[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1274090":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1274090,860,2,"多选题","影响项目质量的环境因素，又包括项目的（ ）环境因素。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","自然",true,{"key":16,"text":17,"correct":14},"B","社会",{"key":19,"text":20,"correct":14},"C","管理",{"key":22,"text":23,"correct":14},"D","作业",{"key":25,"text":26,"correct":27},"E","政治",false,"ABCD","建设工程项目质量的影响因素，主要是指在建设工程项目质量目标策划、决策和实现过程的各种客观因素和主观因素，包括人的因素、技术因素、管理因素、环境因素和社会因素等。决策因素和组织因素是影响建设工程项目质量的管理因素",{"id":6,"name":31,"category":32,"favorite":33},"(装饰质量)专业管理实务 岗位知识","建筑工程",0]