[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1274073":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1274073,860,2,"多选题","涂料工程的施工质量控制点的预防措施（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","基层一定要清理干净，有油污的应用10％的火碱水液清洗，松散的墙面和抹灰应除，修补牢固",true,{"key":16,"text":17,"correct":18},"B","吊顶内的吊筋不能与机电、通风管道和固定件相接触或连接",false,{"key":20,"text":21,"correct":14},"C","墙面的空鼓、裂缝等应提前修补",{"key":23,"text":24,"correct":18},"D","当短向跨度≥4m时，主龙骨按短向跨度1\u002F1000～3\u002F1000起拱",{"key":26,"text":27,"correct":18},"E","石膏板板缝之间应留楔口，表面粘玻璃纤维布","AC","涂料工程的施工质量控制点的预防措施：①基层一定要清理干净，有油污的应用10％的火碱水液清洗，松散的墙面和抹灰应除，修补牢固。②墙面的空鼓、裂缝等应提前修补。③涂料的遍数一定要保证，保证涂刷均匀；控制基层含水率。④对涂料的稠度必须控制，不能随意加水等。",{"id":6,"name":31,"category":32,"favorite":33},"(装饰质量)专业管理实务 岗位知识","建筑工程",0]