[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-860-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":709},{"id":5,"name":6,"category":7,"favorite":8},860,"(装饰质量)专业管理实务 岗位知识","建筑工程",0,11,50,931,[13,38,53,68,83,97,111,124,139,153,168,182,194,208,222,236,251,265,279,294,305,320,334,348,362,376,391,406,420,434,448,463,477,491,504,518,527,540,554,568,583,598,610,624,634,647,656,670,681,695],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1274012,2,"多选题","下列质量验收过程需要对观感质量进行验收的有（ ）。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","工序质量验收",false,{"key":24,"text":25,"correct":22},"B","检验批质量验收",{"key":27,"text":28,"correct":22},"C","分项工程质量验收",{"key":30,"text":31,"correct":32},"D","分部工程质量验收",true,{"key":34,"text":35,"correct":32},"E","单位工程质量验收","DE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1274013,"单位工程质量验收合格除所含分部工程的质量验收均应合格外，还应符合（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":32},"质量控制资料应完整",{"key":24,"text":45,"correct":32},"所含分部工程中有关安全、节能、环境保护和主要使用功能的检验资料应完整",{"key":27,"text":47,"correct":32},"主要使用功能的抽查结果应符合相关专业验收规范的规定",{"key":30,"text":49,"correct":32},"观感质量应符合要求",{"key":34,"text":51,"correct":22},"专业监理工程师组织施工单位所进行竣工预验收质量合格","ABCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1274014,"裱糊与软包工程验收时应检查下列文件和记录（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":32},"裱糊与软包工程的施工图、设计说明及其他设计文件",{"key":24,"text":60,"correct":32},"饰面材料的样板及确认文件",{"key":27,"text":62,"correct":32},"材料的产品合格证书、性能检测报告、进场验收记录和复验报告",{"key":30,"text":64,"correct":22},"隐蔽工程验收记录",{"key":34,"text":66,"correct":22},"后置埋件的现场拉拔检测报告","ABC",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1274015,"建筑地面子分部工程的检验方法应符合下列规定（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":32},"检查允许偏差应采用钢尺、1m直尺、2m直尺、3m直尺、2m靠尺、楔形塞尺、坡度尺、游标卡尺和水准仪",{"key":24,"text":75,"correct":32},"检查空鼓应采用敲击的方法",{"key":27,"text":77,"correct":32},"检查防水隔离层应采用蓄水方法，蓄水深度最浅处不得小于10mm，蓄水时间不得少于24h",{"key":30,"text":79,"correct":32},"检查有防水要求的建筑地面的面层应采用泼水方法",{"key":34,"text":81,"correct":32},"检查各类面层（含不需铺设部分或局部面层）表面的裂纹、脱皮、麻面和起砂等缺陷，应采用观感法","ABCDE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":82,"analysis":37},1274016,"质量控制点的重点控制对象包括（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":32},"A.材料的质量与性能",{"key":24,"text":90,"correct":32},"施工方法与关键操作",{"key":27,"text":92,"correct":32},"易发生或常见的质量通瘸",{"key":30,"text":94,"correct":32},"新技术、新材料及新工艺的应用",{"key":34,"text":96,"correct":32},"产品质量不稳定和不合格率较高的工序应列为重点.认真分析.严格控制",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":67,"analysis":37},1274017,"对于具体的建设项目，主要通过（ ）实行对建设工程项目质量的保证作用。",[101,103,105,107,109],{"key":20,"text":102,"correct":32},"技术工作的组织与管理",{"key":24,"text":104,"correct":32},"优化技术方案",{"key":27,"text":106,"correct":32},"发挥技术因素",{"key":30,"text":108,"correct":22},"技术的引进",{"key":34,"text":110,"correct":22},"项目优化",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":123,"analysis":37},1274018,"某礼堂在图纸上位于H~K的轴及⑥~⑨轴之间。该礼堂在地面找平层施工前进行基层检查，发现混凝土表面有2mm左右的裂缝。经分析研究后认为该裂缝不影响结构的安全和使用功能。地面找平层施工工艺步骤如下：材料准备一基层清理一测量与标高控制一铺找平层一刷素水泥浆结合层一养护一验收。根据背景资料，回答下列1~6问题。 施工图纸中的定位轴线，不宜出现的字母有（ ）。",[115,116,117,119,121],{"key":20,"text":30,"correct":22},{"key":24,"text":34,"correct":22},{"key":27,"text":118,"correct":32},"O",{"key":30,"text":120,"correct":32},"I",{"key":34,"text":122,"correct":32},"Z","CDE",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":138,"analysis":37},1274019,"轻钢龙骨隔墙工程施工质量控制点的预防措施（ ）。",[128,130,132,134,136],{"key":20,"text":129,"correct":32},"按照设计图纸进行定位并做预检记录",{"key":24,"text":131,"correct":32},"检查隔墙龙骨的安装间距是否与交底相符合",{"key":27,"text":133,"correct":32},"龙自攻螺钉的间距控制在150mm左右，要求均匀布置",{"key":30,"text":135,"correct":22},"涂料的遍数一定要保证，保证涂刷均匀；控制基层含水率",{"key":34,"text":137,"correct":32},"板块之间应预留缝隙保证在5mm左右","ABCE",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":67,"analysis":37},1274020,"下列不属于地面面砖工程的施工质量控制点（ ）。",[143,145,147,149,151],{"key":20,"text":144,"correct":32},"地面砖釉面色差及棱边缺损，面砖规格偏差翘曲",{"key":24,"text":146,"correct":32},"地面砖排版、砖缝不直、宽窄不均匀、勾缝不实",{"key":27,"text":148,"correct":32},"有防水要求的房间地面找坡、管道处套割",{"key":30,"text":150,"correct":22},"吊筋安装与机电管道等相接处",{"key":34,"text":152,"correct":22},"墙面修补不好，阴阳角偏差",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":167,"analysis":37},1274021,"轻钢龙骨石膏板吊顶工程控制点的预防措施（ ）。",[157,159,161,163,165],{"key":20,"text":158,"correct":32},"吊顶内基层应将模板、松散混凝土等杂物清理干净",{"key":24,"text":160,"correct":32},"吊顶内的吊筋不能与机电、通风管道和固定件相接触或连接",{"key":27,"text":162,"correct":22},"墙面的空鼓、裂缝等应提前修补",{"key":30,"text":164,"correct":32},"当短向跨度≥4m时，主龙骨按短向跨度1\u002F1000～3\u002F1000起拱",{"key":34,"text":166,"correct":32},"石膏板板缝之间应留楔口，表面粘玻璃纤维布","ABDE",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":181,"analysis":37},1274022,"金属贴面工程施工质量控制点的预防措施包括（ ）。",[172,173,175,177,179],{"key":20,"text":158,"correct":22},{"key":24,"text":174,"correct":32},"根据设计图纸的要求和几何尺寸.要对镶贴金属饰面板的墙面进行吊直、套方、找规矩并一次实测和弹线.确定饰面墙板的尺寸和数量",{"key":27,"text":176,"correct":32},"骨架的横竖杆件是通过连接件与结构固定的.而连接件与结构之间.可以与结构的预埋件焊牢.也可以在墙上打膨胀螺栓",{"key":30,"text":178,"correct":32},"骨架应预先进行防腐处理",{"key":34,"text":180,"correct":22},"石膏板板缝之间应留楔口.表面粘玻璃纤维布","BCD",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":181,"analysis":37},1274023,"木护墙、木筒子板细结构工程的施工质量控制点的预防措施（ ）。",[186,187,189,191,193],{"key":20,"text":158,"correct":22},{"key":24,"text":188,"correct":32},"木龙骨、衬板必须提前做防腐、防火处理",{"key":27,"text":190,"correct":32},"龙骨、衬板、面板含水率控制在12％左右",{"key":30,"text":192,"correct":32},"面板进场时应加强检验，在施工前必须进行挑选，按设计要求的花纹达到一致，在同一墙面、房间要颜色一致",{"key":34,"text":166,"correct":22},{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":82,"analysis":37},1274024,"质量控制点应选择那些（ ）的对象进行设置。",[198,200,202,204,206],{"key":20,"text":199,"correct":32},"对工程质量形成过程产生直接影响的关键部位、工序、环节及隐蔽工程",{"key":24,"text":201,"correct":32},"施工过程中的薄弱环节，或者质量不稳定的工序、部位或对象",{"key":27,"text":203,"correct":32},"采用新技术、新工艺、新材料的部位或环节",{"key":30,"text":205,"correct":32},"对下道工序有较大影响的上道工序",{"key":34,"text":207,"correct":32},"施工质量无把握的、施工条件困难的或技术难度大的工序或环节",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":82,"analysis":37},1274025,"地面石材控制工程的施工控制点的预防措施（ ）。",[212,214,216,218,220],{"key":20,"text":213,"correct":32},"对缺棱掉角的石材应挑选出来，铺装时应拉线找直，控制板块的安装边平直",{"key":24,"text":215,"correct":32},"基层在施工前一定要将落地灰等杂物清理干净",{"key":27,"text":217,"correct":32},"石材进场时必须进行检验与样板对照，并对石材每一块进行挑选检查，符合要求的留下，不符合要求的放在一边",{"key":30,"text":219,"correct":32},"石材铺装时应预铺，符合要求后正式铺装，保证干硬性砂浆的配合比和结合层砂浆的配合及涂刷时间，保证石材铺装下的砂浆饱满",{"key":34,"text":221,"correct":32},"石材铺装好后加强保护严禁随意踩踏，铺装时，应用水平尺检查",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":52,"analysis":37},1274026,"施工成品形成后可采取（ ）等相应措施进行保护。",[226,228,230,232,234],{"key":20,"text":227,"correct":32},"防护",{"key":24,"text":229,"correct":32},"覆盖",{"key":27,"text":231,"correct":32},"封闭",{"key":30,"text":233,"correct":32},"包裹",{"key":34,"text":235,"correct":22},"保温",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":250,"analysis":37},1274027,"技术交底应根据工程规模和技术复杂程度不同采取相应的方法，常用的方法包括（ ）。",[240,242,244,246,248],{"key":20,"text":241,"correct":22},"分项工程技术交底",{"key":24,"text":243,"correct":32},"书面交底",{"key":27,"text":245,"correct":22},"防水工程技术交底",{"key":30,"text":247,"correct":32},"口头交底",{"key":34,"text":249,"correct":32},"样板交底","BDE",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":82,"analysis":37},1274028,"水电安装工程施工质量控制点中给排水工程包括（ ）。",[255,257,259,261,263],{"key":20,"text":256,"correct":32},"管道试压",{"key":24,"text":258,"correct":32},"焊接管坡口",{"key":27,"text":260,"correct":32},"检查口、清扫口",{"key":30,"text":262,"correct":32},"室外管网垫层、管基回填",{"key":34,"text":264,"correct":32},"持证上岗",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":138,"analysis":37},1274029,"下列属于地面石材控制工程的施工控制点为（。",[269,271,273,275,277],{"key":20,"text":270,"correct":32},"基层处理",{"key":24,"text":272,"correct":32},"石材色差.加工尺寸偏差",{"key":27,"text":274,"correct":32},"石材铺装空鼓.裂缝.板块之间高低差",{"key":30,"text":276,"correct":22},"骨架安装高低差、平整度",{"key":34,"text":278,"correct":32},"石材铺装平整度.缺棱掉角.板块之间缝隙不直或出现大小头",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":293,"analysis":37},1274030,"轻钢龙骨石膏板吊顶工程控制点（ ）。",[283,285,287,289,291],{"key":20,"text":284,"correct":22},"基层弹线",{"key":24,"text":286,"correct":32},"基层清理",{"key":27,"text":288,"correct":32},"龙骨起拱",{"key":30,"text":290,"correct":32},"施工顺序",{"key":34,"text":292,"correct":32},"板缝处理","BCDE",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":181,"analysis":37},1274031,"涂料工程的施工质量控制点包括（ ）。",[298,299,300,301,303],{"key":20,"text":284,"correct":22},{"key":24,"text":286,"correct":32},{"key":27,"text":152,"correct":32},{"key":30,"text":302,"correct":32},"涂料的遍数、漏底、均匀度、刷纹",{"key":34,"text":304,"correct":22},"地面砖出现小窄边、破活",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":319,"analysis":37},1274032,"室内防水工程的施工质量控制点（ ）。",[309,311,313,315,317],{"key":20,"text":310,"correct":22},"基层应清理干净，抹灰前要浇水湿润，注意砂浆配合比，使底层砂浆与楼板粘结牢固",{"key":24,"text":312,"correct":32},"厕浴间的基层（找平层）可采用1：3水泥砂浆找平，厚度20mm抹平压光、坚实平整，不起砂，要求基本干燥",{"key":27,"text":314,"correct":32},"浴室墙面的防水层不得低于1800mm",{"key":30,"text":316,"correct":22},"玻纤布的接槎应顺流水方向搭接，搭接宽度应不小于200mm，两层以上玻纤布的防水施工，上、下搭接应错开幅宽的二分之一",{"key":34,"text":318,"correct":32},"在墙面和地面相交的阴角处，出地面管道根部和地漏周围，应先做防水附加层","BCE",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":123,"analysis":37},1274033,"门窗工程的施工质量控制点的预防措施（ ）",[324,326,328,330,332],{"key":20,"text":325,"correct":22},"基层应清理干净，抹灰前要浇水湿润，注意砂浆配合比，使底层砂浆与楼板粘结牢固；抹灰时应分层分遍压实，施工完后及时浇水养护",{"key":24,"text":327,"correct":22},"抹灰前要认真用托线板、靠尺对抹灰墙面尺寸预测摸底，安排好阴阳角不同两个面的灰层厚度和方正，认真做好灰饼、冲筋",{"key":27,"text":329,"correct":32},"砌筑时上下左右拉线找规矩，一般门窗框上皮应低于门窗过梁10～15mm，窗框下皮应比窗台上皮高5mm",{"key":30,"text":331,"correct":32},"合页位置应距门窗上下端宜取立梃高度的1\u002F10",{"key":34,"text":333,"correct":32},"安装人员必须按照工艺要点施工，安装前先弹线找规矩，做好准备工作后，先安样板，合格后再全面安装",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":52,"analysis":37},1274034,"建筑工程质量验收应划分为（ ）。",[338,340,342,344,346],{"key":20,"text":339,"correct":32},"检验批",{"key":24,"text":341,"correct":32},"分项工程",{"key":27,"text":343,"correct":32},"分部工程",{"key":30,"text":345,"correct":32},"单位工程",{"key":34,"text":347,"correct":22},"单项工程",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":67,"analysis":37},1274035,"为了保证建设工程质量，我国规定对工程所使用的主要材料、半成品、构配件以及施工过程留置的试块、试件等应实行现场见证取样送检。（ ），包括取样见证记录、样本编号、填单、封箱、送试验室、核对、交接、试验检测、报告等。",[352,354,356,358,360],{"key":20,"text":353,"correct":32},"见证人员由建设单位及工程监理机构中有相关专业知识的人员担任",{"key":24,"text":355,"correct":32},"送检的试验室应具备经国家或地方工程检验检测主管部门核准的相关资质",{"key":27,"text":357,"correct":32},"见证取样送检必须严格按执行规定的程序进行",{"key":30,"text":359,"correct":22},"改变建筑节点构造、管线位置或走向",{"key":34,"text":361,"correct":22},"见证人员必须持证上岗",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":52,"analysis":37},1274036,"计量控制开工前要（ ）。",[366,368,370,372,374],{"key":20,"text":367,"correct":32},"建立和完善施工现场计量管理的规章制度",{"key":24,"text":369,"correct":32},"明确计量控制责任者和配置必要的计量人员",{"key":27,"text":371,"correct":32},"严格按规定对计量器具进行维修和校验",{"key":30,"text":373,"correct":32},"统一计量单位，组织量值传递，保证量值统一，从而保证施工过程中计量的准确",{"key":34,"text":375,"correct":22},"进行工程项目检查验收的项目划分和编号",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":390,"analysis":37},1274037,"影响建设工程项目质量的社会因素，表现在（ ）。",[380,382,384,386,388],{"key":20,"text":381,"correct":32},"建设法律法规的健全程度及其执法力度",{"key":24,"text":383,"correct":32},"建设工程项目法人或业主的理性化程度",{"key":27,"text":385,"correct":22},"建设工程项目的进度",{"key":30,"text":387,"correct":32},"建设工程经营者的经营理念",{"key":34,"text":389,"correct":22},"施工单位的安全意识","ABD",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":405,"analysis":37},1274038,"实践证明，（ ），所形成的合格而用途的建筑产品，从根本上是社会资源的极大浪费，不具备质量的适用性特征。",[395,397,399,401,403],{"key":20,"text":396,"correct":32},"没有经过资源论证、市场需求预测",{"key":24,"text":398,"correct":22},"由国家统一规划建设",{"key":27,"text":400,"correct":32},"重复建设",{"key":30,"text":402,"correct":32},"建成后不能投入生产使用",{"key":34,"text":404,"correct":22},"建设后归国有企业多有","ACD",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":390,"analysis":37},1274039,"门窗工程的施工质量控制点包括（ ）",[410,412,414,416,418],{"key":20,"text":411,"correct":32},"门窗洞口尺寸",{"key":24,"text":413,"correct":32},"合页、螺钉、合页槽",{"key":27,"text":415,"correct":22},"抹灰平整度，阴阳角垂直、方正度",{"key":30,"text":417,"correct":32},"上下页门窗顺直度，左右门窗安装标高",{"key":34,"text":419,"correct":22},"石材挑选，色差，返碱，水渍",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":319,"analysis":37},1274040,"事后控制包括（ ）。",[424,426,428,430,432],{"key":20,"text":425,"correct":22},"明示或者暗示施工单位使用不合格的建筑材料、建筑构配件和设备的",{"key":24,"text":427,"correct":32},"对质量活动结果的评价、认定",{"key":27,"text":429,"correct":32},"对工序质量偏差的纠正",{"key":30,"text":431,"correct":22},"对施工现场存在的重大安全隐患未向建设主管部门报告",{"key":34,"text":433,"correct":32},"对不合格产品进行整改和处理。",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":181,"analysis":37},1274041,"根据《建筑工程施工质量验收统一标准》GB50300--2001的规定，建筑工程质量验收应逐级划分为（ ）。",[438,440,442,444,446],{"key":20,"text":439,"correct":22},"配置必要的计量人员",{"key":24,"text":441,"correct":32},"单位（子单位）工程",{"key":27,"text":443,"correct":32},"分部（子分部）工程",{"key":30,"text":445,"correct":32},"分项工程和检验批",{"key":34,"text":447,"correct":22},"审核相关质量文件",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":462,"analysis":37},1274042,"工序是（ ）对工程质量综合起作用的过程，所以对施工过程的质量控制，必须以工序作业质量控制为基础和核心。",[452,454,456,458,460],{"key":20,"text":453,"correct":32},"人、材料",{"key":24,"text":455,"correct":32},"机械设备、施工方法",{"key":27,"text":457,"correct":22},"施工工艺、人员调度",{"key":30,"text":459,"correct":22},"社会因素和环境因素",{"key":34,"text":461,"correct":22},"自然因素","AB",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":52,"analysis":37},1274043,"建设工程项目质量的影响因素，主要是指在建设工程项目质量目标策划、决策和实现过程中影响质量形成的各种客观因素和主观因素，包括（ ）等。",[467,469,471,473,475],{"key":20,"text":468,"correct":32},"人的因素",{"key":24,"text":470,"correct":32},"技术因素",{"key":27,"text":472,"correct":32},"管理因素",{"key":30,"text":474,"correct":32},"环境因素",{"key":34,"text":476,"correct":22},"经济因素",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":293,"analysis":37},1274044,"要做好施工质量控制点的事前质量预控工作，包括（ ）。",[481,483,485,487,489],{"key":20,"text":482,"correct":22},"施工单位使用合格的建筑材料、建筑构配件和设备",{"key":24,"text":484,"correct":32},"明确质量控制的目标与控制参数",{"key":27,"text":486,"correct":32},"编制作业指导书和质量控制措施",{"key":30,"text":488,"correct":32},"确定质量检查检验方式及抽样的数量与方法",{"key":34,"text":490,"correct":32},"明确检查结果的判断标准及质量记录与信息反馈要求",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":293,"analysis":37},1274045,"饰面板（砖）工程的施工质量控制点的预防措施：（ ）。",[495,496,498,500,502],{"key":20,"text":419,"correct":22},{"key":24,"text":497,"correct":32},"石材选样后进行封样，按照选样石材，对进场的石材检验挑选，对于色差较大的应进行更换",{"key":27,"text":499,"correct":32},"严格按照设计要求的骨架固定方式，固定牢固，后置埋件应做现场拉拔试验，必须按要求刷防锈漆处理",{"key":30,"text":501,"correct":32},"安装石材应吊垂直线和拉水平线控制，避免出现高低差",{"key":34,"text":503,"correct":32},"石材在运输、二次加工、安装过程中注意不要磕碰",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":319,"analysis":37},1274046,"我国《建筑法》和《建设工程质量管理条例》规定：建筑施工企业对工程的施工质量负责，建筑施工企业必须按照（，对建筑材料、建筑构配件和设备进行检验，不合格的不得使用。",[508,510,512,514,516],{"key":20,"text":509,"correct":22},"市场多需建筑",{"key":24,"text":511,"correct":32},"工程设计要求",{"key":27,"text":513,"correct":32},"施工技术标准",{"key":30,"text":515,"correct":22},"监理单位的要求",{"key":34,"text":517,"correct":32},"合同的约定",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":319,"analysis":37},1274047,"我国《建筑法》和《建设工程质量管理条例》规定：建筑施工企业对工程的施工质量负责，建筑施工企业必须按照（ ），对建筑材料、建筑构配件和设备进行检验，不合格的不得使用。",[522,523,524,525,526],{"key":20,"text":509,"correct":22},{"key":24,"text":511,"correct":32},{"key":27,"text":513,"correct":32},{"key":30,"text":515,"correct":22},{"key":34,"text":517,"correct":32},{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":293,"analysis":37},1274048,"水电安装工程施工质量控制点中电气工程的（ ）。",[531,532,534,536,538],{"key":20,"text":262,"correct":22},{"key":24,"text":533,"correct":32},"线管、线盒",{"key":27,"text":535,"correct":32},"防雷跨接",{"key":30,"text":537,"correct":32},"室外电力管",{"key":34,"text":539,"correct":32},"线缆敷设标识",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":52,"analysis":37},1274049,"施工工程质量自控的要求（ ）。",[544,546,548,550,552],{"key":20,"text":545,"correct":32},"预防为主",{"key":24,"text":547,"correct":32},"重点控制",{"key":27,"text":549,"correct":32},"坚持标准",{"key":30,"text":551,"correct":32},"记录完整",{"key":34,"text":553,"correct":22},"保证安全",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":82,"analysis":37},1274050,"根据实践经验的总结，施工质量自控的有效制度有：（ ）。",[558,560,562,564,566],{"key":20,"text":559,"correct":32},"质量自检制度",{"key":24,"text":561,"correct":32},"质量例会制度",{"key":27,"text":563,"correct":32},"质量会诊制度",{"key":30,"text":565,"correct":32},"质量样板制度",{"key":34,"text":567,"correct":32},"质量挂牌制度",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":582,"analysis":37},1274052,"（ ）环境条件的认识与把握，是保证建设工程项目质量的重要工作环节。",[572,574,576,578,580],{"key":20,"text":573,"correct":32},"自然环境",{"key":24,"text":575,"correct":22},"社会环境",{"key":27,"text":577,"correct":22},"家庭环境",{"key":30,"text":579,"correct":32},"劳动作业环境",{"key":34,"text":581,"correct":32},"管理环境","ADE",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":597,"analysis":37},1274053,"施工作业质量的自控过程是由施工作业组织的成员进行的，其基本的控制程序包括（ ）。",[587,589,591,593,595],{"key":20,"text":588,"correct":32},"作业技术交底",{"key":24,"text":590,"correct":22},"作业活动质量验收",{"key":27,"text":592,"correct":32},"作业质量的自检自查",{"key":30,"text":594,"correct":32},"作业质量的互检互查",{"key":34,"text":596,"correct":32},"作业质量的专职管理人员检查","ACDE",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":390,"analysis":37},1274054,"糊工程施工质量控制点（ ）。",[602,604,606,607,609],{"key":20,"text":603,"correct":32},"基层起砂、空鼓、裂缝等问题",{"key":24,"text":605,"correct":32},"壁纸裁纸准确度",{"key":27,"text":288,"correct":22},{"key":30,"text":608,"correct":32},"壁纸裱糊气泡、皱褶、翘边、脱落、死塌等缺陷",{"key":34,"text":292,"correct":22},{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":597,"analysis":37},1274055,"影响建筑装饰工程项目质量的技术因素涉及的内容十分广泛，包括直接的工程技术和辅助的生产技术，前者如（ ）等。",[614,616,618,620,622],{"key":20,"text":615,"correct":32},"工程勘察技术",{"key":24,"text":617,"correct":22},"试验技术",{"key":27,"text":619,"correct":32},"设计技术",{"key":30,"text":621,"correct":32},"材料技术",{"key":34,"text":623,"correct":32},"施工技术",{"id":625,"libraryId":5,"type":15,"typeLabel":16,"stem":626,"options":627,"answer":52,"analysis":37},1274056,"根据《建筑工程施工质量验收统一标准》GB50300-2013的规定，建筑工程质量验收应逐级划分为（ ）。",[628,629,630,631,632],{"key":20,"text":441,"correct":32},{"key":24,"text":443,"correct":32},{"key":27,"text":341,"correct":32},{"key":30,"text":339,"correct":32},{"key":34,"text":633,"correct":22},"工序",{"id":635,"libraryId":5,"type":15,"typeLabel":16,"stem":636,"options":637,"answer":52,"analysis":37},1274057,"在建设工程项目施工过程中，因（ ）等，需要通过设计单位明确或确认的，施工方必须以技术核定单的方式向监理工程师提出，报送设计单位核准确认。",[638,640,642,644,645],{"key":20,"text":639,"correct":32},"施工方对施工图纸的某些要求不甚明白",{"key":24,"text":641,"correct":32},"图纸内部存在某些矛盾",{"key":27,"text":643,"correct":32},"工程材料调整与代用",{"key":30,"text":359,"correct":32},{"key":34,"text":646,"correct":22},"施工单位人员调整问题",{"id":648,"libraryId":5,"type":15,"typeLabel":16,"stem":649,"options":650,"answer":67,"analysis":37},1274058,"对于具体的建设项目，主要通过（ ）对建设工程项目质量的保证作用。",[651,652,653,654,655],{"key":20,"text":102,"correct":32},{"key":24,"text":104,"correct":32},{"key":27,"text":106,"correct":32},{"key":30,"text":108,"correct":22},{"key":34,"text":110,"correct":22},{"id":657,"libraryId":5,"type":15,"typeLabel":16,"stem":658,"options":659,"answer":82,"analysis":37},1274059,"在正式施工前进行的事前主动质量控制，通过编制（ ），分析可能导致质量目标偏离的各，针对这些影响因素制定有效的预防措施，防患于未然。",[660,662,664,666,668],{"key":20,"text":661,"correct":32},"编制施工质量计划",{"key":24,"text":663,"correct":32},"明确质量目标",{"key":27,"text":665,"correct":32},"制定施工方案",{"key":30,"text":667,"correct":32},"设置质量管理点",{"key":34,"text":669,"correct":32},"落实质量责任",{"id":671,"libraryId":5,"type":15,"typeLabel":16,"stem":672,"options":673,"answer":181,"analysis":37},1274060,"金属贴面工程施工质量控制点的预防措施（ ）。",[674,675,677,679,680],{"key":20,"text":158,"correct":22},{"key":24,"text":676,"correct":32},"根据设计图纸的要求和几何尺寸，要对镶贴金属饰面板的墙面进行吊直、套方、找规矩并一次实测和弹线，确定饰面墙板的尺寸和数量",{"key":27,"text":678,"correct":32},"骨架的横竖杆件是通过连接件与结构固定的，而连接件与结构之间，可以与结构的预埋件焊牢，也可以在墙上打膨胀螺栓",{"key":30,"text":178,"correct":32},{"key":34,"text":166,"correct":22},{"id":682,"libraryId":5,"type":15,"typeLabel":16,"stem":683,"options":684,"answer":52,"analysis":37},1274061,"按有关施工验收规范规定，在装饰装修工程中，幕墙工程的下列工序质量必须进行现场质量检测，合格后才能进行下道工序（ ）。",[685,687,689,691,693],{"key":20,"text":686,"correct":32},"铝塑复合板的剥离强度检验",{"key":24,"text":688,"correct":32},"石材的弯曲强度、室内用花岗石的放射性检测、寒冷地区石材的耐冻性",{"key":27,"text":690,"correct":32},"玻璃幕墙用结构胶的邵氏硬度、标准条件拉伸粘结强度、石材用密封胶的污染性检测",{"key":30,"text":692,"correct":32},"建筑幕墙的气密性、水密性、风压变形性能、层间变位性能检测",{"key":34,"text":694,"correct":22},"硅酮密封胶相容性检测",{"id":696,"libraryId":5,"type":15,"typeLabel":16,"stem":697,"options":698,"answer":167,"analysis":37},1274062,"现场施工准备工作的质量控制包括（ ）。",[699,701,703,705,707],{"key":20,"text":700,"correct":32},"计量控制",{"key":24,"text":702,"correct":32},"测量控制",{"key":27,"text":704,"correct":22},"工程质量控制",{"key":30,"text":706,"correct":32},"施工平面图控制",{"key":34,"text":708,"correct":32},"工程质量检查验收的划分项目",[710,714,717,720,723,726],{"id":711,"name":712,"category":7,"favorite":713},1,"领导干部任职前廉政法规知识测试题",92,{"id":715,"name":716,"category":7,"favorite":711},595,"建筑结构与设备",{"id":718,"name":719,"category":7,"favorite":711},715,"招标采购专业知识与法律法规",{"id":721,"name":722,"category":7,"favorite":711},848,"市政方向-通用基础",{"id":724,"name":725,"category":7,"favorite":8},534,"BIM工程师",{"id":727,"name":725,"category":7,"favorite":8},535]