":24,"text":161,"correct":22},"200~300",{"key":28,"text":163,"correct":22},"300~500",{"key":31,"text":165,"correct":26},"500~1000",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1273773,"楼层梯段相邻踏步高度差不应大于（ ）mm。",[170,172,173,174],{"key":20,"text":171,"correct":26},"10",{"key":24,"text":135,"correct":22},{"key":28,"text":137,"correct":22},{"key":31,"text":139,"correct":22},{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":24,"analysis":33},1273774,"下列关于工程施工质量控制的规定，说法正确的是（ ）。",[179,181,183,185],{"key":20,"text":180,"correct":22},"每道施工工序都必须经监理工程师检查认可后，才能进行下道工序施工",{"key":24,"text":182,"correct":26},"各专业工种之间的相关工序应进行交接检验，并应记录",{"key":28,"text":184,"correct":22},"施工工序完成后，应经班组自检符合规定后，才能进行下道工序施工",{"key":31,"text":186,"correct":22},"施工工序的检查是施工单位内部的事宜，不需要监理工程师参加",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":31,"analysis":33},1273775,"下列不属于溶剂型胶粘剂的（ ）。",[191,192,194,196],{"key":20,"text":91,"correct":22},{"key":24,"text":193,"correct":22},"聚氨酯胶粘剂",{"key":28,"text":195,"correct":22},"其他溶剂型胶粘剂",{"key":31,"text":197,"correct":26},"白乳胶",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":24,"analysis":33},1273776,"检验批的质量验收合格除主控项目、一般项目的质量抽样检验合格外，还应（ ）。",[202,204,206,208],{"key":20,"text":203,"correct":22},"质量控制资料完整",{"key":24,"text":205,"correct":26},"具有完整的施工操作依据、质量验收记录",{"key":28,"text":207,"correct":22},"观感质量符合要求",{"key":31,"text":209,"correct":22},"有关安全、节能、环境保护和主要使用功能的抽样检验结果符合规定",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":28,"analysis":33},1273777,"建筑外门窗物理性能现场检测，相同类型、结构及规格尺寸的试件，应至少检测（ ）。",[214,216,218,220],{"key":20,"text":215,"correct":22},"三攉—",{"key":24,"text":217,"correct":22},"—二樘",{"key":28,"text":219,"correct":26},"三樘",{"key":31,"text":221,"correct":22},"甲樘",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":28,"analysis":33},1273778,"现场粘贴饰面砖粘结强度检验应以每10OOm2同类墙体饰面砖为一个（ ），不足1000m2应按10OOm2计。",[226,228,230,232],{"key":20,"text":227,"correct":22},"单位",{"key":24,"text":229,"correct":22},"施工组",{"key":28,"text":231,"correct":26},"检验批",{"key":31,"text":233,"correct":22},"分部工程",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":20,"analysis":33},1273779,"锚栓抗拔承载力现场检验，对于一般结构构件及非结构构件，可采用非破坏性检验；对于重要结构构件及生命线工程非结构构件，应采用（ ）检验。",[238,240,242,244],{"key":20,"text":239,"correct":26},"破坏性",{"key":24,"text":241,"correct":22},"半破坏性",{"key":28,"text":243,"correct":22},"非破坏性",{"key":31,"text":245,"correct":22},"局部破坏性",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":28,"analysis":33},1273780,"各类设备、家具、灯具的索引符号，通常用（ ）形状表示。",[250,252,254,256],{"key":20,"text":251,"correct":22},"圆形",{"key":24,"text":253,"correct":22},"三角形",{"key":28,"text":255,"correct":26},"正六边形",{"key":31,"text":257,"correct":22},"矩形",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":20,"analysis":33},1273781,"楼梯平台上部及下部过道处的净高不应小于（ ）m。",[262,263,265,267],{"key":20,"text":149,"correct":26},{"key":24,"text":264,"correct":22},"2.2",{"key":28,"text":266,"correct":22},"2.3",{"key":31,"text":268,"correct":22},"2.5",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":31,"analysis":33},1273782,"某商场项目设计文件中，中庭总高度为30m，该区域内采用10mm厚钢化玻璃全玻璃栏板。人口大厅处有若干无框蚀刻玻璃制作的隔断，规格达1800mmx900mm，最薄处厚度仅为10mm。项目部进行图纸会审的过程中认为上述做法不符合规范要求，而要求变更设计文件。根据背景资料，回答下列1~6问题。 根据题意，该工程对于栏板玻璃的使用，正确的是（ ）。",[273,275,277,279],{"key":20,"text":274,"correct":22},"应使用公称厚度不小于5mm的钢化玻璃",{"key":24,"text":276,"correct":22},"应使用公称厚度不小于12mm的钢化玻璃",{"key":28,"text":278,"correct":22},"应使用公称厚度不小于16.76mm的钢化夹层玻璃",{"key":31,"text":280,"correct":26},"不得使用承受水平荷载的栏板玻璃",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":28,"analysis":33},1273783,"某商场项目设计文件中，中庭总高度为30m，该区域内采用10mm厚钢化玻璃全玻璃栏板。人口大厅处有若干无框蚀刻玻璃制作的隔断，规格达1800mmx900mm，最薄处厚度仅为10mm。项目部进行图纸会审的过程中认为上述做法不符合规范要求，而要求变更设计文件。根据背景资料，回答下列1~6问题。 下列关于人口大厅处的无框蚀刻玻璃的说法，正确的是（ ）。",[285,287,289,291],{"key":20,"text":286,"correct":22},"应使用普通平板玻璃",{"key":24,"text":288,"correct":22},"应使用厚度为12mm的玻璃",{"key":28,"text":290,"correct":26},"应使用钢化玻璃",{"key":31,"text":292,"correct":22},"应使用1.5㎡以下的玻璃",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":24,"analysis":33},1273784,"剖立面图一般在（ ）情况下采用。",[297,299,301,303],{"key":20,"text":298,"correct":22},"内部形状简单、外部饰面材料的种类较多",{"key":24,"text":300,"correct":26},"把墙体、梁板及饰面构造较复杂且需在同一立面图中表达",{"key":28,"text":302,"correct":22},"绘制卫生间地面挡水坎部位",{"key":31,"text":304,"correct":22},"绘制复杂的吊顶构造",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":24,"analysis":33},1273785,"某商场项目设计文件中，中庭总高度为30m，该区域内采用10mm厚钢化玻璃全玻璃栏板。人口大厅处有若干无框蚀刻玻璃制作的隔断，规格达1800mmx900mm，最薄处厚度仅为10mm。项目部进行图纸会审的过程中认为上述做法不符合规范要求，而要求变更设计文件。根据背景资料，回答下列1~6问题。 当护栏一侧距楼地面高度为（ ）m以上时，应使用钢化夹层玻璃。",[309,310,312,314],{"key":20,"text":151,"correct":22},{"key":24,"text":311,"correct":26},"5",{"key":28,"text":313,"correct":22},"8",{"key":31,"text":171,"correct":22},{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":24,"analysis":33},1273786,"建筑装饰室内设计立面方案图中，应标注（ ）。",[319,321,323,325],{"key":20,"text":320,"correct":22},"立面范围内的轴线和轴线编号，以及所有轴线间的尺寸",{"key":24,"text":322,"correct":26},"立面主要装饰装修材料和部品部件的名称",{"key":28,"text":324,"correct":22},"明确各立面上装修材料及部品、饰品的种类、名称、拼接图案、不同材料的分界线",{"key":31,"text":326,"correct":22},"楼梯的上下方向",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":24,"analysis":33},1273787,"在某室内装饰设计吊顶平面图中，图例通常表示（ ）。",[331,333,335,337],{"key":20,"text":332,"correct":22},"消防自动喷淋头",{"key":24,"text":334,"correct":26},"感烟探测器",{"key":28,"text":336,"correct":22},"感温探测器",{"key":31,"text":338,"correct":22},"顶装扬声器",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":31,"analysis":33},1273788,"外开门淋浴隔间的尺寸不应小于（ ）。",[343,345,347,349],{"key":20,"text":344,"correct":22},"900mmx1200mm",{"key":24,"text":346,"correct":22},"1000mmx1400mm",{"key":28,"text":348,"correct":22},"1100mmx1400mm",{"key":31,"text":350,"correct":26},"1000mmx1200mm",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":31,"analysis":33},1273789,"以下选项中，识图方法错误的有（ ）。",[355,357,359,361],{"key":20,"text":356,"correct":22},"以平面布置图、吊顶平面图这两张图为基础，分别对应其立面图，熟悉其主要造型及装饰材料",{"key":24,"text":358,"correct":22},"需要从整体（多张图纸）到局部（局部图纸）、从局部到整体看，找出其规律及联系",{"key":28,"text":360,"correct":22},"平面、立面图看完1~2遍后再看详图",{"key":31,"text":362,"correct":26},"开始看图时对于装饰造型或尺寸出现无法对应时，可先用铅笔标识出来不做处理。待对相关的装饰材料进行下单加工时再设法解决",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":24,"analysis":33},1273790,"建筑工程各个专业的图纸中，（ ）图纸是基础。",[367,369,371,373],{"key":20,"text":368,"correct":22},"平面布置",{"key":24,"text":370,"correct":26},"吊顶综合",{"key":28,"text":372,"correct":22},"建筑",{"key":31,"text":374,"correct":22},"结构",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":28,"analysis":33},1273791,"对于建筑装饰图纸，按不同设计阶段分为：概念设计图、（ ）、初步设计图、施工设计图、变更设计图、竣工图等。",[379,381,383,385],{"key":20,"text":380,"correct":22},"手绘透视图",{"key":24,"text":382,"correct":22},"木制品下单图",{"key":28,"text":384,"correct":26},"方案设计图",{"key":31,"text":386,"correct":22},"电气布置图",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":28,"analysis":33},1273792,"以下装饰材料产品加工（材料下单）时，不需要进行工艺深化的有（ ）。",[391,393,395,397],{"key":20,"text":392,"correct":22},"木饰面制品",{"key":24,"text":394,"correct":22},"大理石石材墙板",{"key":28,"text":396,"correct":26},"墙纸",{"key":31,"text":398,"correct":22},"复杂的不锈钢装饰线条",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":28,"analysis":33},1273793,"建筑装饰室内设计吊顶平面施工图中，不需标注（ ）。",[403,405,407,409],{"key":20,"text":404,"correct":22},"主要吊顶造型部位的定位尺寸及间距、标高",{"key":24,"text":406,"correct":22},"吊顶装饰材料及不同的装饰造型",{"key":28,"text":408,"correct":26},"靠近地面的疏散指示标志",{"key":31,"text":410,"correct":22},"吊顶安装的灯具、空调风口、检修口",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":28,"analysis":33},1273794,"总图中没有单位的尺寸（如标高，距离，坐标等），其单位是（ ）。",[415,417,419,421],{"key":20,"text":416,"correct":22},"mm",{"key":24,"text":418,"correct":22},"cm",{"key":28,"text":420,"correct":26},"m",{"key":31,"text":422,"correct":22},"Km",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":24,"analysis":33},1273795,"在某张建筑装饰施工图中，有详图索引，其分母3的含义为（ ）。",[427,429,431,433],{"key":20,"text":428,"correct":22},"图纸的图幅为A3",{"key":24,"text":430,"correct":26},"详图所在图纸编号为3",{"key":28,"text":432,"correct":22},"被索引的图纸编号为3",{"key":31,"text":434,"correct":22},"详图（节点）的编号为3",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":31,"analysis":33},1273796,"卫生间的轻质隔墙底部应做C20混凝土导墙，其高度不应小于（ ）。",[439,441,443,445],{"key":20,"text":440,"correct":22},"100mm",{"key":24,"text":442,"correct":22},"150mm",{"key":28,"text":444,"correct":22},"300mm",{"key":31,"text":446,"correct":26},"200mm",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":24,"analysis":33},1273797,"以下工作中，应以装饰单位现场设计师为主导的工作有（ ）。",[451,453,455,457],{"key":20,"text":452,"correct":22},"绘制隐蔽图纸",{"key":24,"text":454,"correct":26},"向质量员及施工眵咝且进行图纸交底",{"key":28,"text":456,"correct":22},"施工图图纸会审",{"key":31,"text":458,"correct":22},"绘制竣工图",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":20,"analysis":33},1273798,"平面图中标注的楼地面标高为（ ）。",[463,465,467,469],{"key":20,"text":464,"correct":26},"相对标高且是建筑标高",{"key":24,"text":466,"correct":22},"相当标高且是结构标高",{"key":28,"text":468,"correct":22},"绝对标高且是建筑标高",{"key":31,"text":470,"correct":22},"绝对标高且是结构标高",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":20,"analysis":33},1273799,"下列采用喷涂法进行涂饰工程作业时，涂刷顺序正确的是（ ）。",[475,477,479,481],{"key":20,"text":476,"correct":26},"先顶棚后墙面，墙面是先上后下，先左后右",{"key":24,"text":478,"correct":22},"先顶棚后墙面，墙面是先下后上，先左后右",{"key":28,"text":480,"correct":22},"先墙面后顶棚，墙面是先上后下，先左后右",{"key":31,"text":482,"correct":22},"先墙面后顶棚，墙面是先下后上，先左后右",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":24,"analysis":33},1273800,"进行室内楼地面防水涂料涂刷前，应前对阴阳角、管根等处进行处理。阴角要抹成半径不小于（ ）mm的小圆弧。",[487,488,489,490],{"key":20,"text":311,"correct":22},{"key":24,"text":171,"correct":26},{"key":28,"text":135,"correct":22},{"key":31,"text":137,"correct":22},{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":28,"analysis":33},1273801,"轻钢龙骨吊顶安装双层石膏板时，面层板与基层板的接缝应错开不少于（ ）mm，并不得在同一根龙骨上接缝。",[495,496,498,500],{"key":20,"text":141,"correct":22},{"key":24,"text":497,"correct":22},"200",{"key":28,"text":499,"correct":26},"300",{"key":31,"text":501,"correct":22},"500",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":20,"analysis":33},1273802,"进行室内卫生间防水施工时，防水层应从地面延伸到墙面，一般应高于地面（ ）mm。",[506,507,508,509],{"key":20,"text":499,"correct":26},{"key":24,"text":501,"correct":22},{"key":28,"text":101,"correct":22},{"key":31,"text":105,"correct":22},{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":28,"analysis":33},1273803,"轻钢龙骨石膏板吊顶施工时应注意伸缩缝的留置，下列区域可以不预留伸缩缝的是（ ）",[514,516,518,520],{"key":20,"text":515,"correct":22},"大面积吊顶转角处",{"key":24,"text":517,"correct":22},"长度为30m的走廊",{"key":28,"text":519,"correct":26},"面积为15㎡的房间",{"key":31,"text":521,"correct":22},"建筑变形缝处",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":24,"analysis":33},1273804,"下列关于水泥砂浆抹灰施工操作要点的说法，错误的是（ ）。",[526,528,530,532],{"key":20,"text":527,"correct":22},"水泥应颜色一致，宜采用同一批号的水泥，严禁不同品种的水泥混用",{"key":24,"text":529,"correct":26},"砂子宜采用细砂，颗粒要求坚硬洁净，不得含有黏土或有机物等有害物质",{"key":28,"text":531,"correct":22},"抹灰前应检查门窗的位置是否正确，连接处和缝隙应用1：3水泥砂浆分层嵌塞密实",{"key":31,"text":533,"correct":22},"抹灰时，用1：3水泥砂浆做成边长为50mm的方形灰饼",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":24,"analysis":33},1273805,"楼地面找平层施工中，当基层为预制钢筋混凝土板时，填缝采用的细石混凝土强度等级不得小于（ ）。",[538,540,542,544],{"key":20,"text":539,"correct":22},"C15",{"key":24,"text":541,"correct":26},"C20",{"key":28,"text":543,"correct":22},"C25",{"key":31,"text":545,"correct":22},"C30",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":24,"analysis":33},1273806,"在木饰面板干挂安装时，一般采用12mm厚优质多层板制作挂件，安装挡距为（ ）mm。",[550,551,553,555],{"key":20,"text":497,"correct":22},{"key":24,"text":552,"correct":26},"400",{"key":28,"text":554,"correct":22},"600",{"key":31,"text":101,"correct":22},{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":28,"analysis":33},1273807,"进行室内装修木质材料表面防火涂料处理作业时，应对木质材料的所有表面进行均匀涂刷，涂刷防火涂料用量不应少于（ ）g\u002F㎡。",[560,561,562,563],{"key":20,"text":141,"correct":22},{"key":24,"text":499,"correct":22},{"key":28,"text":501,"correct":26},{"key":31,"text":105,"correct":22},{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":31,"analysis":33},1273808,"下列关于轻钢龙骨隔墙封纸面石膏板施工时，自攻螺钉钉距设置正确的是（ ）。",[568,570,572,574],{"key":20,"text":569,"correct":22},"板边钉距300mm，板中间距为200mm，螺钉距石膏板边缘距离不得小于20mm，也不得大于35mm",{"key":24,"text":571,"correct":22},"板边钉距300mm，板中间距为200mm，螺钉距石膏板边缘距离不得小于10mm，也不得大于16mm",{"key":28,"text":573,"correct":22},"板边钉距200mm，板中间距为300m，螺钉距石膏板边缘距离不得小于20mm，也不得大于35mm",{"key":31,"text":575,"correct":26},"板边钉距200mm，板中间距为300mm，螺钉距石膏板边缘距离不得小于10mm，也不得大于16mm",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":24,"analysis":33},1273809,"窗帘轨安装时，当窗宽大于（ ）m时，窗帘轨中间应断开，断开处应煨弯错开，弯曲度应平缓。",[580,582,584,586],{"key":20,"text":581,"correct":22},"0.9",{"key":24,"text":583,"correct":26},"1.2",{"key":28,"text":585,"correct":22},"1.5",{"key":31,"text":587,"correct":22},"1.8",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":24,"analysis":33},1273810,"建筑装饰装修工程所使用的材料应按设计要求进行（ ）处理。",[592,594,596,598],{"key":20,"text":593,"correct":22},"防爆、防滑和防火",{"key":24,"text":595,"correct":26},"防火、防腐和防虫",{"key":28,"text":597,"correct":22},"防水、防滑和防爆",{"key":31,"text":599,"correct":22},"防腐、防电和防爆",[601,604,607,610,613,616],{"id":15,"name":602,"category":7,"favorite":603},"领导干部任职前廉政法规知识测试题",92,{"id":605,"name":606,"category":7,"favorite":15},595,"建筑结构与设备",{"id":608,"name":609,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":611,"name":612,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":614,"name":615,"category":7,"favorite":8},534,"BIM工程师",{"id":617,"name":615,"category":7,"favorite":8},535]