[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1274076":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1274076,860,2,"多选题","糊工程施工质量控制点的预防措施（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","贴壁纸前应对墙面基层用腻子找平，保证墙面的平整度，并且不起灰，基层牢固",true,{"key":16,"text":17,"correct":14},"B","壁纸裁纸时应搭设专用的裁纸平台，采用铝尺等专用工具",{"key":19,"text":20,"correct":21},"C","墙面的空鼓、裂缝等应提前修补",false,{"key":23,"text":24,"correct":14},"D","裱糊过程中应按照施工规程进行操作，必须润纸的应提前进行，保证质量；刷胶要均匀厚薄一致，滚压均匀",{"key":26,"text":27,"correct":14},"E","施工时应注意表面平整，因此先要检查基层的平整度","ABDE","糊工程施工质量控制点的预防措施：①贴壁纸前应对墙面基层用腻子找平，保证墙面的平整度，并且不起灰，基层牢固。②壁纸裁纸时应搭设专用的裁纸平台，采用铝尺等专用工具。③裱糊过程中应按照施工规程进行操作，必须润纸的应提前进行，保证质量；刷胶要均匀厚薄一致，滚压均匀。④施工时应注意表面平整，因此先要检查基层的平整度；施工时应戴白手套；接缝要直，阴角处壁纸宜断开。",{"id":6,"name":31,"category":32,"favorite":33},"(装饰质量)专业管理实务 岗位知识","建筑工程",0]